Plan Review Details - Permit 20070049
Plan Review Stops For Permit 20070049
Review Stop B BUILDING (STRUCTURAL)
Rev No 6 Status P Date 2020-08-27 Cont ID  
Sent By rmcphers Date 2020-08-27 Time 13:21 Rev Time 0.00
Received By rmcphers Date 2020-08-27 Time 13:21 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status F Date 2020-08-19 Cont ID  
Sent By rmcphers Date 2020-08-19 Time 14:33 Rev Time 0.00
Received By rmcphers Date 2020-08-19 Time 14:33 Sent To  
Notes
2020-08-19 14:34:41WINDOWS
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected].
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 5TH REVIEW - PLEASE READ THE CORRECTION COMMENTS
 CAREFULLY
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) THE ENGINEERING SUPPLIED SHOWING THE WIND DESIGN
 PRESSURES FROM "ENGINEERING EXPRESS" SHOWS THE REQUIRED
 POSITIVE PRESSURES AT (+58.9) THE PRODUCT APPROVALS FOR
 THE SNGLE HUNG AND THE FIXED GLASS SHOW A MAXIMUM
 PRESSURE OF (+55) - PLEASE PROVIDE PRODUCT APPROVALS
 THAT MEET OR EXCEED THE REQUIRED WIND DESIGN PRESSURES
 SHOWN ON THE "ENGINEERING EXPRESS" DOCUMENT PROVIDED.
 2) THE SIGNED AND SEALED ENGINEERING FROM "ENGINEERING
 EXPRESS" =
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW.
 DRAWINGS DO NOT SHOW IN "ADOBE READER" AS
 DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR
 ENGINEER DOES NOT HAVE AN ELECTRONIC OR DIGITAL
 SIGNATURE - PLEASE DROP OFF (CITY HALL DROP BOX) THE
 ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS ALONG
 WITH A "PLAN REVIEW REQUEST FORM" EXPLAINING THE REASON
 FOR SUBMITTING THE DOCUMENT OR DRAWINGS. PLAN REVIEW
 REQUEST FORM CAN BE OBTAINED BY E MAILING [email protected]
 AND ASKING FOR THE FORM.

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date 2020-08-03 Cont ID  
Sent By rmcphers Date 2020-08-03 Time 14:09 Rev Time 0.00
Received By rmcphers Date 2020-08-03 Time 14:09 Sent To  
Notes
2020-08-03 14:13:27WINDOWS
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected].
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 4TH REVIEW - PLEASE READ THE CORRECTION COMMENTS
 CAREFULLY
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) THE ENGINEERING SUPPLIED SHOWING THE WIND DESIGN
 PRESSURES FROM "ENGINEERING EXPRESS" SHOWS THE REQUIRED
 POSITIVE PRESSURES AT (+58.9) THE PRODUCT APPROVALS FOR
 THE SNGLE HUNG AND THE FIXED GLASS SHOW A MAXIMUM
 PRESSURE OF (+55) - PLEASE PROVIDE PRODUCT APPROVALS
 THAT MEET OR EXCEED THE REQUIRED WIND DESIGN PRESSURES
 SHOWN ON THE "ENGINEERING EXPRESS" DOCUMENT PROVIDED.
 2) THE SIGNED AND SEALED ENGINEERING FROM "ENGINEERING
 EXPRESS" =
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW.
 DRAWINGS DO NOT SHOW IN "ADOBE READER" AS
 DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR
 ENGINEER DOES NOT HAVE AN ELECTRONIC OR DIGITAL
 SIGNATURE - PLEASE DROP OFF (CITY HALL DROP BOX) THE
 ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS ALONG
 WITH A "PLAN REVIEW REQUEST FORM" EXPLAINING THE REASON
 FOR SUBMITTING THE DOCUMENT OR DRAWINGS. PLAN REVIEW
 REQUEST FORM CAN BE OBTAINED BY E MAILING [email protected]
 AND ASKING FOR THE FORM.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2020-07-24 Cont ID  
Sent By rmcphers Date 2020-07-24 Time 11:29 Rev Time 0.00
Received By rmcphers Date 2020-07-24 Time 11:28 Sent To  
Notes
2020-07-24 11:29:10WINDOWS
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected].
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) THE ENGINEERING SUPPLIED SHOWING THE WIND DESIGN
 PRESSURES FROM "ENGINEERING EXPRESS" SHOWS THE REQUIRED
 POSITIVE PRESSURES AT (+58.9) THE PRODUCT APPROVALS FOR
 THE SNGLE HUNG AND THE FIXED GLASS SHOW A MAXIMUM
 PRESSURE OF (+55) - PLEASE PROVIDE PRODUCT APPROVALS
 THAT MEET OR EXCEED THE REQUIRED WIND DESIGN PRESSURES.
 2) THE SIGNED AND SEALED ENGINEERING FROM "ENGINEERING
 EXPRESS" =
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW.
 DRAWINGS DO NOT SHOW IN "ADOBE READER" AS
 DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR
 ENGINEER DOES NOT HAVE AN ELECTRONIC OR DIGITAL
 SIGNATURE - PLEASE DROP OFF (CITY HALL DROP BOX) THE
 ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS ALONG
 WITH A "PLAN REVIEW REQUEST FORM" EXPLAINING THE REASON
 FOR SUBMITTING THE DOCUMENT OR DRAWINGS. PLAN REVIEW
 REQUEST FORM CAN BE OBTAINED BY E MAILING [email protected]
 AND ASKING FOR THE FORM. (AT THIS TIME DROP BOX ITEMS
 MAY TAKE 2 TO 3 WEEKS TO PROCESS, TO SEND TO PLAN
 REVIEW - DUE TO LIMITED STAFF INSIDE THE BUILDING
 DEPT.)

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2020-07-15 Cont ID  
Sent By rmcphers Date 2020-07-15 Time 14:44 Rev Time 0.00
Received By rmcphers Date 2020-07-15 Time 14:44 Sent To  
Notes
2020-07-15 14:51:11WINDOWS
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected].
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) THE ENGINEERING SUPPLIED SHOWING THE WIND DESIGN
 PRESSURES FROM "ENGINEERING EXPRESS" SHOWS THE REQUIRED
 POSITIVE PRESSURES AT (+58.9) THE PRODUCT APPROVALS FOR
 THE SNGLE HUNG AND THE FIXED GLASS SHOW A MAXIMUM
 PRESSURE OF (+55) - PLEASE PROVIDE PRODUCT APPROVALS
 THAT MEET OR EXCEED THE REQUIRED WIND DESIGN PRESSURES.
 2) THE SIGNED AND SEALED ENGINEERING FROM "ENGINEERING
 EXPRESS" =
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW.
 DRAWINGS DO NOT SHOW IN "ADOBE READER" AS
 DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR
 ENGINEER DOES NOT HAVE AN ELECTRONIC OR DIGITAL
 SIGNATURE - PLEASE DROP OFF (CITY HALL DROP BOX) THE
 ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS ALONG
 WITH A "PLAN REVIEW REQUEST FORM" EXPLAINING THE REASON
 FOR SUBMITTING THE DOCUMENT OR DRAWINGS. PLAN REVIEW
 REQUEST FORM CAN BE OBTAINED BY E MAILING [email protected]
 AND ASKING FOR THE FORM. (AT THIS TIME DROP BOX ITEMS
 MAY TAKE 2 TO 3 WEEKS TO PROCESS, TO SEND TO PLAN
 REVIEW - DUE TO LIMITED STAFF INSIDE THE BUILDING
 DEPT.)
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-07-06 Cont ID  
Sent By rmcphers Date 2020-07-06 Time 14:25 Rev Time 0.00
Received By rmcphers Date 2020-07-06 Time 14:25 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2020-08-27 Cont ID  
Sent By rmcphers Date 2020-08-27 Time 13:22 Rev Time 0.00
Received By rmcphers Date 2020-08-25 Time 14:15 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2020-08-19 Cont ID  
Sent By rmcphers Date 2020-08-19 Time 14:35 Rev Time 0.00
Received By rmcphers Date 2020-08-04 Time 11:18 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2020-08-03 Cont ID  
Sent By rmcphers Date 2020-08-03 Time 14:14 Rev Time 0.00
Received By rmcphers Date 2020-07-24 Time 14:36 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2020-07-24 Cont ID  
Sent By rmcphers Date 2020-07-24 Time 11:30 Rev Time 0.00
Received By rmcphers Date 2020-07-16 Time 11:02 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-07-15 Cont ID  
Sent By rmcphers Date 2020-07-15 Time 14:52 Rev Time 0.00
Received By rmcphers Date 2020-07-08 Time 11:56 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-07-06 Cont ID  
Sent By rmcphers Date 2020-07-06 Time 14:26 Rev Time 0.00
Received By rmcphers Date 2020-07-02 Time 10:54 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 6 Status P Date 2020-08-27 Cont ID  
Sent By rmcphers Date 2020-08-27 Time 13:21 Rev Time 0.00
Received By rmcphers Date 2020-08-27 Time 13:21 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 5 Status F Date 2020-08-19 Cont ID  
Sent By rmcphers Date 2020-08-19 Time 14:34 Rev Time 0.00
Received By rmcphers Date 2020-08-19 Time 14:34 Sent To  
Notes
2020-08-19 14:35:12SEE BUILDING PLAN REVIEW

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 4 Status F Date 2020-08-03 Cont ID  
Sent By rmcphers Date 2020-08-03 Time 14:13 Rev Time 0.00
Received By rmcphers Date 2020-08-03 Time 14:13 Sent To  
Notes
2020-08-03 14:14:11SEE BUILDING PLAN REVIEW

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status F Date 2020-07-24 Cont ID  
Sent By rmcphers Date 2020-07-24 Time 11:30 Rev Time 0.00
Received By rmcphers Date 2020-07-24 Time 11:29 Sent To  
Notes
2020-07-24 11:30:41SEE BUILDING PLAN REVIEW

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2020-07-15 Cont ID  
Sent By rmcphers Date 2020-07-15 Time 14:51 Rev Time 0.00
Received By rmcphers Date 2020-07-15 Time 14:51 Sent To  
Notes
2020-07-15 14:51:46SEE BUILDING PLAN REVIEW

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-07-06 Cont ID  
Sent By rmcphers Date 2020-07-06 Time 14:25 Rev Time 0.00
Received By rmcphers Date 2020-07-06 Time 14:25 Sent To  
Notes
2020-07-06 14:26:24WIND DESIGN PRESSURES PROVIDED = DRAWINGS/DOCUMENTS
 NEED TO BE DIGITALLY/ELECTRONICALLY SIGNED BY THE
 ENGINEER OR ARCHITECT TO BE USED IN ELECTRONIC PLAN
 REVIEW. DRAWINGS/DOCUMENTS DO NOT SHOW IN "ADOBE
 READER" AS DIGITALLY/ELECTRONICALLY SIGNED. WHEN
 PRINTED OUT THE DIGITAL/ELECTRONIC SIGNATURE IS LOST -
 THEY MUST TRAVEL FROM COMPUTER TO COMPUTER
 (PROJECTDOX).


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved