Plan Review Details - Permit 20061072
Plan Review Stops For Permit 20061072
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2020-07-16 Cont ID  
Sent By jleahy Date 2020-07-16 Time 12:40 Rev Time 0.00
Received By jleahy Date 2020-07-16 Time 12:33 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-06-26 Cont ID  
Sent By jleahy Date 2020-06-26 Time 08:44 Rev Time 0.00
Received By jpearson Date 2020-06-26 Time 08:23 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2020-07-01 Cont ID  
Sent By pleduc Date 2020-07-01 Time   Rev Time 0.00
Received By pleduc Date 2020-07-01 Time 15:33 Sent To  
Notes
2020-07-01 15:46:51A REVISION OF THE MASTER PERMIT SHOWING THIS NEW FACP
 ROOM IS REQUIRED PRIOR TO FIRE ALARM FINAL
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2020-06-24 Cont ID  
Sent By bwoods Date 2020-06-24 Time   Rev Time 0.00
Received By pleduc Date 2020-06-24 Time 12:57 Sent To  
Notes
2020-06-24 13:07:17THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
 1) SHEET FA 1.0 - THERE APPEARS TO BE A PORTION IN THE
 UPPER LEFT OF THE PLAN SHEET THAT IS CUT-OFF/MISSING.
  
 PLEASE REIVEW AND CORRECT FOR THE OFFICIAL RECORD OF
 THE SUBMITTAL.
  
  
 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-07-16 Cont ID  
Sent By jleahy Date 2020-07-16 Time 12:40 Rev Time 0.00
Received By jleahy Date 2020-06-29 Time 09:28 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2020-06-26 Time   Rev Time 0.00
Received By lmarchan Date 2020-06-23 Time 15:39 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-07-16 Cont ID  
Sent By jleahy Date 2020-07-16 Time 12:40 Rev Time 0.00
Received By jleahy Date 2020-07-16 Time 12:40 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-06-26 Cont ID  
Sent By jpearson Date 2020-06-26 Time 08:34 Rev Time 0.00
Received By jpearson Date 2020-06-26 Time 08:33 Sent To  
Notes
2020-06-26 08:33:56PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF PLAN
 IS REQUIRED TO BE SIGNED AND SEALED BY THE PERSON
 RESPONSIBLE FOR THE DESIGN. A DIGITAL PLAN REQUIRES A
 DIGITAL SIGNATURE WITH THE PROPER THIRD PARTY
 VERIFICATION. SELF-CERTIFICATION IS NOT ACCEPTABLE FOR
 ENGINEERS. ADDITIONALLY, THE DIGITAL SIGNATURE MUST
 INCLUDE THE STATEMENT "SIGNED AND SEALED" WHEN A
 DIGITAL SEAL IS NOT ON THE PLAN, AS PER FAC
 61G15-23.004. PROVIDE CORRECTION. WPB FBC 107.1; FS
 471/481