Plan Review Details - Permit 20070863
Plan Review Stops For Permit 20070863
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-10-16 Cont ID  
Sent By pvalenti Date 2020-10-16 Time 10:31 Rev Time 0.00
Received By pvalenti Date 2020-10-16 Time 10:31 Sent To  
Notes
2020-10-16 10:41:31PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 BUILDING REVIEW APPROVED WITH PROVISOS:
  
 1) AS THIS ELEVATION CERTIFICATE IS AT THE UNDER
 CONSTRUCTION STAGE, THIS IS ACCEPTABLE.
 FOR THE ELEVATION CERTIFICATE AT THE FINISHED
 CONSTRUCTION STAGE, THE METHOD USED TO DETERMINE THE
 LATITUDE AND LONGITUDE NEEDS TO BE ENTERED IN THE
 COMMENT AREA OF SECTION D.
  
 2) THE PLAN SHEETS WILL NEED TO BE SUBMITTED AS A
 REVISION UNDER THE CORRECT PERMIT NUMBER TO INDICATE
 THE CORRECT FINISHED FLOOR ELEVATION.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-07-22 Cont ID  
Sent By pvalenti Date 2020-07-22 Time 07:59 Rev Time 0.00
Received By pvalenti Date 2020-07-22 Time 07:59 Sent To  
Notes
2020-07-22 08:36:33PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
 FBC M = FBC MECHANICAL
  
 ELEVATION CERTIFICATE REVIEW DENIED:
  
 1) SECTION A5; AS PER THE FEMA INSTRUCTIONS FOR
 COMPLETING THE ELEVATION CERTIFICATE, PLEASE INDICATE
 THE METHOD USED TO DETERMINE THE LATITUDE AND LONGITUDE
 IN THE COMMENTS AREA OF SECTION D.
  
 2) SECTION C2A; THE TOP OF BOTTOM FLOOR INDICATES AN
 ELEVATION OF 8.51'. THE PLAN SHEET A-101 INDICATES A
 FINISHED FLOOR ELEVATION OF 9.5'. THESE ELEVATIONS
 SHOULD MATCH. PLEASE REVISE TO MATCH.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-10-16 Cont ID  
Sent By pvalenti Date 2020-10-16 Time 10:47 Rev Time 0.00
Received By pvalenti Date 2020-07-28 Time 14:49 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-07-22 Cont ID  
Sent By pvalenti Date 2020-07-22 Time 08:37 Rev Time 0.00
Received By pvalenti Date 2020-07-22 Time 07:59 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-10-16 Cont ID  
Sent By pvalenti Date 2020-10-16 Time 10:43 Rev Time 0.00
Received By pvalenti Date 2020-10-16 Time 10:43 Sent To  
Notes
2020-10-16 10:45:57PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 SIGNATURE REVIEW APPROVED WITH PROVISO:
  
 THE NEXT ELEVATION CERTIFICATE FOR THE FINISHED
 CONSTRUCTION NEEDS TO BE SUBMITTED WITH THE ORIGINAL
 SIGNATURE AND SEAL.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved