2020-08-26 12:32:32 | 08/26/20 1ST GAS REVIEW**DENIED** WITH COMMENTS |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| 1. ON THE BTU'S FOR THE GENERATOR YOU HAVE 308 AND ON |
| THE 2020 UPDATED VERSION IT CALLS OUT A LP FULL LOAD AT |
| 136 BTU'S, PLEASE CHANGE AND SUBMIT THE LATEST VERSION |
| FOR YOUR GENERATOR SPEC FOR 2020 VERSION PER THE WPB |
| AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION ON |
| CONSTRUCTION DOCUMENTS. |
| |
| 2. CLEARLY SHOW THE LOCATION OF LP TANK(S), TYPE OF |
| TANK (DOT OR ASME), THE DISTANCE OF THE TANK FROM THE |
| EXTERIOR BUILDING WALL AND ADJACENT PROPERTY LINES, THE |
| DISTANCE OF THE TANK FROM ALL SOURCES OF IGNITION, |
| OTHER CONTAINERS, BUILDINGS, AND THE LOCATION OF ANY |
| BUILDING OPENINGS BELOW THE RELIEF VALVE OF THE TANK |
| PER THE NFPA 58, TABLE 3-2.2.2. |
| |
| 3. PROVIDE THE UG TANK CLEARANCE DISTANCES MEASUREMENTS |
| TO THE HOUSE, DRIVEWAY, AND PROPERTY LINE- SEE TABLE |
| 6.4.1.1 AND SECTION 6.8.6.1 NFPA 58. PLEASE NOTE THAT |
| IF THE TANK IS LESS TANK 10 FT. FROM THE DRIVEWAY, THE |
| SHELL FOR THE TANK SHALL BE 18 IN. ABOVE GRADE, AND |
| VEHICULAR BARRIER PROTECTION WILL BE REQUIRED. |
| |
| 4. CLEARLY SHOW THE METHOD OF TIE DOWN FOR THE LP TANK |
| BELOW GROUND, IT SHALL BE ANCHORED PER NFPA 58 |
| SEC.3-2.2.7 (H). PLEASE PROVIDE A TIE DOWN FOR THE TANK |
| IF AN ENGINEERED ONE IS PROVIDED PLEASE PROVIDE WHO |
| PREPARED THE TANK TIE-DOWN DETAILS AND SHALL PROVIDE AN |
| ELECTRONIC SIGNATURE AND SEAL ON THE DOCUMENT- FL. |
| STATUTE 471.025 & FLORIDA ADMINISTRATIVE CODE SEC. |
| 61G15-23.005. PROVIDE THE SIZE OF THE HOLD-DOWN |
| CABLES/STRAPS FOR THE TANK AND THE TYPE AND LENGTH OF |
| GROUND ANCHORS TO BE INSTALLED TO PREVENT FLOTATION PER |
| THE NFPA 58 SEC. 6.6.1.6. |
| |
| 5. IF YOU ARE USING STRAPS OR CABLE, IF CABLE, HOW IS |
| IT PROTECTED FOR THE LP TANK AND APPURTENANCES PER NFPA |
| 58 AND WPB AMENDMENTS TO THE FBC SEC. 107.2.1 |
| INFORMATION ON CONSTRUCTION DOCUMENTS. |
| |
| 6. A CATHODIC PROTECTION SYSTEM SHALL BE REQUIRED PER |
| NFPA 58 SECS. 5.2.1.11, 6.6.6.1 (I) AND SHALL BE |
| MONITORED PER THE NFPA 58 SEC.6.6.6.1 (J). SUBMIT |
| DETAILS ON THE TYPE OF CATHODIC PROTECTION, SIZE (LBS.) |
| & A NUMBER OF MAGNESIUM BAG(S), SIZE & TYPE OF ANODE |
| CABLE AMOUNT OF WATER TO ACTIVATE IT. |
| |
| 7. SHOW THE DEPTH OF THE LP GAS CONTAINER BELOW GRADE |
| TO COMPLY WITH NFPA 58 SEC. 6.6.6.1. |
| |
| WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| COOPERATION. |
| |
| LUIS A. CRESPO |
| PLUMBING PLAN EXAMINER / INSPECTOR |
| EMAIL: [email protected] OFFICE: 561 805-6720 |
| |