Plan Review Details - Permit 20070291
Plan Review Stops For Permit 20070291
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-07-23 Cont ID  
Sent By rmcdouga Date 2020-07-23 Time 18:36 Rev Time 0.00
Received By rmcdouga Date 2020-07-23 Time 16:33 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-07-11 Cont ID  
Sent By jleahy Date 2020-07-11 Time 12:32 Rev Time 0.00
Received By jleahy Date 2020-07-11 Time 10:46 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2020-07-13 Cont ID  
Sent By pleduc Date 2020-07-13 Time   Rev Time 0.00
Received By pleduc Date 2020-07-09 Time 11:03 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2020-08-18 Cont ID  
Sent By abelisle Date 2020-08-18 Time 17:52 Rev Time 0.00
Received By abelisle Date 2020-08-17 Time 16:28 Sent To I
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2020-07-27 Cont ID  
Sent By tklarge Date 2020-07-27 Time 10:56 Rev Time 0.00
Received By tklarge Date 2020-07-27 Time 10:03 Sent To  
Notes
2020-07-27 10:27:211) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY
 COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND
 FBC-2017 FUEL GAS CODE SEC. 402.2, AND 301.3 GAS
 APPLIANCES SHALL BE LISTED AND LABELED. THE
 INSTALLATION MANUALS FOR ALL GAS APPLIANCES / EQUIPMENT
 SHALL BE ONSITE AT THE TIME OF INSPECTION. FGC
 SEC.305.1.
 2) SHOW THE LOCATION OF THE TANKLESS WATER HEATER ON
 THE PLANS. WPB AMEND. TO FBC SEC. 107.2.1.
 3) SIZE ALL THE INDIVIDUAL BRANCH LINES TO THE
 APPLIANCES/EQUIPMENT.
 4) SHOW THE REQUIRED SHUTOFF VALVES FFOR EACH
 APPLIANCE. FBC-FUEL GAS SEC.409.5.
 5) A UNION IS REQUIRED WITHIN ONE FOOT UPSTREAM OR
 DOWNSTREAM OF THE REGULATOR AT THE OUTLET OF THE GAS
 METER. FBC-GAS SEC.410.2 (7).
 6) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE GAS
 APPLIANCES. FBC-FUEL GAS SEC.304.1.
 7) UPON ACTIVATION OF ANY FIRE-EXTINGUISHING SYSTEM FOR
 A COOKING OPERATION, ALL SOURCES OF FUEL AND ELECTRICAL
 POWER THAT PRODUCE HEAT TO ALL EQUIPMENT REQUIRING
 PROTECTION BY THAT SYSTEM SHALL AUTOMATICALLY SHUT OFF
 PER 2014 NFPA 96, SEC. 10.4.1.
 8) A READILY ACCESSIBLE MEANS FOR MANUAL ACTIVATION
 SHALL BE LOCATED BETWEEN 1067 MM AND 1219 MM (42 IN.
 AND 48 IN.) ABOVE THE FLOOR, BE ACCESSIBLE IN THE EVENT
 OF A FIRE, BE LOCATED IN A PATH OF EGRESS, AND CLEARLY
 IDENTIFY THE HAZARD PROTECTED. NFPA 96, SEC. 10.5.1.
 9) AT LEAST ONE MANUAL ACTUATION DEVICE SHALL BE
 LOCATED A MINIMUM OF 3 M (10 FT) AND A MAXIMUM OF 6 M
 (20 FT) FROM THE PROTECTED HOOD EXHAUST SYSTEM(S)
 WITHIN A PATH OF EGRESS OR AT AN ALTERNATIVE LOCATION
 ACCEPTABLE TO THE AHJ.
 10) THE SHUTOFF VALVE FOR THE APPLIANCE SHALL BE
 LOCATED IN THE SAME ROOM AND WITHIN 6 FEET OF THE
 APPLIANCE. FBC-FUEL GAS SEC.409.5.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-08-19 Cont ID  
Sent By lmarchan Date 2020-08-19 Time 06:50 Rev Time 0.00
Received By lmarchan Date 2020-08-13 Time 08:18 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-07-27 Cont ID  
Sent By rmcdouga Date 2020-07-27 Time 11:17 Rev Time 0.00
Received By lmarchan Date 2020-07-08 Time 11:53 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2020-08-14 Cont ID  
Sent By hmoser Date 2020-08-14 Time 12:29 Rev Time 0.00
Received By hmoser Date 2020-08-14 Time 12:02 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2020-07-15 Cont ID  
Sent By medwards Date 2020-07-15 Time 16:57 Rev Time 0.00
Received By medwards Date 2020-07-15 Time 12:22 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2020-08-18 Cont ID  
Sent By abelisle Date 2020-08-18 Time 17:53 Rev Time 0.00
Received By abelisle Date 2020-08-17 Time 16:27 Sent To I
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-07-27 Cont ID  
Sent By tklarge Date 2020-07-27 Time 09:49 Rev Time 0.00
Received By tklarge Date 2020-07-20 Time 09:13 Sent To  
Notes
2020-07-23 13:28:531) SHEET AE-310 DEATIL #1 - THERE IS A NOTE THAT REFERS
 TO SHT. AE-330, DETAIL #9 FOR A ROOF DRAIN DETAIL.
 THERE IS NO SHEET AE- 330 IN THESE PLANS. CLARIFY.
 2) SHT.AE- 323 - SUBMIT A SECTION DETAIL OF THE
 EXFILTRATION TRENCH SHOWN AT THE BASE OF THE FOOTERS.
 WPB AMEND. TO FBC SEC. 107.2.1.
 3) SHT. P-11 - THE SANITARY DRAIN LINE FROM THE BAR
 AREA SHALL DISCHARGE TO THE GREASE INTERCEPTOR
 FBC-PLUMBING SEC.1003.3.1.
 4) SHT. M-8 - WORK NOTE #3 REFERS TO THE CONDENSATE
 DRAIN ROUTED TO NEAREST PLUMBING BOX. CONDENSATE IS NOT
 PERMITTED TO DISCHARGE INTO THE CITY'S SANITARY SYSTEM
 PER CITY ORDINANCE CHAPTER 90, ARTICLE III, SEC.90-126
 (B)(5).
 5) A BACKFLOW PREVENTION DEVICE IS REQUIRED ON THE
 FOLLOWING ITEMS: HOT FOOD WELL, STEAMER, FOOD DIGESTER,
 SODA AND WATER DISPENSER,COFFEE BREWER, ICED TEA
 BREWER, ICED TEA BREWER, COFFEE MAKER, & WATER FILTER.
 THE TYPE OF BACKFLOW DEVICE SHALL COMPLY WITH
 FBC-PLUMBING TABLE 608.1 FOR THE SPECIFIC APPLICATION.
 6) SUBMIT SPECIFICATIONS/DETAILS ON THE TYPE OF GREASE
 INTERCEPTOR TO BE INSTALLED. IF AN EXISTING INTERCEPTOR
 IS BEING USED, SUBMIT VERIFICATION THAT THE EXISTING
 UNIT HAS THE CAPACITY FOR THE ADDITIONAL LOAD.
 7) SHT. P-9 - GREASE INTERCEPTOR SIZING TABLE - IN THE
 ROW FOR 4 INCH PIPE, WHERE DID THE 150 GPM COME FROM?
 ALSO, WHERE DID THE COEFFICIENT OF 0.0455 COME FROM? I
 COULD NOT FIND EITHER OF THOSE ITEMS IN THE SIZING
 STANDARD PDI- G101.
 8) SHT. P-10 - WORK NOTE #1 REFERS TO SHT. P-7. THE IS
 NO SUCH SHEET IN THIS SUBMITTAL. CLARIFY.
 9) SHT. P-10 - SIZE THE MAIN BRANCH LINES ON THE WATER
 RISER. WPB AMEND. TO FBC SEC. 107.3.5.1.3.
 10) HOSE BIBBS SHALL BE EQUIPPED WITH SEPARATE SHUTOFF
 VALVES. FBC-PLUMBING SEC.606.2 (2).
 11) SHT. P-10 - SHOW THE SIZE OF EACH WATER LINE AT THE
 MANIFOLD. WPB AMEND. TO FBC SEC. 107.3.5.1.3.
 12) SHOW THE TANKLESS WATER HEATER ON THE WATER RISER
 AND ALSO ON THE PLAN VIEW.
 13) SUBMIT WATER AND SANITARY RISERS FOR THE NEW TOILET
 ROOMS AND OTHER PLUMBING ON THE LOWER AND UPPER LEVELS.
 WPB AMEND. TO FBC SEC. 107.2.1.
 14) IS THERE A SUMP PUMP BEING INSTALLED IN THE
 ELEVATOR PIT? IF SO, SUBMIT PIPING ISOMETRIC. SHOW
 COMPLIANCE WITH FBC-PLUMBING SECS.301.6, 1003.4.
 15) SHT.P-9 - THE VENTED CLEANOUT ADJACENT TO FIXTURE
 PK 6 DOES NOT COMPLY WITH THE PLUMBING CODE AND CREATES
 A FLAT, DRY VENT. EVERY DRY VENT CONNECTING TO A
 HORIZONTAL DRAIN SHALL CONNECT ABOVE THE CENTERLINE OF
 THE HORIZONTAL DRAIN PIPE. FBC-PLUMBIBNG SEC.905.3.
 16) SHT. P-9 - THE VENTED CLEANOUT FOR THE FLOOR SINKS
 FOR FIXTURES PK 42 & PK44 DOES NOT COMPLY WITH THE
 PLUMBING CODE AND CREATES A FLAT, DRY VENT. EVERY DRY
 VENT CONNECTING TO A HORIZONTAL DRAIN SHALL CONNECT
 ABOVE THE CENTERLINE OF THE HORIZONTAL DRAIN PIPE.
 FBC-PLUMBIBNG SEC.905.3. THIS ALSO OCCURS AT THE VENTED
 WALL CLEANOUT BY FIXTURE PK1.
 17) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 FOLLOWING EQUIPMENT: STEAMER, FOOD DIGESTOR, AND
 DISHMACHINE. WPB AMEND. TO FBC SEC. 107.2.1.
 18) THE SINK IN COPY ROOM E129 MAY BE REQUIRED TO
 COMPLY WITH THE FBC-ACCESSIBIRITY SECS.212.3, 606.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-08-15 Cont ID  
Sent By medwards Date 2020-08-15 Time 08:18 Rev Time 0.00
Received By medwards Date 2020-08-15 Time 08:06 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-07-15 Cont ID  
Sent By medwards Date 2020-07-15 Time 16:58 Rev Time 0.00
Received By medwards Date 2020-07-15 Time 16:58 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2020-07-10 Cont ID  
Sent By rthermid Date 2020-07-10 Time   Rev Time  
Received By rthermid Date 2020-07-10 Time   Sent To I
Notes
***NONE***