Plan Review Details - Permit 20040372
Plan Review Stops For Permit 20040372
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-04-14 Cont ID  
Sent By rmcdouga Date 2020-04-14 Time 12:52 Rev Time 0.00
Received By rmcdouga Date 2020-04-14 Time 11:53 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-04-10 Cont ID  
Sent By jpearson Date 2020-04-10 Time 14:40 Rev Time 0.00
Received By jpearson Date 2020-04-10 Time 08:39 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2020-04-13 Cont ID  
Sent By pleduc Date 2020-04-13 Time   Rev Time  
Received By fstal Date 2020-04-13 Time   Sent To  
Notes
2020-04-13 15:16:50FIRE PROTECTION CONTRACTORS SHALL SUBMIT SHOP DRAWNING
 FRO APPROVAL TO BUILDING DEPARTMENT.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date 2020-05-27 Time   Rev Time 0.00
Received By lmarchan Date 2020-05-08 Time 16:02 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-04-14 Cont ID  
Sent By rmcdouga Date 2020-04-14 Time 12:53 Rev Time 0.00
Received By rmcdouga Date 2020-04-09 Time 08:50 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2020-05-20 Cont ID  
Sent By medwards Date 2020-05-20 Time 10:15 Rev Time 0.00
Received By medwards Date 2020-05-20 Time 10:54 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2020-04-10 Cont ID  
Sent By ccole Date 2020-04-10 Time 11:37 Rev Time 0.00
Received By ccole Date 2020-04-10 Time 07:37 Sent To  
Notes
2020-04-10 11:46:101ST REVIEW FBC-2017 MECHANICAL
 PERMIT #19090403
 REVISION #20040372
 4/10/20
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SHEETS M4, M6, M7, M8: SHOW THE LOCATIONS OF THE VAV
 TERMINAL BOX THERMOSTATS- SECTION C403.2.4.1 FBC EC.
  
 2) M6: PROVIDE VENTILATION CALCULATIONS FOR THE NEW
 STORAGE ROOM- TABLE 403.3.1.1. FBC M. PLEASE INDICATE
 THE USE OF THE ROOM AND WHAT MATERIALS WILL BE STORED
 IN THE ROOM- SECTION 107.2.1 WPB.
  
 3) M8 & M11: INDICATE HOW THE UNDERGROUND CHILLER
 PIPING WILL BE PROTECTED- SECTION 1202.4, AND SUBMIT
 PIPE SPECIFICATIONS- TABLE 1202.4 FBC M.
  
 4) M8 & M11: PROVIDE THE TYPE AND THICKNESS OF
 UNDERGROEUND AND ABOVE GROUND CHILLER PIPING
 INSULATION- SECTION AND TABLE C403.2.10 FBC EC.
 INDICATE HOW THE INSULATION WILL BE PROTECTED- SECTION
 C403.2.10.1 FBC EC.
  
 5) M8: THERE IS A NOTE ON THE PLAN REFERENCING M10
 WHICH WAS NOT UPLOADED FOR REVIEW. PLEASE PROVIDE THE
 REVISED SHEET- SECTION 107.2.1 WPB.
  
 6) THE NEW STORAGE ROOM AND UNDERGROUND CHILLER PIPING
 CONSITUTE AN INCREASE IN VALUE FOR THE PROJECT. PLEASE
 SUBMIT AN ITEMIZED BREAKDOWN OF ALL COSTS ASSOCIATED
 WITH THIS REVISION INCLUDING LABOR, MATERIALS,
 EQUIPMENT, APPPLIANCES, DESIGN FEES, SITE WORK ETC-
 SECTION 109.3 WPB..
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop P PLUMBING
Rev No 2 Status P Date 2020-05-27 Cont ID  
Sent By ccole Date 2020-05-27 Time 10:44 Rev Time 0.00
Received By ccole Date 2020-05-27 Time 08:56 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-04-14 Cont ID  
Sent By shill Date 2020-04-14 Time 05:41 Rev Time 0.00
Received By tklarge Date 2020-04-13 Time 11:13 Sent To  
Notes
2020-04-14 05:34:261) SHT. P-5 - SHOW THE TYPE OF PIPE AND JOINTS TO BE
 INSTALLED FOR THE 3-INCH WATER LINE. WPB AMEND. TO FBC
 SEC. 107.2.1.
 2) A REDUCED PRESSURE BACKFLOW PREVENTION DEVICE IS
 REQUIRED ON THE 3-INCH WATER CONNECTION TO THE CHILLED
 WATER SYSTEM PER THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL.
 3) CLEARLY SHOW THE CONNECTION AND LOCATION POINT OF
 THE 3-INCH DOMESTIC WATER LINE TO THE CHILLED WATER
 SYSTEM.WPB AMEND. TO FBC SEC. 107.2.1.
 4) A SEPARATE PERMIT WILL BE REQUIRED FOR THE BACKFLOW
 DEVICE THAT IS REQUIRED ON THE 3-INCH DOMESTIC WATER
 LINE CONNECTION.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-05-20 Cont ID  
Sent By medwards Date 2020-05-20 Time 11:07 Rev Time 0.00
Received By medwards Date 2020-05-20 Time 10:59 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-04-10 Cont ID  
Sent By jpearson Date 2020-04-10 Time 13:13 Rev Time 0.00
Received By jpearson Date 2020-04-10 Time 13:12 Sent To  
Notes
2020-04-10 13:14:28ALL SHEETS THIS REVIEW CYCLE ARE GOOD. ANY SHEETS
 SUBMITTED FOR CORRECTION WILL NEED TO BE CHECKED. WPB
 FBC 105.1


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved