Plan Review Details - Permit 20070878
Plan Review Stops For Permit 20070878
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-08-19 Cont ID  
Sent By rmcphers Date 2020-08-19 Time 09:25 Rev Time 0.00
Received By rmcphers Date 2020-08-19 Time 09:22 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status N Date 2020-08-17 Cont ID  
Sent By jleahy Date 2020-08-17 Time 16:59 Rev Time 0.00
Received By jleahy Date 2020-08-17 Time 16:58 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-09-17 Cont ID  
Sent By lcrespo Date 2020-09-17 Time 15:41 Rev Time 0.00
Received By lcrespo Date 2020-09-17 Time 15:41 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-08-19 Cont ID  
Sent By rmcphers Date 2020-08-19 Time 09:25 Rev Time 0.00
Received By rmcphers Date 2020-08-04 Time 16:47 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2020-09-17 Cont ID  
Sent By lcrespo Date 2020-09-17 Time 15:41 Rev Time 0.00
Received By lcrespo Date 2020-09-17 Time 15:41 Sent To  
Notes
2020-09-17 15:42:1709/17/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-08-13 Cont ID  
Sent By lcrespo Date 2020-08-13 Time 10:23 Rev Time 0.00
Received By lcrespo Date 2020-08-13 Time 10:23 Sent To  
Notes
2020-08-13 10:53:2708/13/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. ALL INFORMATION, DRAWINGS, SPECIFICATIONS AND
 ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF
 THE PERSON RESPONSIBLE FOR THE DESIGN PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 2. A SUB PLUMBING PERMIT IS REQUIRED BY A LICENSED
 CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS
 TO THE FBC SEC. 105.1.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2020-08-13 Cont ID  
Sent By lcrespo Date 2020-08-13 Time 10:55 Rev Time 0.00
Received By lcrespo Date 2020-08-13 Time 10:55 Sent To  
Notes
2020-08-13 10:59:49THE DRAWING ARE NOT DESIGNED BY ARCHITECT OR ENGINEER

Review Stop Z ZONING
Rev No 1 Status N Date 2020-08-14 Cont ID  
Sent By elevesqu Date 2020-08-14 Time 15:45 Rev Time 0.00
Received By elevesqu Date 2020-08-14 Time 15:45 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved