Plan Review Details - Permit 20080354
Plan Review Stops For Permit 20080354
Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 2 Status P Date 2020-09-15 Cont ID  
Sent By gpatrie Date 2020-09-15 Time 08:15 Rev Time 0.00
Received By gpatrie Date   Time   Sent To  
Notes
2020-09-15 08:15:33NO COMMENT.

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status F Date 2020-09-10 Cont ID  
Sent By gpatrie Date 2020-09-10 Time 08:18 Rev Time 0.00
Received By gpatrie Date 2020-09-10 Time 08:14 Sent To  
Notes
2020-09-10 08:18:01DRAWING NEED TO BE SHOWN OVER AN AERIAL TO DETERMIN THE
 EXACT LOCATION.
 TYPE OF TABLE AND CHAIRS (STANDARD HEIGHT OR HIGH
 TOPS).
 NUMBER OF TABLE AND CHAIRS.

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2020-09-10 Cont ID  
Sent By pleduc Date 2020-09-10 Time   Rev Time 0.00
Received By pleduc Date 2020-09-10 Time 15:42 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2020-08-10 Cont ID  
Sent By pleduc Date 2020-08-10 Time   Rev Time 0.00
Received By pleduc Date 2020-08-10 Time 13:33 Sent To  
Notes
2020-08-10 13:41:08THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 FIRE HAS NO OBJECTION TO THE PROPOSED, THERE NEEDS TO
 BE BETTER DEFINED INFORMATION ON THE PLAN SHEET.
  
 1) THERE IS NO LEGEND ON THE PLAN SHEET IDENTIFYING
 WHAT THE COLORED SYMBOLS INDICATE.
  
 WHAT ARE THE BLUE CIRCLES/DOTS AND WHAT ARE THE RED
 CIRCLE/DOTS?
  
 PLEASE PROVIDE A LEGEND.
  
  
 1A) ARE THESE HIGHTOP TABLES WITH NO CHAIRS?
  
 HOW MANY CHAIRS AT EACH TABLE?
  
  
  
 1B) WHAT ARE THE DISTANCES BETWEEN EACH TABLE?
  
 AS THESE ARE IN THE OPEN WALKWAY, WHAT IS THE PROPOSED
 DIMENSION OF THE OPEN WALKWAYS AFTER THE TABLES ARE
 INSTALLED?
  
  
  
  
 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By lmarchan Date 2020-09-11 Time 14:15 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-09-11 Cont ID  
Sent By shill Date 2020-09-11 Time 07:53 Rev Time 0.00
Received By shill Date 2020-08-07 Time 08:32 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2020-09-09 Cont ID  
Sent By aaponte Date 2020-09-09 Time 08:34 Rev Time 0.00
Received By aaponte Date 2020-09-09 Time 08:34 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2020-08-10 Cont ID  
Sent By aaponte Date 2020-08-10 Time 09:10 Rev Time 0.00
Received By aaponte Date 2020-08-10 Time 09:10 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved