Plan Review Stops For Permit 20040033 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2020-05-14 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-05-14 |
Time |
07:26 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-05-14 |
Time |
07:26 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2020-05-11 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-05-11 |
Time |
09:11 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-05-11 |
Time |
09:11 |
Sent To |
|
|
Notes |
2020-05-11 09:13:41 | 1) COMPLIED. THE SIGNATURE ON GENERATOR PAD DRAWINGS IS | | ACCEPTABLE DUE TO EMERGENCY RULE 61G15ER20-4. | | | | 2) THE ENGINEERED DOCUMENTS FOR THE GENERATOR PAD | | SPECIFIES A VULT WINDSPEED OF 165MPH AND THE WINDSPEED | | FOR THIS PROJECT IS 170MPH. CITY AMENDMENTS FBC 120.1 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2020-05-07 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-05-07 |
Time |
15:19 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-05-07 |
Time |
15:19 |
Sent To |
|
|
Notes |
2020-05-07 15:19:12 | PLAN | | REVIEW COMMENTS | | 2ND REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) I AM NOT ABLE TO VERIFY THE DIGITAL SIGNATURE ON THE | | GENERATOR PAD DOCUMENT THAT WAS SUBMITTED. IF THE | | DOCUMENT PRINTED OUT AND THEN UPLOADED THE DIGITAL | | SIGNATURE IS VOIDED. EACH SHEET OF THE DOCUMENT IS | | REQUIRED TO BE SIGNED AND SEALED, UNLESS A COVERSHEET | | LISTING ALL OF THE PAGES IS USED. FS 471 & FAC 61G-15 | | 2) THE ENGINEERED DOCUMENTS FOR THE GENERATOR PAD | | SPECIFIES A VULT WINDSPEED OF 165MPH AND THE WINDSPEED | | FOR THIS PROJECT IS 170MPH. CITY AMENDMENTS FBC 120.1 | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2020-04-01 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-04-01 |
Time |
18:09 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-04-01 |
Time |
18:09 |
Sent To |
|
|
Notes |
2020-04-01 18:13:52 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THE PRE-FAB GENERATOR PAD DRAWINGS ARE REQUIRED TO | | BE SIGNED, SEALED AND DATED BY THE ENGINEER. FAC | | 61G15-23.003 PROCEDURES FOR PHYSICALLY SIGNING AND | | SEALING PLANS, SPECIFICATIONS, REPORTS OR OTHER | | DOCUMENTS. | | ENGINEERING PLANS, SPECIFICATIONS, REPORTS OR OTHER | | DOCUMENTS WHICH MUST BE SIGNED, DATED AND SEALED IN | | ACCORDANCE WITH THE PROVISIONS OF SECTION 471.025, | | F.S., AND RULE 61G15-23.001, F.A.C. MUST BE PHYSICALLY | | SIGNED, DATED AND SEALED AS PROVIDED HEREIN BY THE | | PROFESSIONAL ENGINEER IN RESPONSIBLE CHARGE. | | (1) THE LICENSEE SHALL SIGN BY HAND AN ORIGINAL OF THE | | LICENSEE?S SIGNATURE ON EACH PAGE REQUIRED TO BE | | SEALED. A SCANNED, FACSIMILE, DIGITALLY CREATED OR | | COPIED IMAGE OF THE LICENSEE?S SIGNATURE SHALL NOT BE | | USED. | | (2) THE LICENSEE MUST THEN USE A WET SEAL, A DIGITALLY | | CREATED SEAL, OR AN EMBOSSING SEAL PLACED PARTIALLY | | OVERLAPPING THE LICENSEE?S SIGNATURE ON EACH PAGE | | REQUIRED TO BE SEALED. THE PLACEMENT OF THE SEAL SHALL | | NOT RENDER THE SIGNATURE ILLEGIBLE. | | | | 2) THE ENGINEERED DOCUMENTS FOR THE GENERATOR PAD DOES | | NOT SPECIFY THE WINDLOADS AND EXPOSURE CATEGORY FOR | | WHICH IT HAS BEEN DESIGNED. FBC 107.2.1 | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2020-05-18 |
|
|
Cont ID |
|
Sent By |
jpearson |
Date |
2020-05-18 |
Time |
15:07 |
Rev Time |
0.00 |
Received By |
jpearson |
Date |
2020-05-18 |
Time |
12:36 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2020-04-03 |
|
|
Cont ID |
|
Sent By |
jpearson |
Date |
2020-04-03 |
Time |
12:09 |
Rev Time |
0.00 |
Received By |
jpearson |
Date |
2020-04-03 |
Time |
12:09 |
Sent To |
|
|
Notes |
2020-04-03 12:09:21 | CODES IN EFFECT: | | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 | | 6TH ED, CHAPTER 1. | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 | | 6TH EDITION | | FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017 | | 6TH EDITION | | FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION | | NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE | | FS = FLORIDA STATUTES | | FAC = FLORIDA ADMINISTRATIVE CODE | | | | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | 1. PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF | | PLAN IS REQUIRED TO BE SIGNED AND SEALED BY THE PERSON | | RESPONSIBLE FOR THE DESIGN. A DIGITAL PLAN REQUIRES A | | DIGITAL SIGNATURE WITH THE PROPER THIRD PARTY | | VERIFICATION. PROVIDE CORRECTION. WPB FBC 107.1; FS | | 471/481 | | 2. PLAN SHEETS ARE REQUIRED TO SHOW THE ADDRESS OF THE | | PROJECT. PROVIDE CORRECTION. WPB FBC 107.2.1 | | | | END OF COMMENTS. | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | RESUBMITTING, PROVIDE A RESPONSE LETTER ADDRESSING EACH | | ITEM ALONG WITH THE CITY RESUBMITTAL FORM. | | ADDITIONALLY, INSERT CORRECTED PAGES INTO THE ORIGINAL | | SUBMITTAL AND REMOVE THE PREVIOUSLY REVIEWED SHEETS. | | ONE COPY OF THE PREVIOUSLY REVIEWED SHEETS SHOULD | | REMAIN IN PACKAGE AND BE MARKED OLD SHEETS. | | | | SINCERELY, | | | | JOHN PEARSON | | ELECTRICAL PLANS EXAMINER | | 561-805-6746 | | [email protected] | | |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
P |
Date |
2020-06-29 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2020-06-29 |
Time |
12:40 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2020-06-24 |
Time |
14:46 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
F |
Date |
2020-05-19 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2020-05-19 |
Time |
08:38 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2020-05-19 |
Time |
08:01 |
Sent To |
|
|
Notes |
2020-05-19 08:38:07 | 1) THE PLANS SHOW AN EXISTING GAS METER AND EXISTING | | GAS SYSTEM AND APPLIANCES. CITY RECORDS DO NOT SHOW ANY | | PERMITS FOR THIS EXISTING SYSTEM. THE EXISTING SYSTEM | | MUST BE LEGALLY PERMITTED PER WPB AMEND. TO FBC SEC. | | 105.1. | | 2) THE SHUTOFF VALVE ON THE EXISTING GAS LINE SHALL BE | | LOCATED AHEAD OF THE REGULATOR PER FBC-FUEL GAS | | SEC.409.4. | | 3) WHERE CONNECTED TO RIDGID PIPING, A UNION SHALL BE | | INSTALLED WITHIN 1 FOOT OF EITHER SIDE OF THE | | REGULATOR. FBC-FUEL GAS SEC.410.2 (7). | | 4) THE BTU LOAD OF THE NEW GENERATOR IS SHOWN AS | | 281,000 BTU'S AND ALSO AS 327,000 BTU'S. CLARIFY. NOTE: | | THE SPECIFICATIONS CALL OUT 327,000 BTU'S. | | 5) SUBMIT MANUF. SPECS ON THE REGULATORS. REGULATORS | | INSTALLED ON THE EXTERIOR OF A STRUCTURE SHALL BE | | APPROVED FOR OUTDOOR USE. FBC-FUEL GAS 410.1. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2020-06-29 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2020-06-29 |
Time |
12:41 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2020-06-22 |
Time |
09:48 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2020-05-19 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2020-05-19 |
Time |
08:38 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2020-04-30 |
Time |
09:04 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2020-04-07 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2020-04-07 |
Time |
09:30 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2020-04-01 |
Time |
10:04 |
Sent To |
|
|
Notes |
2020-04-02 10:05:16 | DIGITAL |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
N |
Date |
2020-06-24 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2020-06-24 |
Time |
14:44 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2020-06-24 |
Time |
14:44 |
Sent To |
|
|
Notes |
2020-06-24 14:45:54 | THERE IS NO PLUMBING ON THIS PERMIT. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2020-04-10 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2020-04-10 |
Time |
07:20 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2020-04-08 |
Time |
07:28 |
Sent To |
|
|
Notes |
2020-04-10 07:20:48 | 04/10/20 REVIEWED FOR CODE COMPLIANCE (GAS) | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM | | THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND | | NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF | | PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY | | ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | AVOID VOIDING OF THE PERMIT. | | | | LUIS A. CRESPO | | PLUMBING INSPECTOR / PLUMBING PLAN REVIEW | | AVAILABLE FROM 6:30 AM TO 7:30 AM / 2:00 PM TO 5:00 PM | | EMAIL: [email protected] CELL: 561-701-6437 | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
N |
Date |
2020-06-29 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2020-06-29 |
Time |
12:40 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2020-06-29 |
Time |
12:40 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2020-05-11 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-05-11 |
Time |
09:11 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-05-11 |
Time |
09:11 |
Sent To |
|
|
Notes |
2020-05-11 09:13:30 | SIGNATURE ON GENERATOR PAD DRAWINGS IS ACCEPTABLE DUE | | TO EMERGENCY RULE 61G15ER20-4. |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2020-04-02 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-04-02 |
Time |
10:57 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-04-02 |
Time |
10:57 |
Sent To |
|
|
Notes |
2020-04-03 15:37:02 | THE PAPER SLAB STRUCTURAL DRAWING WAS A PHOTOCOPY. | | DOCUMENTS PREPARED BY AN ENGINEER AND SUBMITTED FOR | | PUBLIC RECORD ARE TO BE SIGNED, SEALED, DATED ORGINALS | | FS471. | | | 2020-04-02 11:05:33 | THE PRE-FAB GENERATOR PAD ENGNEERING REQUIRES A DIGITAL | | SIGNATURE. THESE PAPER PLANS WERE CONVERTED TO DIGITAL. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2020-04-07 |
|
|
Cont ID |
|
Sent By |
rfalcone |
Date |
2020-04-07 |
Time |
08:52 |
Rev Time |
0.00 |
Received By |
rfalcone |
Date |
2020-04-07 |
Time |
08:52 |
Sent To |
I |
|
Notes |
|
|