Plan Review Details - Permit 20060685
Plan Review Stops For Permit 20060685
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2020-07-28 Cont ID  
Sent By rrossano Date 2020-07-28 Time   Rev Time  
Received By rrossano Date 2020-07-28 Time   Sent To I
Notes
2020-07-28 10:18:32PASSED WITH PROVISOS:
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. MORE INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB
 CONSTRUCTION STANDARD DETAIL GC-5 (WHEN DISTANCE
 BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER),
 OR WPB CONSTRUCTION STANDARD DETAIL GC-6 (WHEN DISTANCE
 BETWEEN CURB OR EDGE OF PAVEMENT IS LESS THAN 10 FT.)
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO
 PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 FAX: (561) 494-1116
 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2020-06-29 Cont ID  
Sent By aborngra Date 2020-06-29 Time 10:42 Rev Time 0.00
Received By aborngra Date 2020-06-29 Time 10:42 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-07-30 Cont ID  
Sent By shill Date 2020-07-30 Time 07:35 Rev Time 0.00
Received By shill Date 2020-06-17 Time 11:15 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2020-06-29 Cont ID  
Sent By thermid Date 2020-06-29 Time   Rev Time  
Received By rthermid Date 2020-06-29 Time   Sent To I
Notes
***NONE***