Plan Review Details - Permit 20060140
Plan Review Stops For Permit 20060140
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-07-31 Cont ID  
Sent By cthroop Date 2020-07-31 Time 14:39 Rev Time 0.00
Received By cthroop Date 2020-07-31 Time 14:30 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-07-09 Cont ID  
Sent By rmcphers Date 2020-07-09 Time 13:36 Rev Time 0.00
Received By rmcphers Date 2020-07-09 Time 13:36 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2020-07-31 Cont ID  
Sent By cthroop Date 2020-07-31 Time 14:39 Rev Time 0.00
Received By cthroop Date 2020-07-31 Time 14:30 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-07-15 Cont ID  
Sent By jleahy Date 2020-07-15 Time 10:10 Rev Time 0.00
Received By jleahy Date 2020-07-15 Time 10:07 Sent To  
Notes
2020-07-15 10:10:46PAGE NEEDS A SIGNATURE JLEAHY RISER AND LOAD
 CALCULATION

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2020-07-31 Cont ID  
Sent By cthroop Date 2020-07-31 Time 14:31 Rev Time 0.00
Received By cthroop Date 2020-07-31 Time 14:31 Sent To  
Notes
2020-07-31 14:31:43A SEPERATE GAS PERMIT IS REQUIRED. CT

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-07-31 Cont ID  
Sent By cthroop Date 2020-07-31 Time 14:40 Rev Time 0.00
Received By cthroop Date 2020-07-20 Time 14:19 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-07-20 Cont ID  
Sent By shill Date 2020-07-20 Time 08:50 Rev Time 0.00
Received By shill Date 2020-06-22 Time 08:52 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-07-31 Cont ID  
Sent By cthroop Date 2020-07-31 Time 14:39 Rev Time 0.00
Received By cthroop Date 2020-07-31 Time 14:30 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-07-09 Cont ID  
Sent By rmcphers Date 2020-07-09 Time 13:36 Rev Time 0.00
Received By rmcphers Date 2020-07-09 Time 13:36 Sent To  
Notes
2020-07-09 13:37:23SLAB ENGINEERING = SIGNED AND SEALED DRAWINGS NEED TO
 BE DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW - OR -
 IF YOUR ENGINEER DOES NOT HAVE A ELECTRONIC OR DIGITAL
 SIGNATURE - PLEASE DROP OFF (CITY HALL DROP BOX) THE
 ORIGINAL SIGNED AND SEALED DOCUMENT ALONG WITH A "PLAN
 REVIEW REQUEST FORM" EXPLAINING THE REASON FOR
 SUBMITTING THE DOCUMENT OR DRAWINGS. PLAN REVIEW
 REQUEST FORM CAN BE OBTAINED BY E MAILING [email protected]
 AND ASKING FOR THE FORM.

Review Stop Z ZONING
Rev No 1 Status P Date   Cont ID  
Sent By kalexand Date 2020-07-17 Time   Rev Time  
Received By   Date 2020-07-17 Time   Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved