Plan Review Details - Permit 20071267
Plan Review Stops For Permit 20071267
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-10-06 Cont ID  
Sent By cthroop Date 2020-10-06 Time 08:21 Rev Time 0.00
Received By cthroop Date 2020-10-06 Time 08:06 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-08-15 Cont ID  
Sent By cthroop Date 2020-08-15 Time 14:39 Rev Time 0.00
Received By cthroop Date 2020-08-15 Time 14:05 Sent To  
Notes
2020-08-15 14:40:38PLAN REVIEW GENERATOR - BUILDING
  
 CHRISTOPHER S. THROOP, C.B.O.
 PLANS EXAMINER BUILDING - PX3169
 PLANS EXAMINER 1&2 FAMILY - SFP306
 CONSTRUCTION SERVICES DIVISION
 TEL: 561-805-6726
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
 CODES IN EFFECT:
 2017 FLORIDA BUILDING CODE, 6TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
  
 1ST REVIEW
  
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 GENERATOR PAD
  
  
 1) PROVIDE SITE SPECIFIC WIND LOAD DESIGN PRESSURE
 CALCULATIONS FOR THE GENERATOR PER FBC 107.3.5.3 AND
 R301.2 AND AS REQUIRED PER THE GENERATOR PAD
 ENGINEERING. CANNOT VERIFY IF THE GENERATOR PAD WIND
 LOADS OF 36.35 ARE ADEQUATE.
 ASSUMED DESIGN CRITERIA FOR THIS SITE: VULT OF 170MPH,
 (FIGURE R301.2(4) ) VASD OF 132MPH (TABLE R301.2.1.3)
 RISK CATEGORY I AND EXPOSURE CATEGORY C.
 2) THE MINIMUM GENERATOR WEIGHT REQUIREMENT ON THE PAD
 DESIGN IS 466LBS. THE WEIGHT OF THE PROPOSED GENERATOR
 IS 445LBS.
 SUBMIT NEW PAD DESIGN FOR PROPOSED GENERATOR.
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-08-15 Cont ID  
Sent By cthroop Date 2020-08-15 Time 14:38 Rev Time 0.00
Received By cthroop Date 2020-08-15 Time 14:05 Sent To  
Notes
2020-08-15 14:39:00PROVISO: PROVIDE ATS SPEC'S TO CITY INSPECTOR. CT

Review Stop G GAS REVIEW
Rev No 1 Status P Date 2020-08-15 Cont ID  
Sent By cthroop Date 2020-08-15 Time 14:38 Rev Time 0.00
Received By cthroop Date 2020-08-15 Time 14:05 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-10-06 Cont ID  
Sent By cthroop Date 2020-10-06 Time 08:21 Rev Time 0.00
Received By cthroop Date 2020-09-21 Time 15:21 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-09-21 Cont ID  
Sent By cpuell Date 2020-09-21 Time 14:15 Rev Time 0.00
Received By cpuell Date 2020-07-27 Time 14:41 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2020-08-15 Cont ID  
Sent By cthroop Date 2020-08-15 Time 14:05 Rev Time 0.00
Received By cthroop Date 2020-08-15 Time 14:05 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-10-06 Cont ID  
Sent By cthroop Date 2020-10-06 Time 08:21 Rev Time 0.00
Received By cthroop Date 2020-10-06 Time 08:06 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-08-13 Cont ID  
Sent By jgomez Date 2020-08-13 Time 14:43 Rev Time 0.00
Received By jgomez Date 2020-08-13 Time 14:41 Sent To  
Notes
2020-08-13 14:44:05ENGINEER DRAWING MATCHES ONE UPLOADED TO PROJECTDOX.
 CONCRETE PAD ENGINEERING DRAWING WITH EMBOSSED SEAL AND
 ORIGINAL SIGNATURE SENT TO STORAGE. JG.
  

Review Stop Z ZONING
Rev No 1 Status P Date 2020-09-21 Cont ID  
Sent By kalexand Date 2020-09-21 Time 11:08 Rev Time 0.00
Received By kalexand Date 2020-09-21 Time 11:08 Sent To I
Notes
***NONE***