Plan Review Details - Permit 20050529
Plan Review Stops For Permit 20050529
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2020-08-19 Cont ID  
Sent By rmcdouga Date 2020-08-19 Time 07:36 Rev Time 0.00
Received By rmcdouga Date 2020-08-19 Time 07:36 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2020-08-03 Cont ID  
Sent By rmcdouga Date 2020-08-03 Time 11:01 Rev Time 0.00
Received By rmcdouga Date 2020-08-03 Time 10:53 Sent To  
Notes
2020-08-03 11:03:12PLAN
 REVIEW COMMENTS
  
 3RD REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 COMMENTS FOR THE PREVIOUS REVIEW WERE NOT ADDRESSED.
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
 FBC 107
 1) THE GENERATOR PAD ENGINEERING THAT WAS SUBMITTED IS
 NOT ACCEPTABLE FOR THE FOLLOWING REASONS:
 A) THE SCHEDULE ON THE DRAWINGS SPECIFIES THE REQUIRED
 MINIMUM WEIGHT FOR THE 22KW GENERATOR AS 466 LBS. AND
 THE SPECIFICATIONS FOR YOUR GENERATOR HAS A WEIGHT OF
 445 LBS.
 B) THE SCHEDULE ON THE DRAWINGS SPECIFIES THE ALLOWABLE
 WIND LOAD PRESSURES FOR THE GENERATOR, BUT THE REQUIRED
 WIND LOAD PRESSURES FOR THE SITE IT WILL BE INSTALLED
 ARE NOT PROVIDED. SEE GENERAL NOTE #2 ON THE DRAWING
 THAT STATES THAT THE REQUIRED PRESSURES FOR THE SITE OR
 TO BE DETERMINED BY OTHERS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2020-07-09 Cont ID  
Sent By rmcdouga Date 2020-07-09 Time 14:28 Rev Time 0.00
Received By rmcdouga Date 2020-07-09 Time 14:28 Sent To  
Notes
2020-07-09 14:43:47PLAN
 REVIEW COMMENTS
  
 2ND REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
 FBC 107
 1) THE GENERATOR PAD ENGINEERING THAT WAS SUBMITTED IS
 NOT ACCEPTABLE FOR THE FOLLOWING REASONS:
 A) THE SCHEDULE ON THE DRAWINGS SPECIFIES THE REQUIRED
 MINIMUM WEIGHT FOR THE 22KW GENERATOR AS 466 LBS. AND
 THE SPECIFICATIONS FOR YOUR GENERATOR HAS A WEIGHT OF
 445 LBS.
 B) THE SCHEDULE ON THE DRAWINGS SPECIFIES THE ALLOWABLE
 WIND LOAD PRESSURES FOR THE GENERATOR, BUT THE REQUIRED
 WIND LOAD PRESSURES FOR THE SITE IT WILL BE INSTALLED
 ARE NOT PROVIDED. SEE GENERAL NOTE #2 ON THE DRAWING
 THAT STATES THAT THE REQUIRED PRESSURES FOR THE SITE OR
 TO BE DETERMINED BY OTHERS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-06-02 Cont ID  
Sent By rmcdouga Date 2020-06-02 Time 13:26 Rev Time 0.00
Received By rmcdouga Date 2020-06-02 Time 13:26 Sent To  
Notes
2020-06-02 13:29:38PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT GENERATOR PAD PLANS AND GENERATOR TO PAD
 ANCHORING DETAILS. FBC 107

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-06-19 Cont ID  
Sent By jleahy Date 2020-06-19 Time 14:24 Rev Time 0.00
Received By jleahy Date 2020-06-19 Time 08:03 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 3 Status P Date 2020-07-31 Cont ID  
Sent By lcrespo Date 2020-07-31 Time 12:52 Rev Time 0.00
Received By lcrespo Date 2020-07-31 Time 12:52 Sent To  
Notes
2020-07-31 12:59:0607/31/20 REVIEWED FOR CODE COMPLIANCE (GAS)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEW
 AVAILABLE FROM 6:30 AM TO 7:30 AM / 2:00 PM TO 5:00 PM
 EMAIL: [email protected] CELL: 561-701-6437
  

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2020-07-16 Cont ID  
Sent By medwards Date 2020-07-16 Time 09:17 Rev Time 0.00
Received By medwards Date 2020-07-16 Time 08:41 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2020-06-18 Cont ID  
Sent By medwards Date 2020-06-18 Time 13:54 Rev Time 0.00
Received By medwards Date 2020-06-18 Time 13:39 Sent To  
Notes
2020-06-18 13:54:441ST REVIEW FBC-2017 MECHANICAL
 PERMIT- 20050529
  
 CODES IN EFFECT:
  
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH
 EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) PLEASE INCLUDE THE GAS PERMIT APPLICATION IN THE
 DOCUMENTS. FBC FS 107.2.1
  
 2) PLEASE SHOW THE EXISTING GAS SYSTEM PRESSURE. IF THE
 EXISTING SYSTEM WAS A 2PSI SYSTEM PLEASE SHOW MP
 REGULATORS FOR THE APPLIANCES. FBC FS 107.2.1
  
 3) PLEASE PROVIDE THE LONGEST DEVELOPED LENGTH TO THE
 MOST REMOTE APPLIANCE SO WE CAN VERIFY THE EXISTING
 SYSTEM IS ADEQUATE TO HANDLE THE ADDITIONAL 396,000
 BTU?S. FBC FS 107.2.1
  
  
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD
 SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER
 SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN
 THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS
 PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS
 PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR
 UPDATED.
  
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2020-08-19 Cont ID  
Sent By rmcdouga Date 2020-08-19 Time 07:37 Rev Time 0.00
Received By rmcdouga Date 2020-08-06 Time 15:01 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2020-08-03 Cont ID  
Sent By rmcdouga Date 2020-08-03 Time 11:04 Rev Time 0.00
Received By rmcdouga Date 2020-07-22 Time 14:37 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-07-16 Cont ID  
Sent By lmarchan Date 2020-07-16 Time 09:58 Rev Time 0.00
Received By lmarchan Date 2020-07-02 Time 10:36 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-06-19 Cont ID  
Sent By jleahy Date 2020-06-19 Time 14:24 Rev Time 0.00
Received By jleahy Date 2020-06-01 Time 16:52 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status N Date 2020-07-31 Cont ID  
Sent By lcrespo Date 2020-07-31 Time 12:52 Rev Time 0.00
Received By lcrespo Date 2020-07-31 Time 12:52 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status N Date 2020-07-16 Cont ID  
Sent By medwards Date 2020-07-16 Time 09:18 Rev Time 0.00
Received By medwards Date 2020-07-16 Time 09:18 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2020-06-18 Cont ID  
Sent By medwards Date 2020-06-18 Time 13:54 Rev Time 0.00
Received By medwards Date 2020-06-18 Time 13:54 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 4 Status P Date 2020-08-13 Cont ID  
Sent By jgomez Date 2020-08-13 Time 15:02 Rev Time 0.00
Received By jgomez Date 2020-08-13 Time 14:55 Sent To  
Notes
2020-08-13 15:02:46ENGINEER DRAWING MATCHES ONE UPLOADED TO PROJECTDOX.
 CONCRETE PAD ENGINEERING DRAWING WITH EMBOSSED SEAL AND
 ORIGINAL SIGNATURE SENT TO STORAGE. JG.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status F Date 2020-08-03 Cont ID  
Sent By rmcdouga Date 2020-08-03 Time 11:01 Rev Time 0.00
Received By rmcdouga Date 2020-08-03 Time 11:01 Sent To  
Notes
2020-08-04 07:52:04PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
 FBC M = FBC MECHANICAL
  
 SIGNATURE REVIEW DENIED AS WINDLOAD PAGE IS MISSING
 (SEE PRESSURE DESIGN NOTE OF CONCRETE PAD PAGE).
 ORIGINAL SIGNATURES ARE ON THE SUBMITTED CONCRETE PAD
 PAGE.
2020-08-03 11:04:07THE PREFAB GENERATOR PAD DRAWINGS FROM THE ENGINEER ARE
 REQUIRED TO BE DIGITALLY SIGNED AND SEALED WHEN
 SUBMITTED ELECTRONICALLY. ELECTRONICALLY SUBMITTED
 DRAWINGS ARE REQUIRED TO HAVE THE ENGINEER'S DIGITAL
 SIGNATURE ON THEM. YOU ALSO HAVE THE OPTION TO SUBMIT
 THE SIGNED AND SEALED PAPER VERSION OF DRAWINGS. AFTER
 THE ELECTRONIC PLANS HAVE BEEN APPROVED, YOU CAN SUBMIT
 THE CORRESPONDING PAPER DRAWINGS AT THE BUILDING
 DEPARTMENT TO BE VERIFIED. THE ENGINEER'S ORIGINAL
 HANDWRITTEN SIGNATURE AND SEAL IS REQUIRED TO BE ON THE
 DRAWINGS. NO PHOTOCOPY OR OTHER FACIMILES OF THE
 SIGNATURE ARE ACCEPTABLE. FS 471 & 61G15

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2020-07-09 Cont ID  
Sent By rmcdouga Date 2020-07-09 Time 14:44 Rev Time 0.00
Received By rmcdouga Date 2020-07-09 Time 14:43 Sent To  
Notes
2020-07-09 14:58:01ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED TO HAVE
 THE ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE
 THE OPTION TO SUBMIT THE SIGNED AND SEALED PAPER
 VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS HAVE
 BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING PAPER
 DRAWINGS AT THE BUILDING DEPARTMENT TO BE VERIFIED. THE
 ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE AND SEAL IS
 REQUIRED TO BE ON THE DRAWINGS. NO PHOTOCOPY OR OTHER
 FACIMILES OF THE SIGNATURE ARE ACCEPTABLE. FS 471 &
 61G15

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-06-18 Cont ID  
Sent By medwards Date 2020-06-18 Time 13:56 Rev Time 0.00
Received By medwards Date 2020-06-18 Time 13:55 Sent To  
Notes
2020-06-18 13:58:01DESIGNER MUST SIGN EACH DRAWING. FBC FS 471, FS 481

Review Stop Z ZONING
Rev No 1 Status P Date   Cont ID  
Sent By kalexand Date 2020-06-11 Time   Rev Time  
Received By   Date 2020-06-11 Time   Sent To I
Notes
2020-06-11 08:53:25ZONING PLAN REVIEW
 ________________________________________
  
 DATE OF REVIEW: 6/11/20
 ________________________________________
  
 REVIEW STATUS: PASSED WITH PROVISOS
 ________________________________________
  
 THIS REVIEW HAS BEEN PASSED SUBJECT TO THE FOLLOWING
 PROVISOS:
  
 1. INDICATE GENERATOR SETBACK FROM PROPERTY LINEON
 SURVEY.
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 KIZZI ALEXANDRE, ASSOCIATE PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1442
 TTY: 800.955.8771
 E: [email protected]
  
 W: WPB.ORG
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved