Plan Review Stops For Permit 20050529 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2020-08-19 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-08-19 |
Time |
07:36 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-08-19 |
Time |
07:36 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2020-08-03 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-08-03 |
Time |
11:01 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-08-03 |
Time |
10:53 |
Sent To |
|
|
Notes |
2020-08-03 11:03:12 | PLAN | | REVIEW COMMENTS | | | | 3RD REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | COMMENTS FOR THE PREVIOUS REVIEW WERE NOT ADDRESSED. | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | FBC 107 | | 1) THE GENERATOR PAD ENGINEERING THAT WAS SUBMITTED IS | | NOT ACCEPTABLE FOR THE FOLLOWING REASONS: | | A) THE SCHEDULE ON THE DRAWINGS SPECIFIES THE REQUIRED | | MINIMUM WEIGHT FOR THE 22KW GENERATOR AS 466 LBS. AND | | THE SPECIFICATIONS FOR YOUR GENERATOR HAS A WEIGHT OF | | 445 LBS. | | B) THE SCHEDULE ON THE DRAWINGS SPECIFIES THE ALLOWABLE | | WIND LOAD PRESSURES FOR THE GENERATOR, BUT THE REQUIRED | | WIND LOAD PRESSURES FOR THE SITE IT WILL BE INSTALLED | | ARE NOT PROVIDED. SEE GENERAL NOTE #2 ON THE DRAWING | | THAT STATES THAT THE REQUIRED PRESSURES FOR THE SITE OR | | TO BE DETERMINED BY OTHERS. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2020-07-09 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-07-09 |
Time |
14:28 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-07-09 |
Time |
14:28 |
Sent To |
|
|
Notes |
2020-07-09 14:43:47 | PLAN | | REVIEW COMMENTS | | | | 2ND REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | FBC 107 | | 1) THE GENERATOR PAD ENGINEERING THAT WAS SUBMITTED IS | | NOT ACCEPTABLE FOR THE FOLLOWING REASONS: | | A) THE SCHEDULE ON THE DRAWINGS SPECIFIES THE REQUIRED | | MINIMUM WEIGHT FOR THE 22KW GENERATOR AS 466 LBS. AND | | THE SPECIFICATIONS FOR YOUR GENERATOR HAS A WEIGHT OF | | 445 LBS. | | B) THE SCHEDULE ON THE DRAWINGS SPECIFIES THE ALLOWABLE | | WIND LOAD PRESSURES FOR THE GENERATOR, BUT THE REQUIRED | | WIND LOAD PRESSURES FOR THE SITE IT WILL BE INSTALLED | | ARE NOT PROVIDED. SEE GENERAL NOTE #2 ON THE DRAWING | | THAT STATES THAT THE REQUIRED PRESSURES FOR THE SITE OR | | TO BE DETERMINED BY OTHERS. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2020-06-02 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-06-02 |
Time |
13:26 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-06-02 |
Time |
13:26 |
Sent To |
|
|
Notes |
2020-06-02 13:29:38 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) SUBMIT GENERATOR PAD PLANS AND GENERATOR TO PAD | | ANCHORING DETAILS. FBC 107 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2020-06-19 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-06-19 |
Time |
14:24 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-06-19 |
Time |
08:03 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
3 |
Status |
P |
Date |
2020-07-31 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2020-07-31 |
Time |
12:52 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2020-07-31 |
Time |
12:52 |
Sent To |
|
|
Notes |
2020-07-31 12:59:06 | 07/31/20 REVIEWED FOR CODE COMPLIANCE (GAS) | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM | | THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND | | NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF | | PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY | | ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | AVOID VOIDING OF THE PERMIT. | | | | LUIS A. CRESPO | | PLUMBING INSPECTOR / PLUMBING PLAN REVIEW | | AVAILABLE FROM 6:30 AM TO 7:30 AM / 2:00 PM TO 5:00 PM | | EMAIL: [email protected] CELL: 561-701-6437 | | |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
P |
Date |
2020-07-16 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2020-07-16 |
Time |
09:17 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2020-07-16 |
Time |
08:41 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
F |
Date |
2020-06-18 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2020-06-18 |
Time |
13:54 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2020-06-18 |
Time |
13:39 |
Sent To |
|
|
Notes |
2020-06-18 13:54:44 | 1ST REVIEW FBC-2017 MECHANICAL | | PERMIT- 20050529 | | | | CODES IN EFFECT: | | | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH | | EDITION 2017 | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | EDITION 2017 | | | | PLAN REVIEW RESULTS: DENIED. | | | | 1) PLEASE INCLUDE THE GAS PERMIT APPLICATION IN THE | | DOCUMENTS. FBC FS 107.2.1 | | | | 2) PLEASE SHOW THE EXISTING GAS SYSTEM PRESSURE. IF THE | | EXISTING SYSTEM WAS A 2PSI SYSTEM PLEASE SHOW MP | | REGULATORS FOR THE APPLIANCES. FBC FS 107.2.1 | | | | 3) PLEASE PROVIDE THE LONGEST DEVELOPED LENGTH TO THE | | MOST REMOTE APPLIANCE SO WE CAN VERIFY THE EXISTING | | SYSTEM IS ADEQUATE TO HANDLE THE ADDITIONAL 396,000 | | BTU?S. FBC FS 107.2.1 | | | | | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD | | SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER | | SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN | | THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS | | PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS | | PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR | | UPDATED. | | | | | | MICHAEL EDWARDS | | MECHANICAL EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL. 33401 | | 561-805-6728 | | [email protected] | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2020-08-19 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-08-19 |
Time |
07:37 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-08-06 |
Time |
15:01 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2020-08-03 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-08-03 |
Time |
11:04 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-07-22 |
Time |
14:37 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2020-07-16 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2020-07-16 |
Time |
09:58 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2020-07-02 |
Time |
10:36 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2020-06-19 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-06-19 |
Time |
14:24 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-06-01 |
Time |
16:52 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
N |
Date |
2020-07-31 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2020-07-31 |
Time |
12:52 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2020-07-31 |
Time |
12:52 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
N |
Date |
2020-07-16 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2020-07-16 |
Time |
09:18 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2020-07-16 |
Time |
09:18 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
N |
Date |
2020-06-18 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2020-06-18 |
Time |
13:54 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2020-06-18 |
Time |
13:54 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
4 |
Status |
P |
Date |
2020-08-13 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2020-08-13 |
Time |
15:02 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2020-08-13 |
Time |
14:55 |
Sent To |
|
|
Notes |
2020-08-13 15:02:46 | ENGINEER DRAWING MATCHES ONE UPLOADED TO PROJECTDOX. | | CONCRETE PAD ENGINEERING DRAWING WITH EMBOSSED SEAL AND | | ORIGINAL SIGNATURE SENT TO STORAGE. JG. |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
F |
Date |
2020-08-03 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-08-03 |
Time |
11:01 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-08-03 |
Time |
11:01 |
Sent To |
|
|
Notes |
2020-08-04 07:52:04 | PETER E VALENTI | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6673 | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | FBC R = FBC RESIDENTIAL | | FBC M = FBC MECHANICAL | | | | SIGNATURE REVIEW DENIED AS WINDLOAD PAGE IS MISSING | | (SEE PRESSURE DESIGN NOTE OF CONCRETE PAD PAGE). | | ORIGINAL SIGNATURES ARE ON THE SUBMITTED CONCRETE PAD | | PAGE. | 2020-08-03 11:04:07 | THE PREFAB GENERATOR PAD DRAWINGS FROM THE ENGINEER ARE | | REQUIRED TO BE DIGITALLY SIGNED AND SEALED WHEN | | SUBMITTED ELECTRONICALLY. ELECTRONICALLY SUBMITTED | | DRAWINGS ARE REQUIRED TO HAVE THE ENGINEER'S DIGITAL | | SIGNATURE ON THEM. YOU ALSO HAVE THE OPTION TO SUBMIT | | THE SIGNED AND SEALED PAPER VERSION OF DRAWINGS. AFTER | | THE ELECTRONIC PLANS HAVE BEEN APPROVED, YOU CAN SUBMIT | | THE CORRESPONDING PAPER DRAWINGS AT THE BUILDING | | DEPARTMENT TO BE VERIFIED. THE ENGINEER'S ORIGINAL | | HANDWRITTEN SIGNATURE AND SEAL IS REQUIRED TO BE ON THE | | DRAWINGS. NO PHOTOCOPY OR OTHER FACIMILES OF THE | | SIGNATURE ARE ACCEPTABLE. FS 471 & 61G15 |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2020-07-09 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-07-09 |
Time |
14:44 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-07-09 |
Time |
14:43 |
Sent To |
|
|
Notes |
2020-07-09 14:58:01 | ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED TO HAVE | | THE ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE | | THE OPTION TO SUBMIT THE SIGNED AND SEALED PAPER | | VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS HAVE | | BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING PAPER | | DRAWINGS AT THE BUILDING DEPARTMENT TO BE VERIFIED. THE | | ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE AND SEAL IS | | REQUIRED TO BE ON THE DRAWINGS. NO PHOTOCOPY OR OTHER | | FACIMILES OF THE SIGNATURE ARE ACCEPTABLE. FS 471 & | | 61G15 |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2020-06-18 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2020-06-18 |
Time |
13:56 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2020-06-18 |
Time |
13:55 |
Sent To |
|
|
Notes |
2020-06-18 13:58:01 | DESIGNER MUST SIGN EACH DRAWING. FBC FS 471, FS 481 |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
|
|
|
Cont ID |
|
Sent By |
kalexand |
Date |
2020-06-11 |
Time |
|
Rev Time |
|
Received By |
|
Date |
2020-06-11 |
Time |
|
Sent To |
I |
|
Notes |
2020-06-11 08:53:25 | ZONING PLAN REVIEW | | ________________________________________ | | | | DATE OF REVIEW: 6/11/20 | | ________________________________________ | | | | REVIEW STATUS: PASSED WITH PROVISOS | | ________________________________________ | | | | THIS REVIEW HAS BEEN PASSED SUBJECT TO THE FOLLOWING | | PROVISOS: | | | | 1. INDICATE GENERATOR SETBACK FROM PROPERTY LINEON | | SURVEY. | | ________________________________________ | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | ________________________________________ | | | | QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING: | | | | KIZZI ALEXANDRE, ASSOCIATE PLANNER | | CITY OF WEST PALM BEACH | | DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION | | 401 CLEMATIS STREET - P.O. BOX 3147 | | WEST PALM BEACH, FLORIDA 33402 | | | | P: 561.822.1442 | | TTY: 800.955.8771 | | E: [email protected] | | | | W: WPB.ORG | | |
|
|