Plan Review Details - Permit 20040366
Plan Review Stops For Permit 20040366 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
N |
Date |
2020-05-15 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-05-15 |
Time |
08:46 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-05-15 |
Time |
08:46 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2020-04-15 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-04-15 |
Time |
16:25 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-04-15 |
Time |
15:21 |
Sent To |
|
|
Notes |
2020-04-15 16:24:47 | REPLACING AND ADDING BOILERS | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected]. | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | | 1) PLEASE SHOW THE EXISTING HOURLY FIRE RATING FOR THE | | WALLS. | | 2) PLEASE SHOW IF THE BUILDING HAS EXISTING FIRE | | SPRINKLERS. | | 3) PLEASE SHOW PENETRATIONS THRU FIRE RATED WALLS TO | | COMPLY WITH FBC 714 | | FBC EXISTING BUILDING 703.1GENERAL. | | ALTERATIONS SHALL BE DONE IN A MANNER THAT MAINTAINS | | THE LEVEL OF FIRE PROTECTION PROVIDED. | | PLANS DO NOT SHOW ANY NEW WALLS. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2020-06-15 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-06-15 |
Time |
11:07 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-06-15 |
Time |
11:07 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2020-05-14 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-05-14 |
Time |
08:46 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-05-14 |
Time |
08:46 |
Sent To |
|
|
Notes |
2020-05-14 08:47:33 | VALUE FOR THE WORK IS STILL SHOWN AS $400,000 | | | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2020-04-20 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-04-20 |
Time |
13:55 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-04-20 |
Time |
13:55 |
Sent To |
|
|
Notes |
2020-04-20 13:59:34 | FLORIDA BUILDING CODE 2017 6TH EDITION | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | NFPA 70 2014 EDITION | | | | JAKE LEAHY BN, BU, PX | | ELECTRICAL PLANS EXAMINER II | | 561-805-6713 | | [email protected] | | | | 1) VALUE FOR THE AMOUNT OF WORK SHOWN SEEMS LOW, PLEASE | | SUBMIT A SIGNED CONTRACT WITH THE OWNERS SIGNATURE. | | (400,000) | | | | FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING | | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE | | TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, | | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, | | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, | | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY | | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST | | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS | | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY | | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT | | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. | | | | 2) AIC RATING FOR DOWN STREAM FROM TRANSFORMER REQUIRED | | AND LABELING. | | | | PROVIDE CALCULATION FOR AVAILABLE SHORT CIRCUIT CURRENT | | AT NEW PANEL TO CONFIRM AIC RATING IS ADEQUATE. NEC | | 110.10 | | | | |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2020-05-06 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2020-05-06 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2020-05-06 |
Time |
16:38 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
F |
Date |
2020-04-10 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2020-04-10 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2020-04-10 |
Time |
14:23 |
Sent To |
|
|
Notes |
2020-04-10 14:34:47 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | | | 1) THERE IS NO CLEAR SCOPE OF WORK. THE COVER PAGE | | INDICATES BOILER UPGRADE. | | | | WITH MULTIPLE DEMO PLAN SHEETS, PLEASE PROVIDE A SCOPE | | OF WORK FOR CLRIFICATION PURPOSES. | | | | PLEASE INCLUDE WHAT IS/WILL BE EXISTING AND WHAT | | IS/WILL BE NEW. | | | | | | | | 2) THERE IS NO INDICATIONS OF COMPLIANCE WITH ANY LIFE | | SAFETY CODE. | | | | THE PROPOSED SHALL COMPLY WITH THE FLORIDA FIRE | | PREVENTION CODE, 6TH ED AND ALL APPLICABLE, INCLUDING, | | BUT NOT LIMITED TO, NFPA 85 | | BOILER AND COMBUSTION SYSTEMS HAZARDS CODE, 2015 | | EDITION. | | | | WITH NOT FULLY KNOWING THE SCOPE AND PER # 1 ABOVE, IT | | IS UNCLEAR IF THERE IS COMPLIANCE WITH NFPA. | | | | PLEASE REVIEW AND ENSURE COMPLIANCE AND PROVIDE AN | | APPLICABLE NOTE OF ACKNOWLEDGEMENT. | | | | | | | | 3) THERE ARE NO SPEC/EQUIPMENT SHEETS PROVIDED. | | | | PLEASE REVIEW AND PROVIDE AS APPLICABLE FOR REVIEW AND | | CONFIRMATION WITH # 1 & 2 ABOVE. | | | | | | | | 4) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | ABOVE. | | | | | | 5) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | RE-SUBMITTAL OF THE ABOVE. | | | | PETER LEDUC | | FIRE MARSHAL | | 561-804-4709 | | [email protected] | | | | | | | | | | | | | | CHAPTER 1 ADMINISTRATION | | 1.1* SCOPE. THIS CODE APPLIES TO THE FOLLOWING: | | (1) SINGLE BURNER BOILERS, MULTIPLE BURNER BOILERS, | | STOKERS, | | AND ATMOSPHERIC FLUIDIZED BED BOILERS WITH A FUEL INPUT | | RATING OF 3.7 MWT (12.5 MILLION BTU/HR) OR GREATER | | (2) PULVERIZED FUEL SYSTEMS AT ANY HEAT INPUT RATE | | (3) FIRED OR UNFIRED STEAM GENERATORS USED TO RECOVER | | HEAT | | FROM COMBUSTION TURBINES [HEAT RECOVERY STEAM | | GENERATORS | | (HRSGS)] AND OTHER COMBUSTION TURBINE EXHAUST SYSTEMS | | AT ANY HEAT INPUT RATE | | 1.1.1 THIS CODE COVERS DESIGN, INSTALLATION, OPERATION, | | MAINTENANCE, | | AND TRAINING. |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
3 |
Status |
P |
Date |
2020-06-11 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-06-11 |
Time |
10:56 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-06-11 |
Time |
07:00 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
F |
Date |
2020-05-14 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-05-14 |
Time |
16:34 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-05-14 |
Time |
16:34 |
Sent To |
|
|
Notes |
2020-05-14 16:36:42 | 2ND REVIEW FBC-2017 FUEL GAS | | PERMIT #20040366 | | 5/14/2020 | | | | CODES IN EFFECT: | | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | 2017 | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION | | 2017 | | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | EDITION 2017 | | | | PLAN REVIEW RESULTS: DENIED | | BASED ON THE RESUMBITTED PLANS AND THE NARRATIVE | | RESPONSES BY THE ENGINEER OF RECORD, THE 1ST REVIEW | | COMMENTS LISTED BELOW WILL BE MARKED AS PASSED OR | | FAILED. | | | | 1) FAILED. GAS DRAWING DOES NOT SHOW TOTAL DEVELOPED | | LENGTH OF THE SYSTEM, TYPE OF PIPINGS, TOTAL BTUH GAS | | LOAD OF THE SYSTEM, CUT LENGTHS OF PIPINGS, DELIVERY | | PRESSURES AT THE METER AND AT REGULATORS, GAS PIPE | | SIZING TABLES, LOCATIONS OF DRIP LEGS, UNIONS. PROVIDE | | A GAS ISOMETRIC DRAWING THAT SHOWS THE TYPE AND | | DIAMETERS OF PIPING, THE MEASUREMENTS OF EACH CUT | | LENGTH OF PIPE, THE TOTAL DEVELOPED LENGTH OF THE | | PIPING RUN FROM THE POINT OF DELIVERY AT THE METER TO | | THE MOST REMOTE OUTLET IN THE BUILDING AND TO THE | | BOILERS; GAS DELIVERY PRESSURE OF THE SYSTEM AT THE | | METER AND AT EACH STEPDOWN REGULATOR; LOCATIONS OF | | REQUIRED SHUTOFF VALVES, AND THE BTUH LOADS OF THE NEW | | BOILERS, AND ALL OTHER GAS-FIRED APPLIANCES AND | | EQUIPMENT BEING SERVED BY THE SYSTEM- SECTIONS 402.2 | | AND 402.3 FBC FG. PLEASE INDICATE WHICH PIPE SIZING | | TABLES WERE USED IN THE DESIGN- SECTION 402.3. | | A) FAILED. CONCERNING THE REGULATORS PLEASE REFER TO | | SECTIONS 410.1, 410.2, & 410.3 FBC FG FOR LINE AND MP | | REGULATOR INSTALLATION AND VENTING REQUIREMENTS. PLEASE | | VERIFY SUBMITTALS ARE COMPLIANT AND SHOW ALL REGULATOR | | AND SHUTOFF VALVES IN THE ISOMETRIC DRAWING, AND | | REGULATOR VENT RUNS AND TERMINATION LOCATIONS WHERE | | REQUIRED. | | | | 2) PASSED-DEFERRED SUBMITTALS. PROVIDE A SUBMITTAL | | PACKAGE THAT INCLUDES MANUFACTURER'S SPECIFICATIONS AND | | INSTALLATION GUIDELINES FOR THE BOILERS, PUMPS, | | EXPANSION TANK, CONTROL VALVES, RELIEF VALVES, CHEMICAL | | FEEDER, CHEMICAL NEUTRALIZERS, VENT FLUE AND VENT CAP, | | COMBUSTION AIR DUCTS, GAS AND HYDRONIC PIPING, AND THE | | GAS REGULATORS AND SHUT OFF VALVES- SECTION 107.2.1 | | WPB. REVIEW ALL REQUIRED COMPLIANCES AND UL LISTINGS | | FOR THE PRODUCTS AS NOTED ON THE SPECIFICATIONS SHEETS | | M101, 102, & 103 AS THEY WILL BE CROSS CHECKED IN THE | | 2ND REVIEW. THE DESIGN PROFESSIONAL OF RECORD SHALL | | PROVIDE APPROVAL STAMPS ON EACH SUBMITTAL DOC, OR | | PROVIDE A STAMPED COVER PAGE WITH AN INDEX LISTING ALL | | PRODUCT SUBMITTALS. | | | | A) PASSED-DEFERRED SUBMITTALS. PLEASE NOTE THE GAS | | BOILER SPECIFICATIONS SHALL INDICATE THAT THE UNITS ARE | | LISTED IN ACCORDANCE WITH THE REQUIREMENTS OF ANSI | | Z21.13 OR UL 795, AND DESIGNED AND CONSTRUCTED IN | | ACCORDANCE WITH THE REQUIREMENTS OF ASME CSD-1 AND AS | | APPLICABLE, THE ASME BOILER AND PRESSURE VESSEL CODE, | | SECTIONS I, II, IV, V AND IX AND NFPA 85- SECTION 631.1 | | FBC FG AND SECTION 1004.1 FBC M | | | | 3) FAILED. REFER TO SECTIONS 406.4, THROUGH 406.6 FBC | | FG AND PROVIDE A GAS PIPING TESTING PROCEDURE ON THE | | PLAN. | | | | 4) MECH COMMENT #9) FAILED. A) THE VENT SIZING | | CALCULATIONS WERE NOT PROVIDED- SECTION 501.14 FBC FG. | | B) SHEETS M-301 & M-903 SHOW THE VENT FLUE FREESTANDING | | ABOVE THE ROOF. SHEET M-501 INDICATES THE VENT TO BE IN | | A CHIMNEY ENCLOSURE- WHICH IS IT? , IF THE VENT IS | | FREESTANDING, SHOW THE ACTUAL HEIGHT OF THE VENT FLUE | | ABOVE THE ROOF AND PROVIDE ENGINEERING FOR ANCHORING | | THE FLUE TO THE ROOF STRUCTURE TO RESIST WIND | | PRESSURES- SECTION 301.15- FBC M. C) INDICATE THE | | REQUIRED CLEARANCE FROM THE VENT PENETRATION TO THE | | COMBUSTIBLE ROOFING MATERIAL. D) PROVIDE A SUBMITTAL | | FOR THE VENT FLUES AND COMBUSTION AIR DUCTS OR REQUEST | | DEFERRED. PROVIDE A VENT FLUE DIAGRAM THAT SHOWS THE | | LENGTHS OF THE CONNECTORS, HORIZONTAL AND VERTICAL RUN | | LENGTHS, TOTAL RUN LENGTH OF THE SYSTEM, AND LOCATIONS | | OF OFFSETS, FITTINGS ETC. PER THE NOTES ON SHEET M102 | | THE PROPOSED SYSTEM REQUIRES ENGINEERED SIZING | | CALCULATIONS WHICH SHALL ACCOMPANY THE VENTING DIAGRAM- | | SEE SECTION 506.6.9.3 FBC FG. PLEASE INDICATE THE | | "VENTING APPLIANCE CATEGORY" - I, II, III, OR IV THAT | | THE SYSTEM IS BEING DESIGNED FOR, AND IF THE SYSTEM IS | | POSITIVE OR NEGATIVE AND PRODUCES CONDENSATION- SEE | | SECTION 202 FBC FG. CURRENTLY, A THOROUGH REVIEW OF THE | | SYSTEM CANNOT BE ACCOMPLISHED WITHOUT THE DIAGRAM, AND | | ADDITIONAL SPECIFICATIONS AND INFORMATION- SECTION | | 107.2.1 WPB. PLEASE REFER BACK TO COMMENT #1 FOR | | SUBMITTAL REQUIREMENTS AND REQUIRED UL LISTING AND | | LABELING. A) M502: REFER TO SECTION 503.8 FBC FG AND | | SHOW THE REQUIRED CLEARANCES FROM THE VENT FLUE | | TERMINATION TO MECHANICAL AND GRAVITY AIR INTAKES OR | | ANY OPERABLE OPENINGS INTO THE BUILDING. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | | | CHRISTOPHER L. COLE | | MECHANICAL/PLUMBING PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | | | |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
F |
Date |
2020-04-14 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-04-14 |
Time |
13:17 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-04-14 |
Time |
12:56 |
Sent To |
|
|
Notes |
2020-04-14 13:21:13 | 1ST REVIEW FBC-2017 FUEL GAS | | PERMIT #20040366 | | 4/142020 | | | | CODES IN EFFECT: | | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | 2017 | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION | | 2017 | | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | EDITION 2017 | | | | PLAN REVIEW RESULTS: DENIED. | | | | COMMENTS #1 & 2 LISTED BELOW ARE ALSO IN THE MECHANICAL | | REVIEW. PLEASE REFER TO MECHANICAL REVIEW COMMENTS FOR | | ADDITIONAL PLAN CORRECTIONS. | | | | 1) PROVIDE A GAS ISOMETRIC DRAWING THAT SHOWS THE TYPE | | AND DIAMETERS OF PIPING, THE MEASUREMENTS OF EACH CUT | | LENGTH OF PIPE, THE TOTAL DEVELOPED LENGTH OF THE | | PIPING RUN FROM THE POINT OF DELIVERY AT THE METER TO | | THE MOST REMOTE OUTLET IN THE BUILDING AND TO THE | | BOILERS; GAS DELIVERY PRESSURE OF THE SYSTEM AT THE | | METER AND AT EACH STEPDOWN REGULATOR; LOCATIONS OF | | REQUIRED SHUTOFF VALVES, AND THE BTUH LOADS OF THE NEW | | BOILERS, AND ALL OTHER GAS-FIRED APPLIANCES AND | | EQUIPMENT BEING SERVED BY THE SYSTEM- SECTIONS 402.2 | | AND 402.3 FBC FG. PLEASE INDICATE WHICH PIPE SIZING | | TABLES WERE USED IN THE DESIGN- SECTION 402.3. | | A) CONCERNING THE REGULATORS PLEASE REFER TO SECTIONS | | 410.1, 410.2, & 410.3 FBC FG FOR LINE AND MP REGULATOR | | INSTALLATION AND VENTING REQUIREMENTS. PLEASE VERIFY | | SUBMITTALS ARE COMPLIANT AND SHOW ALL REGULATOR AND | | SHUTOFF VALVES IN THE ISOMETRIC DRAWING, AND REGULATOR | | VENT RUNS AND TERMINATION LOCATIONS WHERE REQUIRED. | | | | 2) PROVIDE A SUBMITTAL PACKAGE THAT INCLUDES | | MANUFACTURER'S SPECIFICATIONS AND INSTALLATION | | GUIDELINES FOR THE BOILERS, PUMPS, EXPANSION TANK, | | CONTROL VALVES, RELIEF VALVES, CHEMICAL FEEDER, | | CHEMICAL NEUTRALIZERS, VENT FLUE AND VENT CAP, | | COMBUSTION AIR DUCTS, GAS AND HYDRONIC PIPING, AND THE | | GAS REGULATORS AND SHUT OFF VALVES- SECTION 107.2.1 | | WPB. REVIEW ALL REQUIRED COMPLIANCES AND UL LISTINGS | | FOR THE PRODUCTS AS NOTED ON THE SPECIFICATIONS SHEETS | | M101, 102, & 103 AS THEY WILL BE CROSS CHECKED IN THE | | 2ND REVIEW. THE DESIGN PROFESSIONAL OF RECORD SHALL | | PROVIDE APPROVAL STAMPS ON EACH SUBMITTAL DOC, OR | | PROVIDE A STAMPED COVER PAGE WITH AN INDEX LISTING ALL | | PRODUCT SUBMITTALS. | | | | A) PLEASE NOTE THE GAS BOILER SPECIFICATIONS SHALL | | INDICATE THAT THE UNITS ARE LISTED IN ACCORDANCE WITH | | THE REQUIREMENTS OF ANSI Z21.13 OR UL 795, AND DESIGNED | | AND CONSTRUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF | | ASME CSD-1 AND AS APPLICABLE, THE ASME BOILER AND | | PRESSURE VESSEL CODE, SECTIONS I, II, IV, V AND IX AND | | NFPA 85- SECTION 631.1 FBC FG AND SECTION 1004.1 FBC M | | | | 3) REFER TO SECTIONS 406.4, THROUGH 406.6 FBC FG AND | | PROVIDE A GAS PIPING TESTING PROCEDURE ON THE PLAN. | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | | | CHRISTOPHER L. COLE | | PLUMBING PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2020-06-15 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-06-15 |
Time |
11:08 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-06-08 |
Time |
13:53 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2020-05-15 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-05-15 |
Time |
08:57 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-05-05 |
Time |
11:19 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2020-04-20 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-04-20 |
Time |
14:15 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-04-09 |
Time |
13:38 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
P |
Date |
2020-06-11 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-06-11 |
Time |
10:55 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-06-11 |
Time |
06:59 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
F |
Date |
2020-05-14 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-05-14 |
Time |
16:21 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-05-14 |
Time |
13:38 |
Sent To |
|
|
Notes |
2020-05-14 16:23:27 | 2ND REVIEW FBC-2017 MECHANICAL | | PERMIT #20040366 | | 5/14/2020 | | | | CODES IN EFFECT: | | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | 2017 | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION | | 2017 | | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | EDITION 2017 | | | | PLAN REVIEW RESULTS: DENIED | | BASED ON THE RESUMBITTED PLANS AND THE NARRATIVE | | RESPONSES BY THE ENGINEER OF RECORD, THE 1ST REVIEW | | COMMENTS LISTED BELOW WILL BE MARKED AS PASSED OR | | FAILED. | | | | 1) PASSED- DEFERRED SUBMITTAL ACCEPTED. PROVIDE A | | SUBMITTAL PACKAGE THAT INCLUDES MANUFACTURER'S | | SPECIFICATIONS AND INSTALLATION GUIDELINES FOR THE | | BOILERS, PUMPS, EXPANSION TANK, CONTROL VALVES, RELIEF | | VALVES, CHEMICAL FEEDER, CHEMICAL NEUTRALIZERS, VENT | | FLUE AND VENT CAP, COMBUSTION AIR DUCTS, GAS AND | | HYDRONIC PIPING, AND THE GAS REGULATORS AND SHUT OFF | | VALVES- SECTION 107.2.1 WPB. REVIEW ALL REQUIRED | | COMPLIANCES AND UL LISTINGS FOR THE PRODUCTS AS NOTED | | ON THE SPECIFICATIONS SHEETS M101, 102, & 103 AS THEY | | WILL BE CROSS CHECKED IN THE 2ND REVIEW. THE DESIGN | | PROFESSIONAL OF RECORD SHALL PROVIDE APPROVAL STAMPS ON | | EACH SUBMITTAL DOC, OR PROVIDE A STAMPED COVER PAGE | | WITH AN INDEX LISTING ALL PRODUCT SUBMITTALS. | | A) PASSED- DEFERRED SUBMITTAL. PLEASE NOTE THE GAS | | BOILER SPECIFICATIONS SHALL INDICATE THAT THE UNITS ARE | | LISTED IN ACCORDANCE WITH THE REQUIREMENTS OF ANSI | | Z21.13 OR UL 795, AND DESIGNED AND CONSTRUCTED IN | | ACCORDANCE WITH THE REQUIREMENTS OF ASME CSD-1 AND AS | | APPLICABLE, THE ASME BOILER AND PRESSURE VESSEL CODE, | | SECTIONS I, II, IV, V AND IX AND NFPA 85- SECTION 631.1 | | FBC FG AND SECTION 1004.1 FBC M. | | B) PASSED- DEFERRED SUBMITTAL. COMMISSIONING OF THE | | BOILERS WILL REQUIRED AS NOTED UNDER ITEM 3.05 ON SHEET | | M103 WHICH LISTS THE AIR AND WATER TESTING AND | | BALANCING. COPIES OF THE TESTING REPORTS WILL BE | | REQUIRED FOR FINAL MECHANICAL APPROVAL- SECTION C408.2 | | FBC EC. | | C) PASSED- DEFERRED SUBMITTAL. THE BOILER | | SPECIFICATIONS SHALL INDICATE THAT THE UNITS HAVE BEEN | | TESTED OR WILL BE TESTED TO A MAXIMUM LEVEL OF 50 PPM | | OF CARBON MONOXIDE PER OSHA GUIDELINES- SECTION | | 1004.2.1 FBC M. | | | | 2) FAILED. SHEET M401: PROVIDE THE EFFICIENCY RATINGS | | OF THE BOILERS IN THE EQUIPMENT SCHEDULES- SEE TABLE | | 404,2 FBC EC. | | | | 3) PASSED- DEFERRED SUBMITTAL. M401: VERIFY THE BOILER | | SERVICE WATER SYSTEM WILL BE CAPABLE OF AUTOMATIC | | TEMPERATURE RESET AND AUTOMATIC VARIABLE FLUID FLOW- | | SEE SECTION C403.4.2.2 FBC EC. | | | | 4) PASSED- DEFERRED SUBMITTAL. M401: INDICATE THE | | BOILER TURNDOWN RATIO AS REQUIRED BY SECTION C403.4.2.5 | | FBC EC. | | | | 5) FAILED. WORKING CLEARANCES AT FRONTS, SIDES, REARS, | | AND IN BETWEEN THE BOILERS NOT PROVIDED. PLEASE PROVIDE | | FRONT AND TOP VIEW DRAWINGS OR DIAGRAMS OF THE BOILERS | | THAT SHOW A) REQUIRED WORKING CLEARANCES AS NOTED IN | | SECTIONS 1004.3 & 1004.3.1 FBC M. B) POTABLE WATER | | SUPPLY PIPING CONNECTION AND LOCATION OF BACKFLOW | | PREVENTERS AND SHUTOFF VALVES- SECTIONS 1005.1 & | | 1005.2. C) WATER DISTRIBUTION PIPING AND CONNECTIONS | | AND VALVE LOCATIONS- 1005.2 D) LOCATIONS AND | | CONNECTIONS OF SAFETY RELIEF VALVES, PRESSURE RELIEF | | VALVES, DISCHARGE PIPING AND DISCHARGE LOCATIONS- | | SECTIONS 1006.2,1006.3, 1006.4, 1006.5, 1006.6, AND | | 1006.7. E) LOCATION OF THE EXPANSION TANK- SECTION 1009 | | FBC M. E) CONNECTION LOCATIONS OF THE GAS PIPING AND | | REGULATOR, COMBUSTION AIR DUCTS, AND VENT DUCT- SECTION | | 107.2.1 WPB. | | | | 6) PASSED. SHEET M501: SHOW THE LOCATION OF THE | | REQUIRED FLOOR DRAIN FOR THE BOILERS- SECTION 1004.6 | | FBC M. | | | | 7) PASSED. M501: SHOW THE GAS PIPING RUN INTO THE | | BOILER ROOM- SECTION 107.2.1 WPB. | | | | 8) FAILED. GAS DRAWING DOES NOT SHOW TOTAL DEVELOPED | | LENGTH OF THE SYSTEM, TYPE OF PIPINGS, TOTAL BTUH GAS | | LOAD OF THE SYSTEM, CUT LENGTHS OF PIPINGS, DELIVERY | | PRESSURES AT THE METER AND AT REGULATORS, GAS PIPE | | SIZING TABLES, LOCATIONS OF DRIP LEGS, UNIONS. PROVIDE | | A GAS ISOMETRIC DRAWING THAT SHOWS THE TYPE AND | | DIAMETERS OF PIPING, THE MEASUREMENTS OF EACH CUT | | LENGTH OF PIPE, THE TOTAL DEVELOPED LENGTH OF THE | | PIPING RUN FROM THE POINT OF DELIVERY AT THE METER TO | | THE MOST REMOTE OUTLET IN THE BUILDING AND TO THE | | BOILERS; GAS DELIVERY PRESSURE OF THE SYSTEM AT THE | | METER AND AT EACH STEPDOWN REGULATOR; LOCATIONS OF | | REQUIRED SHUTOFF VALVES, AND THE BTUH LOADS OF THE NEW | | BOILERS, AND ALL OTHER GAS-FIRED APPLIANCES AND | | EQUIPMENT BEING SERVED BY THE SYSTEM- SECTIONS 402.2 | | AND 402.3 FBC FG. PLEASE INDICATE WHICH PIPE SIZING | | TABLES WERE USED IN THE DESIGN- SECTION 402.3. | | A) FAILED. CONCERNING THE REGULATORS PLEASE REFER TO | | SECTIONS 410.1, 410.2, & 410.3 FBC FG FOR LINE AND MP | | REGULATOR INSTALLATION AND VENTING REQUIREMENTS. PLEASE | | VERIFY SUBMITTALS ARE COMPLIANT AND SHOW ALL REGULATOR | | AND SHUTOFF VALVES IN THE ISOMETRIC DRAWING, AND | | REGULATOR VENT RUNS AND TERMINATION LOCATIONS WHERE | | REQUIRED. | | | | 9) FAILED. A) THE VENT SIZING CALCULATIONS WERE NOT | | PROVIDED- SECTION 501.14 FBC FG. B) SHEETS M-301 & | | M-903 SHOW THE VENT ROOF FREESTANDING ABOVE THE ROOF. | | SHEET M-501 INDICATES THE VENT TO BE IN A CHIMNEY | | ENCLOSURE- WHICH IS IT? , IF THE VENT IS FREESTANDING, | | SHOW THE ACTUAL HEIGHT OF THE VENT FLUE ABOVE THE ROOF | | AND PROVIDE ENGINEERING FOR ANCHORING THE FLUE TO THE | | ROOF STRUCTURE TO RESIST WIND PRESSURES- SECTION | | 301.15- FBC M. C) INDICATE THE REQUIRED CLEARANCE FROM | | THE VENT PENETRATION TO THE COMBUSTIBLE ROOFING | | MATERIAL. D) PROVIDE A SUBMITTAL FOR THE VENT FLUES AND | | COMBUSTION AIR DUCTS OR REQUEST DEFERRED. PROVIDE A | | VENT FLUE DIAGRAM THAT SHOWS THE LENGTHS OF THE | | CONNECTORS, HORIZONTAL AND VERTICAL RUN LENGTHS, TOTAL | | RUN LENGTH OF THE SYSTEM, AND LOCATIONS OF OFFSETS, | | FITTINGS ETC. PER THE NOTES ON SHEET M102 THE PROPOSED | | SYSTEM REQUIRES ENGINEERED SIZING CALCULATIONS WHICH | | SHALL ACCOMPANY THE VENTING DIAGRAM- SEE SECTION | | 506.6.9.3 FBC FG. PLEASE INDICATE THE "VENTING | | APPLIANCE CATEGORY" - I, II, III, OR IV THAT THE SYSTEM | | IS BEING DESIGNED FOR, AND IF THE SYSTEM IS POSITIVE OR | | NEGATIVE AND PRODUCES CONDENSATION- SEE SECTION 202 FBC | | FG. CURRENTLY, A THOROUGH REVIEW OF THE SYSTEM CANNOT | | BE ACCOMPLISHED WITHOUT THE DIAGRAM, AND ADDITIONAL | | SPECIFICATIONS AND INFORMATION- SECTION 107.2.1 WPB. | | PLEASE REFER BACK TO COMMENT #1 FOR SUBMITTAL | | REQUIREMENTS AND REQUIRED UL LISTING AND LABELING. A) | | M502: REFER TO SECTION 503.8 FBC FG AND SHOW THE | | REQUIRED CLEARANCES FROM THE VENT FLUE TERMINATION TO | | MECHANICAL AND GRAVITY AIR INTAKES OR ANY OPERABLE | | OPENINGS INTO THE BUILDING. | | | | 10) PASSED. PROVIDE A COMBUSTION AIR DUCT DIAGRAM THAT | | SHOWS THE LENGTHS OF THE CONNECTORS, HORIZONTAL AND | | VERTICAL RUN LENGTHS, TOTAL RUN LENGTH OF THE SYSTEM, | | AND LOCATIONS OF OFFSETS, FITTINGS ETC.- SECTION 304.1 | | AND 304.11 FBC FG. CURRENTLY, A THOROUGH REVIEW OF THE | | SYSTEM CANNOT BE ACCOMPLISHED WITHOUT THE DIAGRAM, AND | | ADDITIONAL SPECIFICATIONS AND INFORMATION- SECTION | | 107.2.1 WPB. PLEASE REFER BACK TO COMMENT #1 FOR | | SUBMITTAL REQUIREMENTS AND REQUIRED UL LISTING AND | | LABELING. | | | | 11) PASSED. M201: THE SCOPE OF WORK NOTES INDICATES | | DEMOLITION OF AIR CONDITIONING UNITS, DUCTS, TERMINAL | | BOXES ETC. HOWEVER THE DRAWINGS TO NOT SHOW ANY AC | | DEMOLITION OR REWORK. PLEASE PROVIDE THE DRAWINGS- | | SECTION 107.2.1 WPB. | | | | 12) PASSED. M401: PLEASE PLACE A NOTE THAT THE WELDER'S | | CERTIFICATES AND WELDING PROCEDURES SHALL BE ONSITE AT | | TIME OF INSPECTION- SECTION 107.2.1 WPB. | | | | 13) PASSED- SEE NOTE. PROVIDE UL LISTED FIRE STOPPING | | ASSEMBLIES FOR THE PENETRATIONS OF THE VENT FLUE, AND | | COMBUSTION AIR DUCTS THROUGH THE FIRE RATED WALLS AND | | FLOOR CEILING ASSEMBLIES- SECTION 714 FBC B. NOTE: THE | | PIPE PENETRATON FIRESTOPPING DETAIL ON M-903 DOES NOT | | INDICATE IT IS A UL LISTED AND LABELED ASSEMBLY. | | | | 14) PASSED. INDICATE THE TYPE AND THICKNESSES OF THE | | BOILER SERVICE WATER PIPING INSULATIONS AND PROVIDE A | | PRODUCT SUBMITTAL- SEE TABLE C403.2.10 FBC EC. | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | | | CHRISTOPHER L. COLE | | MECHANICAL/PLUMBING PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | | | | | | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2020-04-13 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-04-13 |
Time |
13:43 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-04-13 |
Time |
07:12 |
Sent To |
|
|
Notes |
2020-04-13 13:47:10 | 1ST REVIEW FBC-2017 MECHANICAL | | PERMIT #20040366 | | 4/142020 | | | | CODES IN EFFECT: | | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | 2017 | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION | | 2017 | | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | EDITION 2017 | | | | PLAN REVIEW RESULTS: DENIED | | | | 1) PROVIDE A SUBMITTAL PACKAGE THAT INCLUDES | | MANUFACTURER'S SPECIFICATIONS AND INSTALLATION | | GUIDELINES FOR THE BOILERS, PUMPS, EXPANSION TANK, | | CONTROL VALVES, RELIEF VALVES, CHEMICAL FEEDER, | | CHEMICAL NEUTRALIZERS, VENT FLUE AND VENT CAP, | | COMBUSTION AIR DUCTS, GAS AND HYDRONIC PIPING, AND THE | | GAS REGULATORS AND SHUT OFF VALVES- SECTION 107.2.1 | | WPB. REVIEW ALL REQUIRED COMPLIANCES AND UL LISTINGS | | FOR THE PRODUCTS AS NOTED ON THE SPECIFICATIONS SHEETS | | M101, 102, & 103 AS THEY WILL BE CROSS CHECKED IN THE | | 2ND REVIEW. THE DESIGN PROFESSIONAL OF RECORD SHALL | | PROVIDE APPROVAL STAMPS ON EACH SUBMITTAL DOC, OR | | PROVIDE A STAMPED COVER PAGE WITH AN INDEX LISTING ALL | | PRODUCT SUBMITTALS. | | | | A) PLEASE NOTE THE GAS BOILER SPECIFICATIONS SHALL | | INDICATE THAT THE UNITS ARE LISTED IN ACCORDANCE WITH | | THE REQUIREMENTS OF ANSI Z21.13 OR UL 795, AND DESIGNED | | AND CONSTRUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF | | ASME CSD-1 AND AS APPLICABLE, THE ASME BOILER AND | | PRESSURE VESSEL CODE, SECTIONS I, II, IV, V AND IX AND | | NFPA 85- SECTION 631.1 FBC FG AND SECTION 1004.1 FBC M. | | | | B) COMMISSIONING OF THE BOILERS WILL REQUIRED AS NOTED | | UNDER ITEM 3.05 ON SHEET M103 WHICH LISTS THE AIR AND | | WATER TESTING AND BALANCING. COPIES OF THE TESTING | | REPORTS WILL BE REQUIRED FOR FINAL MECHANICAL APPROVAL- | | SECTION C408.2 FBC EC. | | | | C) THE BOILER SPECIFICATIONS SHALL INDICATE THAT THE | | UNITS HAVE BEEN TESTED OR WILL BE TESTED TO A MAXIMUM | | LEVEL OF 50 PPM OF CARBON MONOXIDE PER OSHA GUIDELINES- | | SECTION 1004.2.1 FBC M. | | | | 2) SHEET M401: PROVIDE THE EFFICIENCY RATINGS OF THE | | BOILERS IN THE EQUIPMENT SCHEDULES- SEE TABLE 404,2 FBC | | EC. | | | | 3) M401: VERIFY THE BOILER SERVICE WATER SYSTEM WILL BE | | CAPABLE OF AUTOMATIC TEMPERATURE RESET AND AUTOMATIC | | VARAIBLE FLUID FLOW- SEE SECTION C403.4.2.2 FBC EC. | | | | 4) M401: INDICATE THE BOILER TURNDOWN RATIO AS REQUIRED | | BYU SECTION C403.4.2.5 FBC EC. | | | | 5) PLEASE PROVIDE FRONT AND TOP VIEW DRAWINGS OR | | DIAGRAMS OF THE BOILERS THAT SHOW A) REQUIRED WORKING | | CLEARANCES AS NOTED IN SECTIONS 1004.3 & 1004.3.1 FBC | | M. B) POTABLE WATER SUPPLY PIPING CONNECTION AND | | LOCATION OF BACKFLOW PREVENTERS AND SHUTOFF VALVES- | | SECTIONS 1005.1 & 1005.2. C) WATER DISTRIBUTION PIPING | | AND CONNECTIONS AND VALVE LOCATIONS- 1005.2 D) | | LOCATIONS AND CONNECTIONS OF SAFETY RELIEF VALVES, | | PRESSURE RELIEF VALVES, DISCHARGE PIPING AND DISCHARGE | | LOCATIONS- SECTIONS 1006.2,1006.3, 1006.4, 1006.5, | | 1006.6, AND 1006.7. E) LOCATION OF THE EXPANSION TANK- | | SECTION 1009 FBC M. E) CONNECTION LOCATIONS OF THE GAS | | PIPING AND REGULATOR, COMBUSTION AIR DUCTS, AND VENT | | DUCT- SECTION 107.2.1 WPB. | | | | 6) SHEET M501: SHOW THE LOCATION OF THE REQUIRED FLOOR | | DRAIN FOR THE BOILERS- SECTION 1004.6 FBC M. | | | | 7) M501: SHOW THE GAS PIPING RUN INTO THE BOILER ROOM- | | SECTION 107.2.1 WPB. | | | | 8) PROVIDE A GAS ISOMETRIC DRAWING THAT SHOWS THE TYPE | | AND DIAMETERS OF PIPING, THE MEASUREMENTS OF EACH CUT | | LENGTH OF PIPE, THE TOTAL DEVELOPED LENGTH OF THE | | PIPING RUN FROM THE POINT OF DELIVERY AT THE METER TO | | THE MOST REMOTE OUTLET IN THE BUILDING AND TO THE | | BOILERS; GAS DELIVERY PRESSURE OF THE SYSTEM AT THE | | METER AND AT EACH STEPDOWN REGULATOR; LOCATIONS OF | | REQUIRED SHUTOFF VALVES, AND THE BTUH LOADS OF THE NEW | | BOILERS, AND ALL OTHER GAS-FIRED APPLIANCES AND | | EQUIPMENT BEING SERVED BY THE SYSTEM- SECTIONS 402.2 | | AND 402.3 FBC FG. PLEASE INDICATE WHICH PIPE SIZING | | TABLES WERE USED IN THE DESIGN- SECTION 402.3. | | A) CONCERNING THE REGULATORS PLEASE REFER TO SECTIONS | | 410.1, 410.2, & 410.3 FBC FG FOR LINE AND MP REGULATOR | | INSTALLATION AND VENTING REQUIREMENTS. PLEASE VERIFY | | SUBMITTALS ARE COMPLIANT AND SHOW ALL REGULATOR AND | | SHUTOFF VALVES IN THE ISOMETRIC DRAWING, AND REGULATOR | | VENT RUNS AND TERMINATION LOCATIONS WHERE REQUIRED. | | | | 9) PROVIDE A VENT FLUE DIAGRAM THAT SHOWS THE LENGTHS | | OF THE CONNECTORS, HORIZONTAL AND VERTICAL RUN LENGTHS, | | TOTAL RUN LENGTH OF THE SYSTEM, AND LOCATIONS OF | | OFFSETS, FITTINGS ETC. PER THE NOTES ON SHEET M102 THE | | PROPOSED SYSTEM REQUIRES ENGINEERED SIZING CALCULATIONS | | WHICH SHALL ACCOMPANY THE VENTING DIAGRAM- SEE SECTION | | 506.6.9.3 FBC FG. PLEASE INDICATE THE "VENTING | | APPLIANCE CATEGORY" - I, II, III, OR IV THAT THE SYSTEM | | IS BEING DESIGNED FOR, AND IF THE SYSTEM IS POSITIVE OR | | NEGATIVE AND PRODUCES CONDENSATION- SEE SECTION 202 FBC | | FG. CURRENTLY, A THOROUGH REVIEW OF THE SYSTEM CANNOT | | BE ACCOMPLISHED WITHOUT THE DIAGRAM, AND ADDITIONAL | | SPECIFICATIONS AND INFORMATION- SECTION 107.2.1 WPB. | | PLEASE REFER BACK TO COMMENT #1 FOR SUBMITTAL | | REQUIREMENTS AND REQUIRED UL LISTING AND LABELING. A) | | M502: REFER TO SECTION 503.8 FBC FG, AND SHOW THE | | REQUIRED CLEARANCES FROM THE VENT FLUE TERMINATION TO | | MECHANICAL AND GRAVITY AIR INTAKES OR ANY OPERABLE | | OPENINGS INTO THE BUILDING. | | | | 10) PROVIDE A COMBUSTION AIR DUCT DIAGRAM THAT SHOWS | | THE LENGTHS OF THE CONNECTORS, HORIZONTAL AND VERTICAL | | RUN LENGTHS, TOTAL RUN LENGTH OF THE SYSTEM, AND | | LOCATIONS OF OFFSETS, FITTINGS ETC.- SECTION 304.1 AND | | 304.11 FBC FG. CURRENTLY, A THOROUGH REVIEW OF THE | | SYSTEM CANNOT BE ACCOMPLISHED WITHOUT THE DIAGRAM, AND | | ADDITIONAL SPECIFICATIONS AND INFORMATION- SECTION | | 107.2.1 WPB. PLEASE REFER BACK TO COMMENT #1 FOR | | SUBMITTAL REQUIREMENTS AND REQUIRED UL LISTING AND | | LABELING. | | | | 11) M201: THE SCOPE OF WORK NOTES INDICATE DEMOLITION | | OF AIR CONDITIONING UNITS, DUCTS, TERMINAL BOXES ETC. | | HOWEVER THE DRAWINGS TO NOT SHOW ANY AC DEMOLITION OR | | REWORK. PLEASE PROVIDE THE DRAWINGS- SECTION 107.2.1 | | WPB. | | | | 12) M401: PLEASE PLACE A NOTE THAT THE WELDER'S | | CETIFICATES AND WELDING PROCEDURES SHALL BE ONSITE AT | | TIME OF INSPECTION- SECTION 107.2.1 WPB. | | | | 13) PROVIDE UL LISTED FIRE STOPPING ASSEMBLIES FOR THE | | PENETRATIONS OF THE VENT FLUE, AND COMBUSTION AIR DUCTS | | HROUGH THE FIRE RATED WALLS AND FLOOR CEILING | | ASSEMBLIES- SECTION 714 FBC B. | | | | 14) INDICATE THE TYPE AND THICKNESSES OF THE BOILER | | SERVICE WATER PIPING INSULATIONS AND PROVIDE A PRODUCT | | SUBMITTAL- SEE TABLE C403.2.10 FBC EC. | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2020-06-11 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-06-11 |
Time |
10:55 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-06-11 |
Time |
06:59 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
F |
Date |
2020-05-14 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-05-14 |
Time |
14:34 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-05-14 |
Time |
13:38 |
Sent To |
|
|
Notes |
2020-05-14 14:36:33 | 2ND REVIEW FBC-2017 PLUMBING | | PERMIT #20040366 | | 5/14/2020 | | | | CODES IN EFFECT: | | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | 2017 | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION | | 2017 | | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | EDITION 2017 | | | | PLAN REVIEW RESULTS: DENIED. | | COMMENT #2 FROM THE 1ST REVIEW PRINTED BELOW WAS NOT | | COMPLETELY ADDRESSED. | | | | 2) PROVIDE A CONDENSATE DISPOSAL DIAGRAM SHOWING HOW | | CONDENSATE FROM THE VENT FLUE, AND FROM THE BOILER | | NEUTRALIZERS WILL BE DRAINED AND DISPOSED OF- SECTION | | 107.2.1 WPB. SEE MECHANICAL COMMENT #1 FOR NEUTRALIZER | | PRODUCT SUBMITTAL REQUIREMENT. | | | | THE REQUESTED DIAGRAM WAS NOT PROVIDED ON SHEET P-001. | | AS STATED IN THE NARRATIVE RESPONSE BY THE EOR. SHEETS | | P-001 & P-501: | | A) PLEASE PROVIDE THE CONDENSATE DRAINAGE DIAGRAM | | SHOWING THE DRAIN LINE RUN FROM THE VENT TO THE ACID | | NEUTRALIZING TANK, AND THE WASTE LINE RUN FROM THE TANK | | TO THE FLOOR DRAIN- SECTION 107.2.1 WPB. | | B) P-501: SHOW THE CONDENSATE DRAIN LINE RUN TO THE | | ACID TANK, AND THE WASTE LINE RUN TO THE FLOOR DRAIN ON | | THE PLAN. | | C) 2ND REQUEST TO SUBMIT SPECS FOR THE TANK. PLEASE | | NOTE THAT SECTION 803.1 FBC P REQUIRES THAT AN | | AUTOMATIC SUFFICIENT SUPPLY OF DILUTING WATER IS | | REQUIRED SO AS TO MAKE THE CONTENTS NONINJURIOUS BEFORE | | DISCHARGE INTO THE DRAINAGE SYSTEM. THE NATURE OF THE | | CORROSIVE OR HARMFUL WASTE AND THE METHOD OF ITS | | TREATMENT OR DILUTION SHALL BE APPROVED PRIOR TO | | INSTALLATION. | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | | | CHRISTOPHER L. COLE | | PLUMBING PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2020-04-14 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-04-14 |
Time |
14:10 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-04-14 |
Time |
12:56 |
Sent To |
|
|
Notes |
2020-04-14 14:34:52 | 1ST REVIEW FBC-2017 PLUMBING | | PERMIT #20040366 | | 4/14/2020 | | | | CODES IN EFFECT: | | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | 2017 | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION | | 2017 | | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | EDITION 2017 | | | | PLAN REVIEW RESULTS: DENIED. | | | | 1) REFER TO SECTION 608.16.2 FBC P AND PROVIDE A | | PRODUCT SUBMITTAL FOR THE RPZ BACKFLOW PREVENTER. THE | | POTABLE SUPPLY TO THE BOILER SHALL BE EQUIPPED WITH A | | BACKFLOW PREVENTER WITH AN INTERMEDIATE ATMOSPHERIC | | VENT COMPLYING WITH ASSE 1012 OR CSA B64.3. WHERE | | CONDITIONING CHEMICALS ARE INTRODUCED INTO THE SYSTEM, | | THE POTABLE WATER CONNECTION SHALL BE PROTECTED BY AN | | AIR GAP OR A REDUCED PRESSURE PRINCIPLE BACKFLOW | | PREVENTER, COMPLYING WITH ASSE 1013, CSA B64.4 OR AWWA | | C511. | | | | 2) PROVIDE A CONDENSATE DISPOSAL DIAGRAM SHOWING HOW | | CONDENSATE FROM THE VENT FLUE, AND FROM THE BOILER | | NEUTRALIZERS WILL BE DRAINED AND DISPOSED OF- SECTION | | 107.2.1 WPB. SEE MECHANICAL COMMENT #1 FOR NEUTRALIZER | | PRODUCT SUBMITTAL REQUIREMENT. | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | | | CHRISTOPHER L. COLE | | PLUMBING PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
P |
Date |
2020-06-11 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-06-11 |
Time |
11:28 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-06-11 |
Time |
11:28 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2020-05-15 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-05-15 |
Time |
08:54 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-05-15 |
Time |
08:54 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2020-04-15 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-04-15 |
Time |
11:24 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-04-15 |
Time |
11:24 |
Sent To |
|
|
Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |