Plan Review Details - Permit 20060681
Plan Review Stops For Permit 20060681
Review Stop E ELECTRICAL
Rev No 4 Status P Date 2020-10-04 Cont ID  
Sent By fgiaquin Date 2020-10-04 Time 23:39 Rev Time 0.00
Received By fgiaquin Date 2020-10-04 Time 22:53 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status F Date 2020-09-10 Cont ID  
Sent By fgiaquin Date 2020-09-10 Time 23:32 Rev Time 0.00
Received By fgiaquin Date 2020-09-10 Time 22:47 Sent To  
Notes
2020-09-10 23:31:46CONTRACT ONLY SIGNED BY ONE PARTY.
  
 IS THIS A PRE-WIRE ONLY INSTALLATION OR WILL ALL
 DEVICES BE INSTALLED? IF SO, I NEED CUT SHEETS OF ALL
 DEVICES SHOWING LISTING. FBC 107.2.1

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2020-09-02 Cont ID  
Sent By fgiaquin Date 2020-09-02 Time 21:59 Rev Time 0.00
Received By fgiaquin Date 2020-09-02 Time 21:20 Sent To  
Notes
2020-09-02 21:59:52SEE LAST REVIEW COMMENTS. NO CONTRACT PROVIDED NO CUT
 SHEETS SHOWING UL APPROVALS PROVIDED.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2020-07-15 Cont ID  
Sent By fgiaquin Date 2020-07-15 Time 20:23 Rev Time 0.00
Received By fgiaquin Date 2020-07-15 Time 19:36 Sent To  
Notes
2020-07-15 20:23:36ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1.PROVIDE CUT SHEETS FOR PRODUCT APPROVAL OF ALL
 MATERIALS AND EQUIPMENT, SHOWING UL OR OTHER NRTL
 LISTING. NEC 110.2, 110.3B, FBC 107.2.1
  
 2. PROVIDE CONTRACT SIGNED BY CUSTOMER AND ELECTRICAL
 CONTRACTOR QUALIFER SHOWING VALUE OF JOB INCLUDING ALL
 MATERIALS/EQUIPMENT AND LABOR.
  
 CITY ORDINANCE AND FBC 109.3 BUILDING PERMIT
 VALUATIONS. IF, IN THE OPINION OF THE BUILDING
 OFFICIAL, THE CLAIMED VALUATION OF BUILDING,
 ALTERATION, STRUCTURE, ELECTRICAL, GAS, MECHANICAL OR
 PLUMBING SYSTEMS APPEARS TO BE UNDERESTIMATED ON THE
 APPLICATION, THE PERMIT SHALL BE DENIED, UNLESS THE
 APPLICANT CAN SHOW DETAILED, QUANTITY ESTIMATES, AND/OR
 BONA FIDE SIGNED CONTRACTS (EXCLUDING LAND VALUE) TO
 MEET THE APPROVAL OF THE BUILDING OFFICIAL. FOR
 PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS
 SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.
  
  
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE
 PREVIOUSLY REVIEWED SHEETS.
 CODES IN EFFECT:
  
 IF THE RESUBMITTAL IS NOT PREPARED BY A DESIGN
 PROFESSIONAL (ARCHITECT OR ENGINEER), AND THE PAGES ARE
 11X17 OR SMALLER, YOU MAY RESUBMIT, ALONG WITH A
 COMPLETED RESUBMITTAL FORM, VIA EMAIL TO
 [email protected]. THE EMAIL SHOULD INCLUDE THE PERMIT
 NUMBER AND "RESUBMITTAL" IN THE SUBJECT LINE. THE
 RESUBMITTAL FORM CAN BE FOUND AT THIS WEBSITE:
  
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
  
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE 2017 6TH ED.
 FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 V/R,
  
 FRANK GIAQUINTO III
 ELECTRICAL INSPECTOR
 ELECTRICAL PLANS EXAMINER
 CITY OF WEST PALM BEACH
 [email protected]
 CELL: 561-657-1653
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2020-09-10 Cont ID  
Sent By fgiaquin Date 2020-09-10 Time 23:33 Rev Time 0.00
Received By fgiaquin Date 2020-09-04 Time 14:27 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-09-02 Cont ID  
Sent By fgiaquin Date 2020-09-02 Time 22:00 Rev Time 0.00
Received By fgiaquin Date 2020-08-25 Time 10:21 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-07-15 Cont ID  
Sent By fgiaquin Date 2020-07-15 Time 20:26 Rev Time 0.00
Received By fgiaquin Date 2020-06-29 Time 12:23 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2020-09-10 Cont ID  
Sent By fgiaquin Date 2020-09-10 Time 23:33 Rev Time 0.00
Received By fgiaquin Date 2020-09-10 Time 23:33 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-09-02 Cont ID  
Sent By fgiaquin Date 2020-09-02 Time 22:00 Rev Time 0.00
Received By fgiaquin Date 2020-09-02 Time 22:00 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-07-15 Cont ID  
Sent By fgiaquin Date 2020-07-15 Time 20:25 Rev Time 0.00
Received By fgiaquin Date 2020-07-15 Time 20:25 Sent To  
Notes
***NONE***