Plan Review Details - Permit 20050403
Plan Review Stops For Permit 20050403
Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2020-06-25 Cont ID  
Sent By rrossano Date 2020-06-25 Time   Rev Time 0.00
Received By rrossano Date 2020-06-25 Time   Sent To I
Notes
2020-06-25 11:59:01PASSED WITH PROVISOS:
  
 PROVISOS FOR DRIVEWAY WITH PAVERS
 1) FOR DRIVEWAYS WITHIN THE CITY OF WPB WE HIGHLY
 RECOMMEND THE USE OF ASTM C-1272 STANDARD FOR PAVERS,
 FOR THIS TYPE OF SPECIFICATION THE THICKNESS FOR PAVERS
 IS RECOMMEND TO BE 3-1/8". (RIGHT-OF-WAY PORTION OF
 DRIVEWAY APRON).
 2) "F" TYPE PAVERS ARE RECOMMENDED WHEN USING A
 FLEXIBLE BASE (SAND AGGREGATE, COMPACTED GRAVEL BASE,
 ETC. ). FOR TYPE "F" PAVERS SHOULD BE NOT LESS THAN 2
 5/8" IN THICKNESS. REF: ARCHITECTURAL GRAPHIC STANDARDS
 FOR RESIDENTIAL CONSTRUCTION, 2ND EDITION.
 3) THE PAVER DRIVEWAY AGREEMENT IS A REQUIREMENT IF
 PAVERS ARE USED IN THE RIGHT OF WAY PORTION OF THE
 DRIVEWAY. THE AGREEMENT MUST BE RECORDED AT PALM BEACH
 COUNTY COURTHOUSE - RECORDING DEPT. 4.25. A RECORDED
 COPY OF THIS DOCUMENT SHOULD BE FAXED TO (561)
 494-1116. ATTENTION: DRIVEWAY REVIEWER. DOCUMENT NEEDS
 TO BE RECORDED PRIOR TO FINAL SIGN OFF.
 4) CALL FOR LOCATES, DIAL 811 BEFORE YOU DIG. FOR MORE
 INFO ON "CALL BEFORE YOU DIG", GO TO
 HTTP://WWW.SUNSHINE811.COM (REF: UNDERGROUND FACILITY
 DAMAGE PREVENTION AND SAFETY ACT, FLORIDA STATUTE,
 CHAPTER 556.)
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO
 PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 FAX: (561) 494-1116
 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2020-06-01 Cont ID  
Sent By rrossano Date 2020-06-01 Time   Rev Time  
Received By rrossano Date 2020-06-01 Time   Sent To I
Notes
2020-06-01 16:51:31PLEASE ADDRESS ZONING COMMENTS.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-06-29 Cont ID  
Sent By shill Date 2020-06-29 Time 14:33 Rev Time 0.00
Received By shill Date 2020-06-11 Time 13:56 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2020-06-03 Time   Rev Time 0.00
Received By lmarchan Date 2020-05-13 Time 14:15 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2020-06-15 Cont ID  
Sent By awooten Date 2020-06-15 Time   Rev Time 0.00
Received By awooten Date 2020-06-15 Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2020-05-26 Cont ID  
Sent By awooten Date 2020-05-26 Time   Rev Time  
Received By awooten Date 2020-05-26 Time   Sent To  
Notes
2020-05-26 15:22:31****************************ZONING REVIEW
 FAILED************************
  
 PROVIDE A SURVEY OF PROPERTY.
  
 PROVIDE THE DIMENSIONS OF DRIVEWAY ON SITE PLAN.
  
 PROVIDE THE OPEN SPACE/LANSCAPED AREA CALCULATIONS FOR
 THE FRONT YARD. A MINIMUM OF 60% OF THE FRONT YARD IS
 TO BE OPEN AND LANDSCAPED WITH LIVING PLANT MATERIAL.
  
 ALANA WOOTEN
 PLANNER
 PLANNING DIVISION
 561-822-1449
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved