Plan Review Details - Permit 20061224
Plan Review Stops For Permit 20061224
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-08-14 Cont ID  
Sent By rmcphers Date 2020-08-14 Time 14:43 Rev Time 0.00
Received By rmcphers Date 2020-08-14 Time 14:42 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-07-14 Cont ID  
Sent By rmcphers Date 2020-07-14 Time 12:20 Rev Time 0.00
Received By rmcphers Date 2020-07-14 Time 12:11 Sent To  
Notes
2020-07-14 12:20:23POOL
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected].
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) PLEASE SHOW THE CONCRETE REINFORCEMENT REQUIREMENTS
 FOR THE FOUNTAIN WALL.
 2) PLEASE SHOW THE WALL THICKNESS FOR THE FOUNTAIN
 WALL.
 3) PLEASE SHOW THE WIND DESIGN PARAMETERS USED FOR WIND
 DESIGN FOR THE FOUNTAIN WALL - FBC 1609
 4) SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW.
 DRAWINGS DO NOT SHOW IN "ADOBE READER" AS
 DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR
 ENGINEER DOES NOT HAVE AN ELECTRONIC OR DIGITAL
 SIGNATURE - PLEASE DROP OFF (CITY HALL DROP BOX) THE
 ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS ALONG
 WITH A "PLAN REVIEW REQUEST FORM" EXPLAINING THE REASON
 FOR SUBMITTING THE DOCUMENT OR DRAWINGS. PLAN REVIEW
 REQUEST FORM CAN BE OBTAINED BY E MAILING [email protected]
 AND ASKING FOR THE FORM. (AT THIS TIME DROP BOX ITEMS
 MAY TAKE 2 TO 3 WEEKS TO PROCESS - DUE TO LIMITED STAFF
 INSIDE THE BUILDING DEPT.)

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2020-08-18 Cont ID  
Sent By fgiaquin Date 2020-08-18 Time 22:42 Rev Time 0.00
Received By fgiaquin Date 2020-08-18 Time 22:09 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2020-07-17 Cont ID  
Sent By fgiaquin Date 2020-07-17 Time 20:43 Rev Time 0.00
Received By fgiaquin Date 2020-07-17 Time 20:25 Sent To  
Notes
2020-07-17 20:43:32ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1. PLAN MUST BE DIGITALLY SIGNED BY ENGINEER.
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE
 PREVIOUSLY REVIEWED SHEETS.
 CODES IN EFFECT:
  
 IF THE RESUBMITTAL IS NOT PREPARED BY A DESIGN
 PROFESSIONAL (ARCHITECT OR ENGINEER), AND THE PAGES ARE
 11X17 OR SMALLER, YOU MAY RESUBMIT, ALONG WITH A
 COMPLETED RESUBMITTAL FORM, VIA EMAIL TO
 [email protected]. THE EMAIL SHOULD INCLUDE THE PERMIT
 NUMBER AND "RESUBMITTAL" IN THE SUBJECT LINE. THE
 RESUBMITTAL FORM CAN BE FOUND AT THIS WEBSITE:
  
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
  
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE 2017 6TH ED.
 FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 V/R,
  
 FRANK GIAQUINTO III
 ELECTRICAL INSPECTOR
 ELECTRICAL PLANS EXAMINER
 CITY OF WEST PALM BEACH
 [email protected]
 CELL: 561-657-1653
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2020-08-20 Cont ID  
Sent By lcrespo Date 2020-08-20 Time 07:53 Rev Time 0.00
Received By lcrespo Date 2020-08-20 Time 07:53 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-08-18 Cont ID  
Sent By fgiaquin Date 2020-08-18 Time 22:42 Rev Time 0.00
Received By fgiaquin Date 2020-08-10 Time 09:24 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-08-07 Cont ID  
Sent By lmarchan Date 2020-08-07 Time 09:02 Rev Time 0.00
Received By lmarchan Date 2020-06-25 Time 14:39 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status P Date 2020-08-20 Cont ID  
Sent By lcrespo Date 2020-08-20 Time 07:50 Rev Time 0.00
Received By lcrespo Date 2020-08-20 Time 07:50 Sent To  
Notes
2020-08-20 07:51:0608/20/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop P PLUMBING
Rev No 2 Status F Date 2020-08-11 Cont ID  
Sent By lcrespo Date 2020-08-11 Time 14:43 Rev Time 0.00
Received By lcrespo Date 2020-08-11 Time 13:41 Sent To  
Notes
2020-08-11 14:43:5508/11/20 2ND PLUMBING/POOL REVIEW**DENIED** WITH
 COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. SECOND REQUEST PROVIDE MANUFACTURER'S SPECIFICATION
 / INSTALLATION MANUAL FOR ALL POOL EQUIPMENT; PROVIDE
 INLINE EQUIPMENT SPECS IN THE PIPING SYSTEM ( I.E.,
 FILTER, PUMP, ETC. NEED TO PROVIDE HEAD LOSS TO SHOW
 WHERE ENGINEER GOT CALCS FOR TDH) PER THE WPB FBC
 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-07-14 Cont ID  
Sent By jesmith Date 2020-07-14 Time 14:36 Rev Time 0.00
Received By jesmith Date 2020-07-14 Time 14:29 Sent To  
Notes
2020-07-14 14:36:44CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1.
 FBC RES = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 FBC PL = FLORIDA PLUMBING CODE 2017 6TH EDITION
 FS = FLORIDA STATUTES
  
 20061224 422 26TH ST
  
 1ST REVIEW
 PLUMBING COMMENTS: DENIED
  
 1. THIRD PARTY CERTIFICATION REQUIRED FOR ENGINEER'S
 DIGITAL SIGNATUR. PER THE WPB AMENDMENTS TO THE FBC,
 EACH SHEET OF PLAN IS REQUIRED TO BE SIGNED AND SEALED
 BY THE PERSON RESPONSIBLE FOR THE DESIGN. A DIGITAL
 PLAN REQUIRES A DIGITAL SIGNATURE WITH THE PROPER THIRD
 PARTY VERIFICATION. THE DIGITAL SIGNATURE MUST INCLUDE
 THE STATEMENT "SIGNED AND SEALED" AS PER FAC
 61G15-23.004. PROVIDE CORRECTION. WPB FBC 107.1; FS
 471/481
  
 2. RE: HYDRAULIC (TDH) CALCULATIONS; PER WPB FBC 107.2.
 1 AND APSP-7-2013, SHALL INCLUDE THE HEAD LOSS FOR EACH
 OF THE FOLLOWING: THE POOL HEATER, FILTER AND ALL OTHER
 INLINE APPURTENANCES AS WELL AS THE VALVES AND
 FITTINGS. PUMP IS NOT INCLUDED IN CALCULATIONS.
  
 3. PER WPB FBC 107.2.1, PROVIDE MANUFACTURER?S
 SPECIFICATION/INSTALLATION MANUAL FOR ALL POOL
 EQUIPMENT; PROVIDE PUMP PERFORMANCE CURVE. INLINE
 EQUIPMENT SPECS IN THE PIPING SYSTEM (IE. FILTER,
 HEATER, ETC. NEED TO PROVIDE HEAD LOSS TO SHOW WHERE
 ENGINEER GOT CALCS FOR TDH)
  
 4. PROVIDE SPECS FOR PRIMARY DRAINS AND SKIMMERS. THEY
 NEED TO BE DESIGNED TO PREVENT ENTRAPMENT. SEE FBC RES
 R4501.6.6. ENTRAPMENT PROTECTION FOR SUCTION OUTLETS
 SHALL BE INSTALLED IN ACCORDANCE WITH REQUIREMENTS OF
 ANSI/APSP/ICC 7.
  
  
 END OF COMMENTS.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 ALL PLANS TO BE DIGITALLY SIGNED AND SEALED BY THE
 DESIGNER IN ACCORDANCE WITH FAC AND FS.
  
  
  
 JERALD SMITH
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
 EMAIL [email protected]
 PHONE 561-246-0882 MOBILE
  
 20061224 422 26TH ST
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-08-14 Cont ID  
Sent By rmcphers Date 2020-08-14 Time 14:43 Rev Time 0.00
Received By rmcphers Date 2020-08-14 Time 14:43 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-07-14 Cont ID  
Sent By rmcphers Date 2020-07-14 Time 12:20 Rev Time 0.00
Received By rmcphers Date 2020-07-14 Time 12:20 Sent To  
Notes
2020-07-14 12:20:58SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW.
 DRAWINGS DO NOT SHOW IN "ADOBE READER" AS
 DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR
 ENGINEER DOES NOT HAVE AN ELECTRONIC OR DIGITAL
 SIGNATURE - PLEASE DROP OFF (CITY HALL DROP BOX) THE
 ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS ALONG
 WITH A "PLAN REVIEW REQUEST FORM" EXPLAINING THE REASON
 FOR SUBMITTING THE DOCUMENT OR DRAWINGS. PLAN REVIEW
 REQUEST FORM CAN BE OBTAINED BY E MAILING [email protected]
 AND ASKING FOR THE FORM. (AT THIS TIME DROP BOX ITEMS
 MAY TAKE 2 TO 3 WEEKS TO PROCESS - DUE TO LIMITED STAFF
 INSIDE THE BUILDING DEPT.)

Review Stop Z ZONING
Rev No 1 Status P Date 2020-08-05 Cont ID  
Sent By rthermid Date 2020-08-05 Time   Rev Time  
Received By rthermid Date 2020-08-05 Time   Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved