Plan Review Details - Permit 20040149
Plan Review Stops For Permit 20040149 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2021-04-12 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2021-04-12 |
Time |
09:18 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2021-04-12 |
Time |
09:18 |
Sent To |
|
|
Notes |
2021-04-12 09:12:03 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | REVISION DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THE REVISION APPLICATION STATES THAT THE NUMBER OF | | OVERFLOW SCUPPERS IS TO BE REDUCED FROM (4) FOUR TO (3) | | THREE. THE PLAN SHEET THAT WAS SUBMITTED ONLY SHOWS THE | | SCUPPER DETAILS. IN ORDER TO SHOW COMPLIANCE WITH THE | | FBC YOU WILL NEED TO SUBMIT THE ROOF PLANS THAT SHOW | | THE LOCATIONS OF THE OVERFLOW SCUPPERS AND SHOW THAT | | THEY CAN PROVIDE THE REQUIRED ROOF DRAINAGE. INDICATE | | THE LOCATION OF THE (1) ONE THAT IS BEING ELIMINATED | | AND THE LOCATIONS OF THE (3) THAT WILL REMAIN. FBC | | AMENDMENTS 107.2.1 | | | | 2) SUBMIT CALCULATIONS TO SHOW THAT THE (3) THREE | | REMAINING OVERFLOW SCUPPERS WILL PROVIDE THE REQUIRED | | AMOUNT OF ROOF DRAINAGE. FBC 1503.4 | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
2021-04-16 |
Time |
|
Rev Time |
0.00 |
Received By |
shill |
Date |
2021-04-07 |
Time |
18:04 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2021-04-16 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2021-04-16 |
Time |
12:13 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2021-04-16 |
Time |
11:23 |
Sent To |
|
|
Notes |
2021-04-16 12:15:56 | 1ST REVIEW FBC-2020 PLUMBING | | PERMIT- 20040149 | | 4/16/2021 | | | | CODES IN EFFECT: | | FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020 | | FBC ACC- FLORIDA ACCESSIBILITY CODE 7TH EDITION 2020 | | FBC B- FLORIDA BUILDING CODE 7TH EDITION 2020 | | FBC M- FLORIDA MECHANICAL CODE 7TH EDITION 2020 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE 7TH EDITION | | 2020 | | FBC FG- FLORIDA FUEL GAS CODE 7TH EDITION 2020 | | FBC EX- FLORIDA EXISTING BUILDING CODE 7TH EDITION 2020 | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC | | | | PLAN REVIEW RESULTS: DENIED. | | | | 1) PROVIDE A REVISED ROOF DRAINAGE PLAN SHOWING THE | | LOCATION OF THE REMOVED SCUPPER. PLEASE INCLUDE THE | | ROOF AREA CALCULATIONS AND SHOW THE REMAINING SCUPPERS- | | LOCATIONS AND SIZES- WILL PROVIDE ADEQUATE EMERGENCY | | OVERFLOW DRAINAGE BASED ON THE RAINFALL RATE FOR WHICH | | THE PRIMARY SYSTEM IS SIZED- SECTION 1108.2 FBC P. | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | | | CHRISTOPHER L. COLE | | MECHANICAL/PLUMBING PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2021-04-12 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2021-04-12 |
Time |
09:20 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2021-04-12 |
Time |
09:20 |
Sent To |
|
|
Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |