Plan Review Stops For Permit 20080566
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2020-12-08 Cont ID  
Sent By cthroop Date 2020-12-08 Time 08:50 Rev Time 0.00
Received By cthroop Date 2020-12-08 Time 08:25 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2020-11-13 Cont ID  
Sent By shill Date 2020-11-13 Time 12:47 Rev Time 0.00
Received By shill Date 2020-11-13 Time 12:47 Sent To  
Notes
2020-11-13 12:49:39****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 FBC 107, IT IS NOT CLEAR WHICH SLAB IS PROPOSED.
 ENGINEERING FOR BOTH A CONCRETE PAD AND A FOAM CORE
 CONCRETE PAD WERE SUBMITTED. PLEASE ADVISE AND A REVIEW
 WILL BE DONE. ONE OF THE TWO DETAILS NEEDS TO BE
 REMOVED; THIS WILL BE DONE AFTER YOU ADVISE WHICH ONE
 YOU ARE USING.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-08-21 Cont ID  
Sent By shill Date 2020-08-21 Time 13:40 Rev Time 0.00
Received By shill Date 2020-08-21 Time 13:24 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-08-26 Cont ID  
Sent By cthroop Date 2020-08-26 Time 07:06 Rev Time 0.00
Received By cthroop Date 2020-08-26 Time 06:55 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2020-08-31 Cont ID  
Sent By medwards Date 2020-08-31 Time 15:06 Rev Time 0.00
Received By medwards Date 2020-08-31 Time 15:06 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2020-08-13 Cont ID  
Sent By medwards Date 2020-08-13 Time 09:43 Rev Time 0.00
Received By medwards Date 2020-08-13 Time 06:44 Sent To  
Notes
2020-08-13 09:43:131ST REVIEW FBC-2017 MECHANICAL
 PERMIT-20080566
  
 CODES IN EFFECT:
  
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH
 EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) PLEASE PROVIDE A SURVEY INDICATING LOCATION OF
 UNDERGROUND LP GAS TANK AND GENERATOR LOCATION ON THIS
 PROPERTY. FBC FS 107.2.1
  
 2) PROVIDE A GAS RISER DIAGRAM FOR THIS PROJECT, IT
 SHOULD INCLUDE REGULATORS AND PRESSURES OF EACH ALONG
 WITH SHUT OFF VALVES LOCATIONS, UNION FITTINGS, DRIP
 LEGS, AND PIPING MATERIAL AND LENGTHS. FBC FS 107.2.1
  
 3) PLEASE MARK REGULATORS USED ON THE SUBMITTED
 REGULATOR SPECS. FBC FS 107.2.1
  
 4) PLEASE MARK SIZE USED OF THE ANODELESS RISERS SPECS
 PROVIDED IN THIS SUBMITTAL. FBC FS 107.2.1
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD
 SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER
 SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN
 THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS
 PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS
 PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR
 UPDATED.
  
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2020-12-08 Cont ID  
Sent By cthroop Date 2020-12-08 Time 08:50 Rev Time 0.00
Received By cthroop Date 2020-12-08 Time 08:25 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-11-13 Cont ID  
Sent By shill Date 2020-11-13 Time 12:50 Rev Time 0.00
Received By shill Date 2020-11-04 Time 16:41 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-08-31 Cont ID  
Sent By ccarvaja Date 2020-08-28 Time 08:53 Rev Time 0.00
Received By ccarvaja Date 2020-08-12 Time 13:42 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2020-08-21 Cont ID  
Sent By ccole Date 2020-08-21 Time 12:36 Rev Time 0.00
Received By ccole Date 2020-08-21 Time 12:36 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2020-12-08 Cont ID  
Sent By cthroop Date 2020-12-08 Time 08:50 Rev Time 0.00
Received By cthroop Date 2020-12-08 Time 08:26 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2020-11-13 Cont ID  
Sent By shill Date 2020-11-13 Time 12:49 Rev Time 0.00
Received By shill Date 2020-11-13 Time 12:49 Sent To  
Notes
2020-11-13 12:49:59SEE BUILDING

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-08-21 Cont ID  
Sent By medwards Date 2020-08-13 Time 09:47 Rev Time 0.00
Received By shill Date 2020-08-21 Time 13:41 Sent To  
Notes
2020-08-21 13:42:00****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 DOCUMENTS PREPARED BY AN ENGINEER AND SUBMITTED FOR
 PUBLIC RECORD ARE TO BE SIGNED, SEALED, DATED
 ORIGINALS. A SCAN OF A WET SIGNATURE IS NOT CONSIDERED
 A DIGITAL SIGNATURE.
  
 EITHER UPLOAD A DIGITALLY SIGNED DOCUMENT OR DROP OFF
 (OR MAIL) ONE PAPER ORIGINAL:
  
 BUILDING DIVISION, FIRST FLOOR
 CITY OF WEST PALM BEACH
 401 CLEMATIS ST
 WEST PALM BEACH, FL 33401
  
  

Review Stop Z ZONING
Rev No 1 Status P Date 2020-08-28 Cont ID  
Sent By kalexand Date 2020-08-28 Time 16:48 Rev Time 0.00
Received By kalexand Date 2020-08-28 Time 16:48 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved