Plan Review Stops For Permit 20050210 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
N |
Date |
2020-05-15 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2020-05-15 |
Time |
06:46 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2020-05-15 |
Time |
06:13 |
Sent To |
|
|
Notes |
2020-05-15 06:47:49 | PETER E VALENTI | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6673 | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | FBC R = FBC RESIDENTIAL | | FBC M = FBC MECHANICAL | | | | NO BUILDING SUBMITTED FOR REVIEW |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
N |
Date |
2020-05-13 |
|
|
Cont ID |
|
Sent By |
jpearson |
Date |
2020-05-13 |
Time |
09:24 |
Rev Time |
0.00 |
Received By |
jpearson |
Date |
2020-05-13 |
Time |
09:02 |
Sent To |
|
|
Notes |
2020-05-13 09:24:06 | NO ELECTRICAL SUBMITTED FOR REVIEW. |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
P |
Date |
2020-05-20 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2020-05-20 |
Time |
09:52 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2020-05-20 |
Time |
09:36 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
F |
Date |
2020-05-18 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2020-05-18 |
Time |
08:18 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2020-05-18 |
Time |
07:30 |
Sent To |
|
|
Notes |
2020-05-18 08:18:22 | 1) SHOW THE LOCATION OF ALL THE REGULATORS ON THE GAS | | DRAWING. | | 2) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE GAS | | REGULATORS. RREGULATORS INSTALLED ON THE EXTERIOR OF | | BUILDINGS SHALL BE APPROVED FOR OUTDOOR INSTALLATION. | | FBC-FUEL GAS SEC.410.1. | | 3 ) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / | | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY | | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND | | FBC-2017 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2017 | | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED | | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS | | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF | | INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1. | | 4) SHOW THE DISTANCE FROM EACH REGULATOR TO THE | | APPLIANCE AND SIZE EACH LINE FROM THE REGULATOR TO THE | | APPLIANCE. | | 5) SUBMIT A FLOOR PLAN THAT SHOWS THE DISTANCE OF THE | | TANKLESS WATER HEATERS TO ALL OPERABLE DOORS, WINDOWS | | AND OTHER BUILDING OPENINGS. THE LOCATION OF THE | | TANKLESS WATER HEATERS SHALL COMPLY WITH THE | | MANUFACTURER'S INSTALLATION MANUAL. | | 6) NOTE ON THE GAS RISER WHAT SIZING TABLES ARE BEING | | USED FOR THE DESIGN OF THE LOW PRESSURE SYSTEM FOR THE | | CSST AND SCH. 40 PIPE. | | | | NOTE: ACCORDING TO CITY RECORDS, A GAS PLAN REVIEW WAS | | NEVER DONE ON THE MASTER PERMIT AS THERE WAS NO GAS | | DRAWING SUBMITTED. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | | | | | | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2020-05-20 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2020-05-20 |
Time |
09:53 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2020-05-19 |
Time |
10:18 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2020-05-18 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2020-05-18 |
Time |
08:19 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2020-05-07 |
Time |
15:15 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
P |
Date |
2020-05-13 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2020-05-08 |
Time |
12:16 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2020-05-13 |
Time |
10:21 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
N |
Date |
2020-05-20 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2020-05-20 |
Time |
09:53 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2020-05-20 |
Time |
09:53 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
N |
Date |
2020-05-18 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2020-05-18 |
Time |
08:18 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2020-05-18 |
Time |
08:18 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
N |
Date |
2020-05-20 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2020-05-20 |
Time |
09:53 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2020-05-20 |
Time |
09:53 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2020-05-15 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2020-05-15 |
Time |
06:48 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2020-05-15 |
Time |
06:13 |
Sent To |
|
|
Notes |
2020-05-15 08:00:16 | PETER E VALENTI | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6673 | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | FBC R = FBC RESIDENTIAL | | FBC M = FBC MECHANICAL | | | | SIGNATURE REVIEW APPROVED: | | | | THE CONTRACTOR PROVIDED SIGNED AND SEALED DRAWINGS. THE | | SIGNED/SEALED DRAWING WAS SENT TO SCANNING. | | | | | | | | |
|
|