Plan Review Stops For Permit 20050306 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2020-11-30 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-11-30 |
Time |
10:00 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-11-30 |
Time |
10:00 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2021-02-10 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2021-02-10 |
Time |
16:36 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2021-02-10 |
Time |
16:35 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2021-01-14 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2021-01-14 |
Time |
09:12 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2021-01-14 |
Time |
09:11 |
Sent To |
|
|
Notes |
2021-01-14 09:13:40 | SEE COMMENTS FROM 12/7/20 REVIEW JLEAHY |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2020-12-07 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-12-07 |
Time |
14:24 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-12-07 |
Time |
14:24 |
Sent To |
|
|
Notes |
2020-12-07 14:26:45 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | FLORIDA BUILDING CODE 2017 6TH EDITION | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | NFPA 70 2014 EDITION | | | | JAKE LEAHY BN, BU, PX | | ELECTRICAL PLANS EXAMINER II | | 561-805-6713 | | [email protected] | | | | NO WIRE SIZES OR BREAKER SIZES SHOWN ON PLANS 215.5 | | | | PLANS TO BE SEALED BY AN ENGINEER (480V) |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
3 |
Status |
P |
Date |
2021-02-02 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2021-02-02 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2021-02-02 |
Time |
11:32 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
F |
Date |
2021-01-06 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2021-01-06 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2021-01-06 |
Time |
10:35 |
Sent To |
|
|
Notes |
2021-01-06 10:42:30 | FIRE COMMENTS PREVIOUSLY SUBMITTED DO NOT APPEAR TO BE | | SPECIFICALLY ADDRESSED OR PROVIDED WITH SPECIFIC DETAIL | | ON THIS RESUBMITTAL. | | | | THE PREVIOUS FIRE COMMENTS ARE RE-SUBMITTED BELOW: | | | | | | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | 1) THERE NO INDICATIONS OF EXHAUST PIPING/TUBING | | | | PER NFPA 110 | | | | CHAPTER 1 ADMINISTRATION | | 1.1 SCOPE. THIS STANDARD CONTAINS REQUIREMENTS COVERING | | THE | | PERFORMANCE OF EMERGENCY AND STANDBY POWER SYSTEMS | | PROVIDING | | AN ALTERNATE SOURCE OF ELECTRICAL POWER TO LOADS IN | | BUILDINGS | | AND FACILITIES IN THE EVENT THAT THE PRIMARY POWER | | SOURCE | | FAILS. | | 1.1.1 POWER SYSTEMS COVERED IN THIS STANDARD INCLUDE | | POWER | | SOURCES, TRANSFER EQUIPMENT, CONTROLS, SUPERVISORY | | EQUIPMENT, | | AND ALL RELATED ELECTRICAL AND MECHANICAL AUXILIARY AND | | ACCESSORY | | EQUIPMENT NEEDED TO SUPPLY ELECTRICAL POWER TO THE LOAD | | TERMINALS OF THE TRANSFER EQUIPMENT. | | 1.1.2 THIS STANDARD COVERS INSTALLATION, MAINTENANCE, | | OPERATION, | | AND TESTING REQUIREMENTS AS THEY PERTAIN TO THE | | PERFORMANCE | | OF THE EMERGENCY POWER SUPPLY SYSTEM (EPSS). | | | | 7.10 EXHAUST SYSTEM. | | 7.10.1 THE EXHAUST SYSTEM EQUIPMENT AND INSTALLATION, | | INCLUDING | | PIPING, MUFFLER, AND RELATED ACCESSORIES, SHALL BE IN | | ACCORDANCE WITH NFPA37, STANDARD FOR THE INSTALLATION | | AND USE OF | | STATIONARY COMBUSTION ENGINES AND GAS TURBINES, AND | | OTHER APPLICABLE | | STANDARDS. | | 7.10.2 EXHAUST SYSTEM INSTALLATION SHALL BE GASTIGHT TO | | PREVENT | | EXHAUST GAS FUMES FROM ENTERING INHABITED ROOMS OR | | BUILDINGS | | AND TERMINATE IN SUCH A MANNER THAT TOXIC FUMES CANNOT | | REENTER A BUILDING OR STRUCTURE, PARTICULARLY THROUGH | | WINDOWS, | | AIR VENTILATION INLETS, OR THE ENGINE AIR-INTAKE | | SYSTEM. | | 7.10.3* EXHAUST PIPING SHALL BE CONNECTED TO THE PRIME | | MOVER | | BY MEANS OF A FLEXIBLE CONNECTOR AND SHALL BE | | INDEPENDENTLY | | SUPPORTED THEREAFTER SO THAT NO DAMAGING WEIGHT OR | | STRESS IS | | APPLIED TO THE ENGINE EXHAUST MANIFOLD OR TURBOCHARGER. | | 7.10.3.1 A CONDENSATE TRAP AND DRAIN VALVE SHALL BE | | PROVIDED | | AT THE LOW POINT(S) OF THE PIPING UNLESS THE PIPING IS | | SELFDRAINING. | | | | NFPA 37 | | | | 8.3 CLEARANCE FROM EXHAUST SYSTEMS WITH EXHAUST GAS | | TEMPERATURES | | OF LESS THAN 760?C (1400?F). | | 8.3.1 EXHAUST PIPES AND DUCTS SHALL HAVE CLEARANCES OF | | AT LEAST | | 225 MM (9 IN.) TO ADJACENT COMBUSTIBLE MATERIALS, | | EXCEPT AS | | SPECIFIED IN 8.3.2 AND 8.3.3. THE CLEARANCE SHALL BE | | MEASURED | | FROM THE OUTSIDE SURFACE OF THE EXHAUST PIPE OR DUCT | | AND NOT | | FROM ANY INSULATION THAT MIGHT BE PRESENT. | | 8.3.2 EXHAUST PIPES AND DUCTS PASSING DIRECTLY THROUGH | | COMBUSTIBLE | | ROOFS SHALL BE GUARDED AT THE POINT OF PASSAGE BY | | VENTILATED | | METAL THIMBLES THAT EXTEND NOT LESS THAN 225MM(9 IN.) | | ON EACH SIDE (ABOVE AND BELOW) OF ROOF CONSTRUCTION AND | | ARE | | AT LEAST 150 MM (6 IN.) IN DIAMETER LARGER THAN THE | | EXHAUST | | PIPE OR DUCT. | | 8.3.3 EXHAUST PIPES AND DUCTS PASSING DIRECTLY THROUGH | | COMBUSTIBLE | | WALLS OR PARTITIONS SHALL BE GUARDED AT THE POINT OF | | PASSAGE BY ONE OF THE FOLLOWING METHODS: | | | | (1) METAL VENTILATED THIMBLES NOT LESS THAN 300 MM (12 | | IN.) | | LARGER IN DIAMETER THAN THE EXHAUST PIPE OR DUCT | | (2) METAL OR BURNED FIRE CLAY THIMBLES CONSTRUCTED OF | | BRICKWORK | | OR OTHER APPROVED FIREPROOFING MATERIALS PROVIDING | | NOT LESS THAN 200 MM (8 IN.) OF INSULATION BETWEEN THE | | THIMBLE AND COMBUSTIBLE MATERIAL | | | | PLEASE REVIEW AND PROVIDE DETAILS. | | | | | | | | | | 2) THERE ARE INDICATIONS OF A FUEL TANK; HOWEVER, THERE | | ARE NO INDICATIONS OF FUEL LINE LOCATIONS AND/OR IF | | THEY BREACH FIRE RATED WALLS. | | | | PLEASE PROVIDE DETAILS. | | | | | | | | 2A) THERE IS AN INDICATION OF A FUEL TANK; HOWEVER, | | THERE ARE NO INDICATIONS OF THE CLEARANCE DIMENSIONS | | AROUND THE TANK. | | | | PER NFPA 110 | | | | 7.9.12.1 A MINIMUM CLEARANCE OF 0.9 M (36 IN.) SHALL BE | | MAINTAINED ON ALL SIDES. | | | | PLEASE PROVIDE DETAILS. | | | | | | | | 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | ABOVE. | | | | | | | | 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | RE-SUBMITTAL OF THE ABOVE. | | | | | | | | PETER LEDUC | | FIRE MARSHAL | | 561-804-4709 | | [email protected] |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
F |
Date |
2020-11-18 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2020-11-18 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2020-11-18 |
Time |
16:02 |
Sent To |
|
|
Notes |
2020-11-18 16:24:04 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | 1) THERE NO INDICATIONS OF EXHAUST PIPING/TUBING | | | | PER NFPA 110 | | | | CHAPTER 1 ADMINISTRATION | | 1.1 SCOPE. THIS STANDARD CONTAINS REQUIREMENTS COVERING | | THE | | PERFORMANCE OF EMERGENCY AND STANDBY POWER SYSTEMS | | PROVIDING | | AN ALTERNATE SOURCE OF ELECTRICAL POWER TO LOADS IN | | BUILDINGS | | AND FACILITIES IN THE EVENT THAT THE PRIMARY POWER | | SOURCE | | FAILS. | | 1.1.1 POWER SYSTEMS COVERED IN THIS STANDARD INCLUDE | | POWER | | SOURCES, TRANSFER EQUIPMENT, CONTROLS, SUPERVISORY | | EQUIPMENT, | | AND ALL RELATED ELECTRICAL AND MECHANICAL AUXILIARY AND | | ACCESSORY | | EQUIPMENT NEEDED TO SUPPLY ELECTRICAL POWER TO THE LOAD | | TERMINALS OF THE TRANSFER EQUIPMENT. | | 1.1.2 THIS STANDARD COVERS INSTALLATION, MAINTENANCE, | | OPERATION, | | AND TESTING REQUIREMENTS AS THEY PERTAIN TO THE | | PERFORMANCE | | OF THE EMERGENCY POWER SUPPLY SYSTEM (EPSS). | | | | 7.10 EXHAUST SYSTEM. | | 7.10.1 THE EXHAUST SYSTEM EQUIPMENT AND INSTALLATION, | | INCLUDING | | PIPING, MUFFLER, AND RELATED ACCESSORIES, SHALL BE IN | | ACCORDANCE WITH NFPA37, STANDARD FOR THE INSTALLATION | | AND USE OF | | STATIONARY COMBUSTION ENGINES AND GAS TURBINES, AND | | OTHER APPLICABLE | | STANDARDS. | | 7.10.2 EXHAUST SYSTEM INSTALLATION SHALL BE GASTIGHT TO | | PREVENT | | EXHAUST GAS FUMES FROM ENTERING INHABITED ROOMS OR | | BUILDINGS | | AND TERMINATE IN SUCH A MANNER THAT TOXIC FUMES CANNOT | | REENTER A BUILDING OR STRUCTURE, PARTICULARLY THROUGH | | WINDOWS, | | AIR VENTILATION INLETS, OR THE ENGINE AIR-INTAKE | | SYSTEM. | | 7.10.3* EXHAUST PIPING SHALL BE CONNECTED TO THE PRIME | | MOVER | | BY MEANS OF A FLEXIBLE CONNECTOR AND SHALL BE | | INDEPENDENTLY | | SUPPORTED THEREAFTER SO THAT NO DAMAGING WEIGHT OR | | STRESS IS | | APPLIED TO THE ENGINE EXHAUST MANIFOLD OR TURBOCHARGER. | | 7.10.3.1 A CONDENSATE TRAP AND DRAIN VALVE SHALL BE | | PROVIDED | | AT THE LOW POINT(S) OF THE PIPING UNLESS THE PIPING IS | | SELFDRAINING. | | | | NFPA 37 | | | | 8.3 CLEARANCE FROM EXHAUST SYSTEMS WITH EXHAUST GAS | | TEMPERATURES | | OF LESS THAN 760?C (1400?F). | | 8.3.1 EXHAUST PIPES AND DUCTS SHALL HAVE CLEARANCES OF | | AT LEAST | | 225 MM (9 IN.) TO ADJACENT COMBUSTIBLE MATERIALS, | | EXCEPT AS | | SPECIFIED IN 8.3.2 AND 8.3.3. THE CLEARANCE SHALL BE | | MEASURED | | FROM THE OUTSIDE SURFACE OF THE EXHAUST PIPE OR DUCT | | AND NOT | | FROM ANY INSULATION THAT MIGHT BE PRESENT. | | 8.3.2 EXHAUST PIPES AND DUCTS PASSING DIRECTLY THROUGH | | COMBUSTIBLE | | ROOFS SHALL BE GUARDED AT THE POINT OF PASSAGE BY | | VENTILATED | | METAL THIMBLES THAT EXTEND NOT LESS THAN 225MM(9 IN.) | | ON EACH SIDE (ABOVE AND BELOW) OF ROOF CONSTRUCTION AND | | ARE | | AT LEAST 150 MM (6 IN.) IN DIAMETER LARGER THAN THE | | EXHAUST | | PIPE OR DUCT. | | 8.3.3 EXHAUST PIPES AND DUCTS PASSING DIRECTLY THROUGH | | COMBUSTIBLE | | WALLS OR PARTITIONS SHALL BE GUARDED AT THE POINT OF | | PASSAGE BY ONE OF THE FOLLOWING METHODS: | | | | (1) METAL VENTILATED THIMBLES NOT LESS THAN 300 MM (12 | | IN.) | | LARGER IN DIAMETER THAN THE EXHAUST PIPE OR DUCT | | (2) METAL OR BURNED FIRE CLAY THIMBLES CONSTRUCTED OF | | BRICKWORK | | OR OTHER APPROVED FIREPROOFING MATERIALS PROVIDING | | NOT LESS THAN 200 MM (8 IN.) OF INSULATION BETWEEN THE | | THIMBLE AND COMBUSTIBLE MATERIAL | | | | PLEASE REVIEW AND PROVIDE DETAILS. | | | | | | | | | | 2) THERE ARE INDICATIONS OF A FUEL TANK; HOWEVER, THERE | | ARE NO INDICATIONS OF FUEL LINE LOCATIONS AND/OR IF | | THEY BREACH FIRE RATED WALLS. | | | | PLEASE PROVIDE DETAILS. | | | | | | | | 2A) THERE IS AN INDICATION OF A FUEL TANK; HOWEVER, | | THERE ARE NO INDICATIONS OF THE CLEARANCE DIMENSIONS | | AROUND THE TANK. | | | | PER NFPA 110 | | | | 7.9.12.1 A MINIMUM CLEARANCE OF 0.9 M (36 IN.) SHALL BE | | MAINTAINED ON ALL SIDES. | | | | PLEASE PROVIDE DETAILS. | | | | | | | | 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | ABOVE. | | | | | | | | 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | RE-SUBMITTAL OF THE ABOVE. | | | | | | | | PETER LEDUC | | FIRE MARSHAL | | 561-804-4709 | | [email protected] | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2021-02-23 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2021-02-23 |
Time |
07:19 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2021-02-19 |
Time |
14:39 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2021-02-10 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2021-02-10 |
Time |
16:36 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2021-02-01 |
Time |
20:06 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2021-01-14 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2021-01-14 |
Time |
09:28 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2021-01-04 |
Time |
13:24 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2020-12-07 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-12-07 |
Time |
14:26 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-11-17 |
Time |
11:34 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
4 |
Status |
P |
Date |
2021-02-23 |
|
|
Cont ID |
|
Sent By |
hmoser |
Date |
2021-02-23 |
Time |
06:57 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2021-02-23 |
Time |
05:51 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
F |
Date |
2021-02-04 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2021-02-04 |
Time |
11:17 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2021-02-04 |
Time |
10:02 |
Sent To |
|
|
Notes |
2021-02-04 11:18:32 | 1ST REVIEW FBC-2020 MECHANICAL | | PERMIT-20050306 | | | | CODES IN EFFECT: | | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2020 | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2020 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | 2020 | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2020 | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION | | 2020 | | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH | | EDITION 2020 | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | EDITION 2020 | | | | PLAN REVIEW RESULTS: DENIED. | | | | 1) PLEASE SHOW THE GENERATOR INSIDE THE GENERATOR ROOM, | | PLEASE SHOW THE EXHAUST FROM THE GENERATOR AND THE WALL | | IT IS EXHAUSTING OUT OF. FBC 107.2.1 | | | | 2) PLEASE PROVIDE A DETAILED DRAWING SHOWING THE FUEL | | PIPING SYSTEM INCLUDING FROM TANK TO GENERATOR. ALSO | | SHOW THE FILL PIPING LOCATION ALONG WITH THE VENT | | PIPING AND TERMINATION LOCATION. FBC M 1305.6, 1305.7 | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD | | SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER | | SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN | | THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS | | PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS | | PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR | | UPDATED. | | | | MICHAEL EDWARDS | | MECHANICAL EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL. 33401 | | 561-805-6728 | | [email protected] | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
F |
Date |
2021-01-11 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2021-01-11 |
Time |
13:36 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2021-01-11 |
Time |
12:44 |
Sent To |
|
|
Notes |
2021-01-11 13:37:30 | PLEASE SEE FIRE REVIEWERS COMMENTS. ME |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2020-11-24 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2020-11-24 |
Time |
07:21 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2020-11-24 |
Time |
07:18 |
Sent To |
|
|
Notes |
2020-11-24 07:21:25 | 1ST REVIEW FBC-2017 MECHANICAL | | PERMIT-20050306 | | | | CODES IN EFFECT: | | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | 2017 | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION | | 2017 | | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH | | EDITION 2017 | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | EDITION 2017 | | | | PLAN REVIEW RESULTS: DENIED. | | | | 1) PLEASE PROVIDE A DETAIL DRAWING OF THE GENERATOR | | ROOM WITH THE EXHAUST DETAILS FOR THIS GENERATOR AND | | THE VENTILATION DETAILS OF THIS GENERATOR ROOM. FBC | | 107.2 | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD | | SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER | | SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN | | THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS | | PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS | | PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR | | UPDATED. | | | | MICHAEL EDWARDS | | MECHANICAL EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL. 33401 | | 561-805-6728 | | [email protected] | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
4 |
Status |
P |
Date |
2021-02-23 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2021-02-23 |
Time |
07:16 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2021-02-23 |
Time |
07:16 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
F |
Date |
2021-02-04 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2021-02-04 |
Time |
11:20 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2021-02-04 |
Time |
11:20 |
Sent To |
|
|
Notes |
2021-02-04 11:23:13 | PLEASE PROVIDE DIGITALLY SIGNED SEALED AND THIRD PARTY | | CERTIFIED DIGITAL DRAWINGS FROM THE ENGINEER. DRAWINGS | | CREATED BY COMPANY'S MUST HAVE A TITLE BLOCK WITH THE | | DESIGNERS NAME AND SIGNATURE INCLUDED IN THE TITLE | | BLOCK. | | | | PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF PLAN | | (INCLUDING THE SUPPORTING DOCUMENTS) IS REQUIRED TO BE | | SIGNED AND SEALED BY THE PERSON RESPONSIBLE FOR THE | | DESIGN. A DIGITAL PLAN REQUIRES A DIGITAL SIGNATURE | | WITH THE PROPER THIRD PARTY VERIFICATION. PROVIDE | | CORRECTION. ALTERNATIVELY, A SIGNED/SEALED PAPER SET | | MAY BE SUPPLIED TO THE BUILDING DEPARTMENT WHEN ALL | | TRADES ARE APPROVED. WPB FBC 107.1; FS 471/481 | | | | MICHAEL EDWARDS | | MECHANICAL EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL. 33401 | | 561-805-6728 | | [email protected] | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2021-01-11 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2021-01-11 |
Time |
13:46 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2021-01-11 |
Time |
13:45 |
Sent To |
|
|
Notes |
2021-01-11 13:47:28 | PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF PLAN | | (INCLUDING THE SUPPORTING DOCUMENTS) IS REQUIRED TO BE | | SIGNED AND SEALED BY THE PERSON RESPONSIBLE FOR THE | | DESIGN. A DIGITAL PLAN REQUIRES A DIGITAL SIGNATURE | | WITH THE PROPER THIRD PARTY VERIFICATION. PROVIDE | | CORRECTION. ALTERNATIVELY, A SIGNED/SEALED PAPER SET | | MAY BE SUPPLIED TO THE BUILDING DEPARTMENT WHEN ALL | | TRADES ARE APPROVED. WPB FBC 107.1; FS 471/481 | | | | 61G15?23.004 F.A.C. | | (2) A PROFESSIONAL ENGINEER UTILIZING A DIGITAL | | SIGNATURE TO ELECTRONICALLY SIGN AND SEAL ENGINEERING | | PLANS, SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS SHALL | | HAVE THEIR IDENTITY AUTHENTICATED BY A CERTIFICATION | | AUTHORITY AND SHALL ASSURE THAT THE DIGITAL SIGNATURE | | IS: (A) UNIQUE TO THE PERSON USING IT; (B) CAPABLE OF | | VERIFICATION; AS OF NOVEMBER 16, 2020 63 (C) UNDER THE | | SOLE CONTROL OF THE PERSON USING IT; AND, (D) LINKED TO | | A DOCUMENT IN SUCH A MANNER THAT THE DIGITAL SIGNATURE | | AND CORRESPONDINGLY THE DOCUMENT IS INVALIDATED IF ANY | | DATA IN THE DOCUMENT IS CHANGED. | | | | MICHAEL EDWARDS | | MECHANICAL EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL. 33401 | | 561-805-6728 | | [email protected] | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
N |
Date |
2020-11-30 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-11-30 |
Time |
10:22 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-11-30 |
Time |
10:22 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2020-12-03 |
|
|
Cont ID |
|
Sent By |
aaponte |
Date |
2020-12-03 |
Time |
09:03 |
Rev Time |
0.00 |
Received By |
aaponte |
Date |
2020-12-03 |
Time |
09:03 |
Sent To |
|
|
Notes |
|
|