Plan Review Stops For Permit 20070078 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2020-10-01 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-10-01 |
Time |
11:21 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-10-01 |
Time |
11:21 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2020-09-21 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-09-21 |
Time |
09:47 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-09-21 |
Time |
09:47 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2020-09-03 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-09-03 |
Time |
09:31 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-09-03 |
Time |
09:31 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2020-08-11 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-08-11 |
Time |
15:38 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-08-11 |
Time |
09:24 |
Sent To |
|
|
Notes |
2020-08-11 10:50:27 | NEW SFR | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected]. | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | AMENDMENTS | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | 1) CODE SECTION SHOWN ON THE STAIR SECTION DRAWINGS FOR | | THE STAIR HANDRAILS IS INCORRECT FBC R311.7.7 SHOULD BE | | FBC R311.7.8 | | 2) DOOR FROM GARAGE LABELED (120) CANNOT OPEN INTO THE | | BEDROOM PER FBC R302.5.1 | | 3) DOOR SCHEDULE SHOWS 2 TYPE (F) DOORS - PLEASE | | CLARIFY THE DOOR TYPE FROM GARAGE TO LIVING SPACE TO | | COMPLY WITH FBC R302.5.1 | | 4) PLEASE PROVIDE A COMPLETE (FRONT PAGES AND THE | | INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE | | PRODUCT APPROVAL FOR THE ROOFING SYSTEM TO BE INSTALLED | | - OR - PROVIDE A STATEMENT ON THE DRAWINGS AS TO THE | | REFERRAL OF THE ROOFING SYSTEM PER FBC WPB AMENDMENTS | | 107.3.4.1 DEFERRED SUBMITTAL. | | 5) THE PROVIDED STORM WATER CALCULATIONS NEED TO BE | | SIGNED AND DATED BY THE ENGINEER. | | 6) SHOW THE REQUIRED FLOOD VENTS IN THE GARAGES PER FBC | | R322.2.2 | | 7) DRAWINGS AND DOCUMENTS DO NOT SHOW IN "ADOBE READER" | | AS DIGITALLY/ELECTRONICALLY SIGNED. "ADOBE READER" | | STATES "AT LEAST ONE SIGNATURE HAS PROBLEMS". PLEASE | | CHECK TO SEE THAT THE ELECTRONIC SIGNATURES ARE CARRIED | | OVER PROPERLY. SIGNED AND SEALED DRAWINGS AND DOCUMENTS | | IN PROJECTDOX NEED TO BE DIGITALLY/ELECTRONICALLY | | SIGNED BY THE ENGINEER OR ARCHITECT TO BE USED IN | | ELECTRONIC PLAN REVIEW. | | | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2020-09-24 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-09-24 |
Time |
12:54 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-09-24 |
Time |
11:20 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2020-08-31 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2020-08-31 |
Time |
08:05 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2020-08-31 |
Time |
07:33 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2020-08-04 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-08-04 |
Time |
10:13 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-08-04 |
Time |
09:05 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E-LOWVOLT |
ELECTRICAL LOW VOLTAGE |
Rev No |
1 |
Status |
P |
Date |
2020-08-31 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2020-08-31 |
Time |
08:13 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2020-08-31 |
Time |
08:13 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
3 |
Status |
P |
Date |
2020-09-22 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2020-09-22 |
Time |
15:51 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2020-09-22 |
Time |
14:26 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
F |
Date |
2020-09-01 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2020-09-01 |
Time |
17:22 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2020-09-01 |
Time |
10:33 |
Sent To |
|
|
Notes |
2020-09-01 17:23:49 | 08/31/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS | | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS | | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE | | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. | | | | 1. A GAS/LP PERMIT IS REQUIRED BY A LICENSED CONTRACTOR | | FOR THE SCOPE OF WORK OR PUT A NOT ON PLANS PER THE WPB | | AMENDMENTS TO THE FBC SEC. 105.1. | | | | 2. PLEASE LABEL THE METER TO REFLECT 2 PSI SYSTEM AND | | ON THE GAS SYSTEM CHARTS REMOVE (DROP) NEXT TO | | PRESSURE, ADD PSI TO THE FIRST BOX AND FOURTH PER THE | | WPB AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON | | CONSTRUCTION DOCUMENTS. | | | | 3. SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, PE | | AND OR METAL ON ISOMETRIC PER THE WPB AMENDMENTS TO THE | | FBC SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. | | | | 4. SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE | | PRESSURE REGULATORS. REGULATORS INSTALLED ON THE | | EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR | | INSTALLATION PER THE 2017 FBC RES. SEC. G2421.1. | | | | 5. SUBMIT CALCULATIONS FOR COMBUSTION FOR RANGE AIR PER | | THE 2017 FBC FG SEC. 304.1, 614.5. | | | | 6. SUBMIT MANUFACTURER'S SPECIFICATION | | SHEETS/INSTALLATION MANUAL FOR ALL GAS EQUIPMENT | | (GENERATOR, RANGE, POOL HEATER, TANKLESS AND DUAL FUEL | | CHANGEOVER) TO VERIFY COMPLIANCE WITH 2017 FBC FG | | SEC.305.1. | | | | 7. GAS APPLIANCES SHALL BE LISTED AND LABELED. THE | | INSTALLATION MANUALS FOR ALL GAS APPLIANCES/EQUIPMENT | | SHALL BE ONSITE AT THE TIME OF INSPECTION PER THE 2017 | | FBC FG SECS. 402.2 AND 301.3. | | | | 8. PLEASE SHOW AND LABEL ALL UNIONS IN FRONT OF | | REGULATOR 1' OF EITHER SIDE PER THE 2017 FBC RES. SEC | | G2421.2. | | | | 9. PLEASE LABEL ALL SHUTOFF VALVE ON GAS ISOMERIC PER | | THE 2017 FBC RES. SEC. G2401.1.3. | | | | 10. PLEASE LABEL ALL DRIP LEG ON EQUIPMENT INSTALLED ON | | ISOMETRIC PER THE 2017 FBC RES. SEC. G2419.2. | | | | 11. FOR THE DEVELOPED LENGTH ON PIPES I HAVE 363' AND | | YOU HAVE 398' PLEASE RECALCULATE AND CHANGE PER THE WPB | | AMENDMENTS TO THE FBC SEC. 107.2.1. INFORMATION ON | | CONSTRUCTION DOCUMENTS. | | | | 12. PLEASE LABEL GAS CHARTS AND LP CHARTS DIFFERENTLY | | AS THEY ARE TWO SEPARATE SYSTEMS PER THE WPB AMENDMENTS | | TO THE FBC SEC. 107.2.1. INFORMATION ON CONSTRUCTION | | DOCUMENTS. | | | | 13. I AM COMING UP WITH 2,957 BTU'S ON GAS SYSTEM AS | | YOU CAME UP WITH 2,449 BTU'S AND LP HAS 1,305 BTU'S, | | THE GENERATOR MUST BE AT FULL LOAD PLEASE CLARIFY PER | | THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1. INFORMATION | | ON CONSTRUCTION DOCUMENTS. | | | | 14. PROVIDE ON A HOUSE THE LOCATION OF THE TANKLESS | | WATER HEATER THE LOCATION AND DISTANCE OF ANY OPERABLE | | DOORS OR WINDOWS IN RELATION TO THE WATER HEATER. THE | | LOCATION OF THE WATER HEATER SHALL COMPLY WITH THE | | MANUFACTURER'S INSTALLATION INSTRUCTIONS PER THE WPB | | AMENDMENTS TO THE FBC SEC. 107.2.1. INFORMATION ON | | CONSTRUCTION DOCUMENTS. | | | | 15. CLEARLY SHOW THE LOCATION AND CAPACITY OF LP | | TANK(S), TYPE OF TANK (DOT OR ASME), THE DISTANCE OF | | THE TANK FROM THE EXTERIOR BUILDING WALL AND ADJACENT | | PROPERTY LINES, THE DISTANCE OF THE TANK FROM ALL | | SOURCES OF IGNITION, OTHER CONTAINERS, BUILDINGS, AND | | THE LOCATION OF ANY BUILDING OPENINGS BELOW THE RELIEF | | VALVE OF THE TANK PER THE NFPA 58, TABLE 3-2.2.2. | | | | 16. SHOW THE DEPTH OF THE LP GAS CONTAINER BELOW GRADE | | TO COMPLY WITH NFPA 58 SEC. 6.6.6.1. | | | | 17. PROVIDE THE SIZE OF THE HOLD-DOWN CABLES/STRAPS FOR | | THE TANK AND THE TYPE AND LENGTH OF GROUND ANCHORS TO | | BE INSTALLED TO PREVENT FLOTATION PER THE NFPA 58 SEC. | | 6.6.1.6. | | | | 18. ON THE LP TANK TIE-DOWN ARE YOU USING STRAPS OR | | CABLE, IF CABLE, HOW IS IT PROTECTED FOR THE LP TANK | | AND APPURTENANCES PER NFPA 58 AND PER THE WPB | | AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON | | CONSTRUCTION DOCUMENTS. | | | | 10. A CATHODIC PROTECTION SYSTEM SHALL BE REQUIRED PER | | NFPA 58 SECS. 5.2.1.11, 6.6.6.1 (I) AND SHALL BE | | MONITORED PER THE NFPA 58 SEC.6.6.6.1 (J). SUBMIT | | DETAILS ON THE TYPE OF CATHODIC PROTECTION, SIZE (LBS.) | | & A NUMBER OF MAGNESIUM BAG(S), SIZE & TYPE OF ANODE | | CABLE AMOUNT OF WATER TO ACTIVATE IT WITH THE PROCIDURE | | TO DO SO. | | | | 20. THE SUBMITTED SHEET FOR THE LOCATION OF THE | | UNDERGROUND LP TANK INSTALLATION IS FOR ILLUSTRATIVE | | PURPOSES ONLY. THE LOCATION OF THE UNDERGROUND LP TANK | | SHALL COMPLY WITH TABLE 6.3.1 OF NFPA 58-11. SHOW THE | | DISTANCE OF THE LP TANK FROM THE EXTERIOR WALL OF THE | | STRUCTURE. | | | | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & | | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS | | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL | | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE | | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION | | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO | | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED | | COOPERATION. | | | | LUIS A. CRESPO | | PLUMBING PLAN EXAMINER / INSPECTOR | | EMAIL: [email protected] OFFICE: 561 805-6720 | | |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
N |
Date |
2020-07-29 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-07-29 |
Time |
17:21 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-07-29 |
Time |
16:12 |
Sent To |
|
|
Notes |
2020-07-29 17:27:18 | SEPARATE PERMITS ARE REQUIRED FOR THE NATURAL GAS | | PIPING INSTALLATIONS, AND THE UNDERGROUND LP TANK | | INSTALLATION. COMPLETE PLANS AND SPECIFICATIONS ARE | | REQUIRED INCLUDING A RISER DRAWING, FLAT LINE DRAWING, | | EQUIPMENT SCHEDULES, COMBUSTION AIR CALCULATIONS, AND | | PRODUCT SUBMITTALS FOR GAS-FIRED APPLIANCES AND | | REGULATORS. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2020-10-01 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-10-01 |
Time |
11:25 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-10-01 |
Time |
09:35 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2020-10-01 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2020-10-01 |
Time |
07:57 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2020-09-16 |
Time |
06:59 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2020-09-11 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2020-09-11 |
Time |
15:44 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2020-08-28 |
Time |
16:11 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2020-08-14 |
|
|
Cont ID |
|
Sent By |
ccarvaja |
Date |
2020-08-14 |
Time |
19:12 |
Rev Time |
0.00 |
Received By |
ccarvaja |
Date |
2020-07-10 |
Time |
16:16 |
Sent To |
|
|
Notes |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
2 |
Status |
P |
Date |
2020-10-01 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2020-10-01 |
Time |
07:57 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2020-09-24 |
Time |
15:57 |
Sent To |
|
|
Notes |
2020-10-01 07:57:43 | RECEIPT MU-2020-037885-0000 - $0.00 DUE | 2020-09-24 15:58:01 | 9/24/20 EMAILED IMPACT OFFICE FOR REVIEW. LEM |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
1 |
Status |
F |
Date |
2020-08-11 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-08-11 |
Time |
15:53 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-08-11 |
Time |
15:53 |
Sent To |
|
|
Notes |
2020-08-11 15:54:15 | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS | | OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM | | CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS | | TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF | | | | UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE | | RECEIPT TO YOUR PROJECT OR EMAIL IT TO | | [email protected] . | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
P |
Date |
2020-09-21 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2020-09-21 |
Time |
08:41 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2020-09-21 |
Time |
08:18 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2020-09-01 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2020-09-01 |
Time |
15:16 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2020-09-01 |
Time |
14:26 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
P |
Date |
2020-07-24 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2020-07-24 |
Time |
11:13 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2020-07-24 |
Time |
08:30 |
Sent To |
|
|
Notes |
|
|
Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
Rev No |
4 |
Status |
P |
Date |
2020-10-01 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-10-01 |
Time |
11:24 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-10-01 |
Time |
11:22 |
Sent To |
|
|
Notes |
2020-10-01 11:24:45 | DRAWINGS SHOW THE LOWEST FINISHED FLOOR ELEVATION AT | | 9.00 NAVD | | GARAGE FLOOR AT 8.33 NAVD (FLOOD VENTS PROVIDED) | | | | SFHA AE 6 AND AE 7. CT (AS SHOWN ON MYGEONAV) |
|
|
Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
Rev No |
3 |
Status |
F |
Date |
2020-09-21 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-09-21 |
Time |
09:50 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-09-21 |
Time |
09:50 |
Sent To |
|
|
Notes |
2020-09-21 09:51:18 | A SIGNED AND SEALED ELEVATION CERTIFICATE IS REQUIRED | | TO BE FILLED OUT (MARKED "CONSTRUCTION DRAWINGS"). | | | | DRAWINGS SHOW THE LOWEST FINISHED FLOOR ELEVATION AT | | 9.00 NAVD | | GARAGE FLOOR AT 8.33 NAVD | | | | SFHA AE 6 AND AE 7. CT (AS SHOWN ON MYGEONAV) |
|
|
Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
Rev No |
2 |
Status |
F |
Date |
2020-09-03 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-09-03 |
Time |
09:38 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-09-03 |
Time |
09:38 |
Sent To |
|
|
Notes |
2020-09-03 09:39:45 | A SIGNED AND SEALED ELEVATION CERTIFICATE IS REQUIRED | | TO BE FILLED OUT (MARKED "CONSTRUCTION DRAWINGS"). | | DRAWINGS SHOW THE LOWEST FINISHED FLOOR ELEVATION AT | | 9.00 NAVD | | GARAGE FLOOR AT 8.33 NAVD ( PLEASE SHOW THE REQUIRED | | FLOOD VENTS PER FBC R322.2.2) | | | | SFHA AE 6 AND AE 7. CT (AS SHOWN ON MYGEONAV) |
|
|
Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
Rev No |
1 |
Status |
F |
Date |
2020-08-13 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-08-11 |
Time |
15:38 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-08-11 |
Time |
15:38 |
Sent To |
|
|
Notes |
2020-08-11 15:43:45 | DRAWINGS SHOW THE LOWEST FINISHED FLOOR ELEVATION AT | | 9.00 NAVD | | GARAGE FLOOR AT 8.33 NAVD ( PLEASE SHOW THE REQUIRED | | FLOOD VENTS PER FBC R322.2.2) | 2020-07-24 16:25:56 | SFHA AE 6 AND AE 7. CT |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2020-09-22 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2020-09-22 |
Time |
15:51 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2020-09-18 |
Time |
07:06 |
Sent To |
|
|
Notes |
2020-09-22 15:52:06 | 09/22/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING) | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM | | THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND | | NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF | | PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY | | ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | AVOID VOIDING OF THE PERMIT. | | | | LUIS A. CRESPO | | PLUMBING PLAN EXAMINER / INSPECTOR | | EMAIL: [email protected] OFFICE: 561 805-6720 | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2020-09-01 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2020-09-01 |
Time |
17:22 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2020-08-31 |
Time |
17:14 |
Sent To |
|
|
Notes |
2020-09-01 15:54:58 | 09/01/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING) | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM | | THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND | | NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF | | PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY | | ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | AVOID VOIDING OF THE PERMIT. | | | | LUIS A. CRESPO | | PLUMBING PLAN EXAMINER / INSPECTOR | | EMAIL: [email protected] OFFICE: 561 805-6720 | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2020-07-30 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-07-30 |
Time |
18:09 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-07-29 |
Time |
14:07 |
Sent To |
|
|
Notes |
2020-07-30 18:09:48 | 1ST REVIEW FBC-2017 RES. PLUMBING | | PERMIT- 20070078 | | 7/29/2020 | | | | CODES IN EFFECT: | | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH | | EDITION 2017 | | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | 2017 | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | EDITION 2017 | | | | PLAN REVIEW RESULTS: DENIED. | | | | 1) PROVIDE SANITARY ISOMETRIC AND WATER RISER DRAWINGS- | | SECTIONS 107.3.5.3 AND 107.2.1 WPB. PLEASE NOTE THE | | WATER RISER SHALL SHOW PIPE SIZES, AND THE LOCATIONS OF | | ALL SHUTOFF VALVES AND DEVICES SUCH AS WATER HAMMER | | ARRESTORS AND BACKFLOW PREVENTERS WHERE REQUIRED- REFER | | TO SECTIONS P2902.3 AND P2903.5 FBC RES. THE SANITARY | | RISER SHALL SHOW DWV PIPE SIZES AND LOCATIONS OF | | REQUIRED CLEANOUTS. | | | | 2) SEPARATE PERMITS ARE REQUIRED FOR THE WATER SERVICE | | BACKFLOW PREVENTER, NATURAL GAS PIPING INSTALLATIONS, | | THE BACKUP UNDERGROUND LP GAS TANK, AND THE IRRIGATION | | SYSTEM. PLEASE PLACE NOTES ON THE PLAN TO CLARIFY THE | | SCOPE OF WORK UNDER THIS PERMIT- SECTION 107.2.1 WPB. | | | | 3) SHEET C-101: PLEASE NOTE UPON COMPLETION OF THE NEW | | STORM DRAINAGE SYSTEMS AS SHOWN ON THE PLAN A | | CERTIFICATION FROM A LICENSED PROFESSIONAL SHALL BE | | SUBMITTED TO THE INSPECTOR IN ORDER TO RECEIVE FINAL | | APPROVAL- SECTION 110.9 IMPACT OF CONSTRUCTION WPB. IN | | ACCORDANCE WITH NOTE 1 ON SHEET C-100, A COMPLETE SET | | OF SIGNED AND SEALED AS-BUILT DRAWINGS SHALL BE | | SUBMITTED BY THE FL. LICENSED SURVEYOR. | | | | 4) THE ROOF DRAINAGE SYSTEMS SHALL BE IN COMPLIANCE | | WITH SECTIONS R903.4.1 FBC RES AND 1101.2 FBC P: | | A) VERIFY THE ROOF IS DESIGNED FOR THE MAXIMUM POSSIBLE | | DEPTH OF WATER THAT WILL POND THEREON AS DETERMINED BY | | THE RELATIVE LEVELS OF ROOF DECK AND OVERFLOW WEIRS, | | SCUPPERS, EDGES OR SERVICEABLE DRAINS IN COMBINATION | | WITH THE DEFLECTED STRUCTURAL ELEMENTS. IN DETERMINING | | THE MAXIMUM POSSIBLE DEPTH OF WATER, ALL PRIMARY ROOF | | DRAINAGE MEANS SHALL BE ASSUMED TO BE BLOCKED- SECTION | | 1101.7. | | B) PROVIDE THE ROOF DRAIN FLOW RATE BASED ON SECTION | | 1105.2, AND CALCULATIONS FOR SIZING THE PRIMARY AND | | EMERGENCY VERTICAL CONDUCTORS AND LEADERS AND | | HORIZONTAL BRANCHES BASED ON SECTIONS 1106.1, FIGURE | | 1106.1 AND SECTION 1108.3. PROVIDE A STORM DRAIN PIPE | | SIZING SCHEDULE BASED ON TABLE 1106.2, AND VERTICAL | | LEADER AND HORIZONTAL GUTTER SCHEDULES BASED ON TABLES | | 1106.3 AND 1106.6. | | C) PROVIDE A ROOF DRAIN SCHEDULE ON THE PLAN SHOWING | | THE MAKES AND MODELS OF THE PRIMARY AND EMERGENCY ROOF | | DRAINS, AND SUBMIT PRODUCT SPECIFICATION SHEETS- | | SECTIONS 1102.6 AND 1108.1. | | D) SHOW THE REQUIRED CLEANOUT LOCATIONS ON THE PLUMBING | | PLANS FOR THE SYSTEM. PLEASE NOTE THAT CLEANOUTS ARE | | REQUIRED WHERE THE VERTICAL CONDUCTORS CONNECT WITH THE | | HORIZONTAL BRANCHES, AND ACCESS TO THOSE CLEANOUTS | | SHALL BE PROVIDED- SEE SECTIONS 1101.8, 708.1.4, | | 708.1.10 FBC P AND P3005.2.4, AND P3005.2.10 FBC RES. | | E) PROVIDE A RISER DRAWING FOR THE ROOF DRAINAGE | | SYSTEM- SECTION 107.3.5.3 FBC RES. | | F) PROVIDE A ROOF DRAINAGE TESTING PROCEDURE ON THE | | PLANS PER SECTION 1101.4 FBC P. | | | | 5) SHEET P-100: AS NOTED IN COMMENT #2 THE UG LP TANK | | SHALL BE UNDER SEPARATE PERMIT. PLEASE NOTE THAT THE | | TANK SHALL BE ANCHORED AGAINST FLOTATION- SECTION | | 6.8.1.6 NFPA 58. AND VEHICULAR BARRIER PROTECTION SHALL | | BE PROVIDED FOR CONTAINER'S FITTING HOUSING, HOUSING | | COVER, CONTAINER CONNECTIONS, AND PIPING- SECTION | | 6.8.6.1- NFPA 58. | | | | 6) P-100: THE 1-1/2 WATER SERVICE LINE BY THE SOUTH | | GARAGE IS MISLABELED AS A 4" SANITARY. PLEASE CORRECT | | AND SHOW THE CORRECT LOCATION OF THE 4" SANITARY- | | SECTION 107.2.1 WPB. | | | | 7) P-101: CLEANOUT REQUIRED AT 3" SD | | VERTICAL/HORIZONTAL TRANSITION- 1101.8, 708.1.4, | | 708.1.10 FBC P AND P3005.2.4, AND P3005.2.10 FBC RES. | | | | 8) P-101: PLEASE PROVIDE A DETAIL FOR THE CERD SHOWN AT | | THE ESD TERMINATION LOCATIONS- SECTION 107.2.1 WPB. | | | | 9) P-101: REQUIRED VENT NOT SHOWN AT P-2A- SECTION | | P3101.2.1 FBC RES. | | | | 10) P-102: CLEANOUTS REQUIRED AT 3" SD VERT/HOR. | | TRANSITIONS ON EXTERIOR WALLS, AND SD, ESD AND | | CONDENSATE LINE VERT/HOR. TRANSITIONS SHOWN AT INTERIOR | | WALLS- SECTIONS 1101.8, 708.1.4, 708.1.10 FBC P AND | | P3005.2.4, AND P3005.2.10 FBC RES. | | | | 11) P-103: CLEANOUTS REQUIRED AT 3" SD | | VERTICAL/HORIZONTAL TRANSITION- 1101.8, 708.1.4, | | 708.1.10 FBC P AND P3005.2.4, AND P3005.2.10 FBC RES. | | | | 12) P-104: PLEASE CONFIRM WATER CANNOT BECOME ENTRAPPED | | IN THE OPEN AREA BY THE SECOND FLOOR GYM IF THE SLOT | | DRAIN WAS TO BE BLOCKED. OTHERWISE PROVIDE AN EMERGENCY | | ROOF DRAIN- SECTION 1108.1 FBC P. | | | | 13) P-105: INDICATE HOW ACCESS WILL BE PROVIDED TO THE | | WATER BALANCING VALVES- SECTION P2903.9.3. | | | | 14) P-106 & P-107: INDICATE HOW THE UNDERGROUND WATER | | PIPING WILL BE PROTECTED FROM CORROSION- SECTIONS | | P2903.2.1 & P2903.3. | | | | 15) P-200: PLEASE ADD THE HOSE BIBS TO THE PLUMBING | | FIXTURE CONNECTION SCHEDULE- P2903.10 FBC RES. A) | | PLEASE CORRECT NOTE 2 UNDER THE SCHEDULE REFERENCING A | | MIAMI-DADE COUNTY ORDINANCE- SECTION 107.2.1 WPB. | | | | 16) P-200: PROVIDE EQUIPMENT SCHEDULES ON THE PLANS FOR | | THE GAS AND ELECTRIC WATER HEATERS AND SUBMIT | | MANUFACTURER'S SPECIFICATIONS- SECTIONS P2801.3 AND | | M2005.1 FBC RES. CORRECT THE ENERGY COMPLIANCE REPORT | | R405-2017 INDICATES ONE GAS-FIRED HEATER, THREE ARE | | SHOWN ON THE SHEET P-105. | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | | | CHRISTOPHER L. COLE | | MECHANICAL/PLUMBING PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | | | |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
3 |
Status |
N |
Date |
2020-09-21 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-09-21 |
Time |
09:48 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-09-21 |
Time |
09:48 |
Sent To |
|
|
Notes |
2020-09-21 09:49:22 | DEFERRED |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
2 |
Status |
F |
Date |
2020-09-03 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-09-03 |
Time |
09:37 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-09-03 |
Time |
09:32 |
Sent To |
|
|
Notes |
2020-09-03 09:36:57 | NEW SFR | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected]. | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | AMENDMENTS | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | 1) THE ROOFING PRODUCT APPROVAL HAS MULTIPLE "SYSTEM | | TYPES" WITH DIFFERENT WIND DESIGN PRESSURES FOR EACH - | | PLEASE CIRCLE THE ROOFING SYSTEM TYPE TO BE USED IN THE | | PRODUCT APPROVAL - IF NEEDED PLEASE PROVIDE SIGNED AND | | SEALED ADDITIONAL ATTACHMENT DETAILS FROM AN ARCHITECT | | OR ENGINEER FOR THE ROOF ZONES 2 AND 3 WHICH MAY | | REQUIRE A HIGHER WIND PRESSURE - SEE NOTES ON THE | | PRODUCT APPROVAL. | | | | |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
1 |
Status |
F |
Date |
2020-08-11 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-08-11 |
Time |
15:53 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-08-11 |
Time |
15:53 |
Sent To |
|
|
Notes |
2020-08-11 15:53:32 | SEE BUILDING PLAN REVIEW |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
4 |
Status |
P |
Date |
2020-09-21 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2020-09-21 |
Time |
09:02 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2020-09-21 |
Time |
09:02 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
P |
Date |
2020-09-03 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2020-09-03 |
Time |
10:53 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2020-09-03 |
Time |
10:52 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2020-09-01 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2020-09-01 |
Time |
16:02 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2020-09-01 |
Time |
16:02 |
Sent To |
|
|
Notes |
2020-09-01 16:04:42 | DIGITAL SIGNATURE FOR STRUCTURAL SHEETS DOES NOT OPEN. | | | | MICHAEL EDWARDS | | MECHANICAL EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL. 33401 | | 561-805-6728 | | [email protected] | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2020-07-24 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2020-07-24 |
Time |
13:07 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2020-07-24 |
Time |
11:13 |
Sent To |
|
|
Notes |
2020-07-24 13:12:46 | DESIGNER MUST PROVIDE DIGITALLY SIGNED AND SEAL | | DRAWINGS FOR CIVIL AND STRUCTURAL SHEETS. FBC FS 471 | | | | MICHAEL EDWARDS | | MECHANICAL EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL. 33401 | | 561-805-6728 | | [email protected] | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
P |
Date |
2020-09-25 |
|
|
Cont ID |
|
Sent By |
awooten |
Date |
2020-09-25 |
Time |
|
Rev Time |
0.00 |
Received By |
awooten |
Date |
2020-09-25 |
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2020-09-10 |
|
|
Cont ID |
|
Sent By |
awooten |
Date |
2020-09-10 |
Time |
|
Rev Time |
0.00 |
Received By |
awooten |
Date |
2020-09-10 |
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2020-08-13 |
|
|
Cont ID |
|
Sent By |
awooten |
Date |
2020-08-13 |
Time |
|
Rev Time |
|
Received By |
awooten |
Date |
2020-08-13 |
Time |
|
Sent To |
|
|
Notes |
2020-08-13 15:29:44 | ***************************ZONING REVIEW | | FAILED******************** | | | | HAVE PARCEL 1 AND 2 BEEN UNIFIED WITH A UNITY OF TITLE | | WITH THE CITY. | | | | SUBMIT A SEPARATE LANDSCAPE AND IRRIGATION PLAN. | | | | PROVIDE EASEMENT RELEASE FORMS FOR THE CONCRETE PADS ON | | THE NORTHERN AND SOUTHERN PERIMETERS OF PROPERTY INSIDE | | OF THE DRAINAGE EASEMENT AND SETBACK INFORMATION FOR | | CONCRETE PAD. | | | | DIMENSION ALL OVERHANGS. THEY CANNOT EXCEED 3 FEET. | | | | SEPARATE PERMITS ARE REQUIRED FOR A/C, FENCE, ACCESSORY | | BUIDLINGS FIRE SPRINKLER SYSTEMS, PAVING, DRAINAGE, | | POOLS, POOL EQUIPMENT, SIDEWALKS, APPROACHES AND | | DRIVEWAYS. | | | | ADDITIONAL COMMENTS MAY FOLLOW FURTHER REVIEW. | | | | | | ALANA WOOTEN | | PLANNER | | PLANNING DIVISION | | 561-822-1449 | | [email protected] | | |
|
|