Plan Review Details - Permit 20080274
Plan Review Stops For Permit 20080274
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-08-21 Cont ID  
Sent By shill Date 2020-08-21 Time 09:49 Rev Time 0.00
Received By shill Date 2020-08-21 Time 09:44 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-08-22 Cont ID  
Sent By cthroop Date 2020-08-22 Time 08:51 Rev Time 0.00
Received By cthroop Date 2020-08-22 Time 08:47 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-08-22 Cont ID  
Sent By cthroop Date 2020-08-22 Time 08:51 Rev Time 0.00
Received By cthroop Date 2020-08-05 Time 14:37 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-08-13 Cont ID  
Sent By jgomez Date 2020-08-13 Time 14:39 Rev Time 0.00
Received By jgomez Date 2020-08-13 Time 14:37 Sent To  
Notes
2020-08-13 14:39:47ENGINEER DRAWING MATCHES ONE UPLOADED TO PROJECTDOX.
 CONCRETE PAD ENGINEERING DRAWING WITH EMBOSSED SEAL AND
 ORIGINAL SIGNATURE SENT TO STORAGE. JG.

Review Stop Z ZONING
Rev No 1 Status P Date 2020-08-14 Cont ID  
Sent By rthermid Date 2020-08-14 Time   Rev Time  
Received By rthermid Date 2020-08-14 Time   Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved