Plan Review Details - Permit 20070863
Plan Review Stops For Permit 20070863 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2020-10-16 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2020-10-16 |
Time |
10:31 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2020-10-16 |
Time |
10:31 |
Sent To |
|
|
Notes |
2020-10-16 10:41:31 | PETER E VALENTI | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6673 | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | FBC R = FBC RESIDENTIAL | | FBC M = FBC MECHANICAL | | FBC FG = FBC FUEL GAS | | | | BUILDING REVIEW APPROVED WITH PROVISOS: | | | | 1) AS THIS ELEVATION CERTIFICATE IS AT THE UNDER | | CONSTRUCTION STAGE, THIS IS ACCEPTABLE. | | FOR THE ELEVATION CERTIFICATE AT THE FINISHED | | CONSTRUCTION STAGE, THE METHOD USED TO DETERMINE THE | | LATITUDE AND LONGITUDE NEEDS TO BE ENTERED IN THE | | COMMENT AREA OF SECTION D. | | | | 2) THE PLAN SHEETS WILL NEED TO BE SUBMITTED AS A | | REVISION UNDER THE CORRECT PERMIT NUMBER TO INDICATE | | THE CORRECT FINISHED FLOOR ELEVATION. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2020-07-22 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2020-07-22 |
Time |
07:59 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2020-07-22 |
Time |
07:59 |
Sent To |
|
|
Notes |
2020-07-22 08:36:33 | PETER E VALENTI | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6673 | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | FBC R = FBC RESIDENTIAL | | FBC M = FBC MECHANICAL | | | | ELEVATION CERTIFICATE REVIEW DENIED: | | | | 1) SECTION A5; AS PER THE FEMA INSTRUCTIONS FOR | | COMPLETING THE ELEVATION CERTIFICATE, PLEASE INDICATE | | THE METHOD USED TO DETERMINE THE LATITUDE AND LONGITUDE | | IN THE COMMENTS AREA OF SECTION D. | | | | 2) SECTION C2A; THE TOP OF BOTTOM FLOOR INDICATES AN | | ELEVATION OF 8.51'. THE PLAN SHEET A-101 INDICATES A | | FINISHED FLOOR ELEVATION OF 9.5'. THESE ELEVATIONS | | SHOULD MATCH. PLEASE REVISE TO MATCH. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2020-10-16 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2020-10-16 |
Time |
10:47 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2020-07-28 |
Time |
14:49 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2020-07-22 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2020-07-22 |
Time |
08:37 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2020-07-22 |
Time |
07:59 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2020-10-16 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2020-10-16 |
Time |
10:43 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2020-10-16 |
Time |
10:43 |
Sent To |
|
|
Notes |
2020-10-16 10:45:57 | PETER E VALENTI | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6673 | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | FBC R = FBC RESIDENTIAL | | FBC M = FBC MECHANICAL | | FBC FG = FBC FUEL GAS | | | | SIGNATURE REVIEW APPROVED WITH PROVISO: | | | | THE NEXT ELEVATION CERTIFICATE FOR THE FINISHED | | CONSTRUCTION NEEDS TO BE SUBMITTED WITH THE ORIGINAL | | SIGNATURE AND SEAL. |
|
|
|