Plan Review Details - Permit 20070871
Plan Review Stops For Permit 20070871
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-08-21 Cont ID  
Sent By rmcdouga Date 2020-08-21 Time 08:55 Rev Time 0.00
Received By rmcdouga Date 2020-08-21 Time 08:55 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-08-10 Cont ID  
Sent By rmcdouga Date 2020-08-10 Time 10:00 Rev Time 0.00
Received By rmcdouga Date 2020-08-10 Time 10:00 Sent To  
Notes
2020-08-10 10:14:05PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE GENERATOR PAD ENGINEERING THAT WAS SUBMITTED
 REQUIRES THE 22KW GENERATOR TO HAVE A MINIMUM WEIGHT OF
 466 LB. AND THE SPECIFICATIONS THAT WERE SUBMITTED FOR
 THE GENERAC 22KW GENERATOR LISTS THE WEIGHT FOR THIS
 GENERATOR AS 445 LBS. THEREFORE, IT DOES NOT MEET THE
 MINIMUM WEIGHT REQUIREMENT OF THE ENGINEERING. FBC 107

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-08-11 Cont ID  
Sent By cthroop Date 2020-08-11 Time 16:23 Rev Time 0.00
Received By cthroop Date 2020-08-11 Time 15:41 Sent To  
Notes
2020-08-11 16:24:16PROVISO: PROVIDE ATS SPEC'S TO CITY INSPECTOR. CT

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-08-21 Cont ID  
Sent By rmcdouga Date 2020-08-21 Time 08:58 Rev Time 0.00
Received By rmcdouga Date 2020-08-17 Time 07:27 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-08-13 Cont ID  
Sent By lmarchan Date 2020-08-13 Time 09:22 Rev Time 0.00
Received By lmarchan Date 2020-07-22 Time 14:14 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2020-08-27 Cont ID  
Sent By shill Date 2020-08-27 Time 13:16 Rev Time 0.00
Received By shill Date 2020-08-27 Time 13:16 Sent To  
Notes
2020-08-27 13:16:40PAPER ORIGINAL RECEIVED 8/3

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2020-08-21 Cont ID  
Sent By rmcdouga Date 2020-08-21 Time 08:55 Rev Time 0.00
Received By rmcdouga Date 2020-08-21 Time 08:55 Sent To  
Notes
2020-08-21 08:58:03THE GENERATOR PAD DRAWING IS NOT DIGITALLY SIGNED. THE
 CONTRACTOR CAN SUBMIT A PAPER DRAWING WITH THE
 ENGINEER'S HANDWRITTEN SIGNATURE AND SEAL OR RESUBMIT
 THE DRAWING ELECTRONICALLY WITH THE ENGINEER'S DIGITAL
 SIGNATURE.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-08-03 Cont ID  
Sent By pvalenti Date 2020-08-03 Time 15:47 Rev Time 0.00
Received By pvalenti Date 2020-08-03 Time 15:47 Sent To  
Notes
2020-08-03 15:48:45PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
 FBC M = FBC MECHANICAL
  
 SIGNATURE REVIEW DENIED AS WINDLOAD PAGE IS MISSING
 (SEE PRESSURE DESIGN NOTE OF CONCRETE PAD PAGE).
 ORIGINAL SIGNATURES ARE ON THE SUBMITTED CONCRETE PAD
 PAGE.

Review Stop Z ZONING
Rev No 1 Status P Date 2020-08-12 Cont ID  
Sent By kalexand Date 2020-08-12 Time 23:59 Rev Time 0.00
Received By kalexand Date 2020-08-12 Time 23:59 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved