Plan Review Details - Permit 20071177
Plan Review Stops For Permit 20071177
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-08-14 Cont ID  
Sent By rmcdouga Date 2020-08-14 Time 14:42 Rev Time 0.00
Received By rmcdouga Date 2020-08-14 Time 14:42 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-08-05 Cont ID  
Sent By rmcdouga Date 2020-08-05 Time 17:29 Rev Time 0.00
Received By rmcdouga Date 2020-08-05 Time 17:29 Sent To  
Notes
2020-08-05 17:43:06PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) HI LIGHT OR CIRCLE ALL OF THE APPROPIATE ITEMS IN
 THE PRODUCT APPROVAL INCLUDING THE DESIGN PRESSURE AND
 TYPE OF INSULATION. FBC 107.2
  
 2) THE ROOFING SYSTEM THAT WAS SUBMITTED TYPE A(4) ON
 PAGES15-16 OF THE PRODUCT APPROVAL REQUIRES AT LEAST
 ONE LAYER OF THE LISTED INSULATIONS. THE MAXIMUM DESIGN
 PRESSURE FOR THIS SYSTEM IS -60 PSF, WHICH IS TOO LOW
 FOR THE PERIMETER AND CORNER ROOF AREAS. THE LIMITATION
 #7 REQUIRES THAT SIGNED AND SEALED CALCULATIONS ARE
 SUBMITTED FOR ENHANCED FASTENING IN THESE AREAS TO
 INCREASE THE DESIGN PRESSURES. SUBMIT THE REQUIRED
 DOCUMENTS. FBC 107.2
  
 3) SUBMIT A ROOF DIAGRAM OF THE BUILDING. SPECIFY THE
 ROOF HEIGHT AND SHOW DIMENSIONS OF THE ROOF. INDICATE
 ANY ROOF DRAINS, PARAPET WALLS, SCUPPERS, ETC. FBC
 107.2.1

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-08-14 Cont ID  
Sent By rmcdouga Date 2020-08-14 Time 14:43 Rev Time 0.00
Received By rmcdouga Date 2020-08-06 Time 14:00 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-08-05 Cont ID  
Sent By rmcdouga Date 2020-08-05 Time 17:43 Rev Time 0.00
Received By rmcdouga Date 2020-07-27 Time 10:51 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status N Date 2020-08-14 Cont ID  
Sent By rmcdouga Date 2020-08-14 Time 14:42 Rev Time 0.00
Received By rmcdouga Date 2020-08-14 Time 14:42 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-08-05 Cont ID  
Sent By rmcdouga Date 2020-08-05 Time 17:28 Rev Time 0.00
Received By rmcdouga Date 2020-08-05 Time 17:28 Sent To  
Notes
2020-08-05 17:29:12SIGNED AND SEALED RAS 117 CALCULATIONS ARE REQUIRED BY
 PRODUCT APPROVAL.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved