Plan Review Details - Permit 20080536
Plan Review Stops For Permit 20080536 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2020-11-19 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-11-19 |
Time |
10:19 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-11-19 |
Time |
10:19 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2020-10-06 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-10-06 |
Time |
08:09 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-10-06 |
Time |
07:30 |
Sent To |
|
|
Notes |
2020-10-06 08:09:27 | PLAN | | REVIEW COMMENTS | | | | 2ND REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THE ANCHOR SPACING TABLE IN THE CORRUGATED PANEL | | SCHEDULE ON PAGE 2 OF 10 ON THE PRODUCT APPROVAL FOR | | THE CLEAR PANELS HAS THE SPANS AND PRESSURES FOR 13" | | SPACING. I DO NOT SEE ANYTHING THAT ALLOWS HIGHER | | PRESSURES FOR CLOSER ANCHOR SPACING. BASED ON THE TABLE | | THE PANELS WITH THE 108" SPAN ARE ONLY GOOD FOR 35 PSF | | AND THE PANELS SPANNING 128" ARE ONLY GOOD FOR 30 PSF. | | THESE PRESSURES ARE TOO LOW FOR THESE OPENINGS. FBC | | 107.2.1 & FBC-R301.2.1.2 | | | | PER YOUR INSTALLATION SCHEDULE OPENINGS #9 AND 10 HAVE | | A PANEL SPAN 116" AND OPENING #27 HAS A PANEL SPAN OF | | 128". THE TABLE FOR THE CLEAR CORRUGATED PANELS ON PAGE | | 2 OF 10 OF THE PRODUCT APPROVAL HAS PRESSURES OF LESS | | THAN THE 50 PSF THAT IS REQUIRED PER YOUR INSTALLATION | | SCHEDULE. SINCE THESE DO NOT MEET THE REQUIRED | | PRESSURES THEY CAN NOT BE APPROVED FOR THIS PROJECT. | | OPENINGS #7 WITH THE 91" SPAN AND #18 WITH THE 82" SPAN | | BOTH HAVE PRESSURES OF MORE THAN 50 PSF AND ARE | | ACCEPTABLE. THE ANCHOR SPACING IS 13" O.C. PER THE | | TABLE ON PAGE 2 OF 10. YOU CAN NOT USE ANY OTHER | | SPACING WITHOUT SIGNED AND SEALED CALCULATIONS FROM AN | | ENGINEER. | | | | 2) PLEASE PROVIDE A RESPONSE LETTER EXPLAINING HOW | | THESE COMMENTS WILL BE ADDRESSED. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2020-09-28 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-09-28 |
Time |
11:01 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-09-28 |
Time |
11:01 |
Sent To |
|
|
Notes |
2020-09-28 11:24:34 | PLAN | | REVIEW COMMENTS | | | | 2ND REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THE ANCHOR SPACING TABLE IN THE CORRUGATED PANEL | | SCHEDULE ON PAGE 2 OF 10 ON THE PRODUCT APPROVAL FOR | | THE CLEAR PANELS HAS THE SPANS AND PRESSURES FOR 13" | | SPACING. I DO NOT SEE ANYTHING THAT ALLOWS HIGHER | | PRESSURES FOR CLOSER ANCHOR SPACING. BASED ON THE TABLE | | THE PANELS WITH THE 108" SPAN ARE ONLY GOOD FOR 35 PSF | | AND THE PANELS SPANNING 128" ARE ONLY GOOD FOR 30 PSF. | | THESE PRESSURES ARE TOO LOW FOR THESE OPENINGS. FBC | | 107.2.1 & FBC-R301.2.1.2 | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2020-09-11 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-09-11 |
Time |
14:53 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-09-11 |
Time |
14:04 |
Sent To |
|
|
Notes |
2020-09-11 15:09:16 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THE ANCHOR SPACING TABLE IN THE PRODUCT APPROVAL FOR | | THE CLEAR PANELS IS ILLEGIBLE. I WAS NOT ABLE TO VERIFY | | THE ANCHOR SPACING. SUBMIT LEGIBLE PRODUCT APPROVAL. | | FBC 107.2.1 | | | | 2) THE ANCHOR SPACING IN THE SCHEDULE FOR THE ROLL UP | | DOOR OF 9" IS NOT CORRECT FOR 50 PSF, A 118" SPAN, | | TRAPPED MOUNT AND 5/16 TAPCONS. THE ANCHOR SPACING | | TABLE ON SHEET 17 HAS 5.5" FOR THIS INSTALLATION. THE | | 9" ANCHOR SPACING IS FOR 3/8" DIAMETER KWIK BOLT 3 | | ANCHORS IN THE TABLE ON SHEET 16. FBC 107.2.1 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2020-08-21 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-08-21 |
Time |
15:48 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-08-21 |
Time |
15:46 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2020-11-19 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-11-19 |
Time |
10:19 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-11-12 |
Time |
14:19 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2020-10-06 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-10-06 |
Time |
08:09 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-09-29 |
Time |
11:20 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2020-09-28 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-09-28 |
Time |
11:24 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-09-17 |
Time |
13:10 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2020-09-11 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-09-11 |
Time |
14:53 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-08-13 |
Time |
11:47 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
N |
Date |
2020-09-11 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-09-11 |
Time |
14:53 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-09-11 |
Time |
14:04 |
Sent To |
|
|
Notes |
2020-08-21 15:49:57 | ELECTRICAL PLAN IS OK |
|
|
|
Account Summary | Usage Policy | Privacy Policy