Plan Review Details - Permit 20031065
Plan Review Stops For Permit 20031065
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2020-10-20 Cont ID  
Sent By dbattles Date 2020-10-20 Time 17:00 Rev Time 0.00
Received By dbattles Date 2020-10-20 Time 17:00 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-09-30 Cont ID  
Sent By dbattles Date 2020-09-30 Time 09:51 Rev Time 0.00
Received By dbattles Date 2020-09-30 Time 09:51 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-05-12 Cont ID  
Sent By sakenned Date 2020-05-12 Time 08:25 Rev Time 0.00
Received By skennedy Date 2020-05-12 Time 08:25 Sent To  
Notes
2020-05-29 09:32:15SUBJECT TO ASSURING SITE ACCESSIBILITY IS PROVIDED AND
 ALL PLANNING, ZONING, ENGINEERING, AND FIRE DEPARTMENT
 SITE CONCERNS ARE ADDRESSED ALONG WITH ANY OTHER
 CONDITIONS SUCH AS AIPP. COORDINATE WITH FIRE CHIEF AND
 CHIEF BUILDING INSPECTOR AS TO SITE SEPARATION OF
 CONSTRUCTION TRAFFIC AND OTHER STAGING.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status N Date 2020-05-05 Cont ID  
Sent By rrossano Date 2020-05-05 Time   Rev Time 0.00
Received By rrossano Date 2020-05-05 Time   Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2020-10-14 Cont ID  
Sent By pleduc Date 2020-10-14 Time   Rev Time 0.00
Received By pleduc Date 2020-10-14 Time 15:46 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2020-08-27 Cont ID  
Sent By pleduc Date 2020-08-27 Time   Rev Time 0.00
Received By pleduc Date 2020-08-27 Time 10:36 Sent To  
Notes
2020-08-27 10:48:54THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
  
 1) ALL LIFE SAFETY SHALL BE INSTALLED, TESTED AND
 INSPECTED PRIOR TO ANY TCO/CO FOR EACH PHASE.
  
 301 FOR FIRE ALARM AND FIRE SPRINKLER WITH A TCO
 REQUEST
  
 131 FIRE FINAL ON THE MASTER WITH A TCO REQUEST.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2020-04-03 Cont ID  
Sent By pleduc Date 2020-04-03 Time   Rev Time 0.00
Received By pleduc Date 2020-04-03 Time 09:46 Sent To  
Notes
2020-04-03 10:02:25THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
  
 1) ALL LIFE SAFETY SHALL BE INSTALLED, TESTED AND
 INSPECTED PRIOR TO ANY TCO/CO FOR EACH PHASE.
  
 301 FOR FIRE ALARM AND FIRE SPRINKLER WITH A TCO
 REQUEST
  
 131 FIRE FINAL ON THE MASTER WITH A TCO REQUEST.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2020-11-02 Cont ID  
Sent By ccarvaja Date 2020-11-02 Time 15:30 Rev Time 0.00
Received By ccarvaja Date 2020-10-13 Time 13:57 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-09-30 Cont ID  
Sent By dbattles Date 2020-09-30 Time 09:52 Rev Time 0.00
Received By dbattles Date 2020-08-26 Time 15:50 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-05-12 Cont ID  
Sent By skennedy Date 2020-05-12 Time 08:25 Rev Time 0.00
Received By skennedy Date 2020-03-30 Time 11:18 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-09-30 Cont ID  
Sent By dbattles Date 2020-09-30 Time 09:52 Rev Time 0.00
Received By dbattles Date 2020-09-30 Time 09:52 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2020-05-12 Cont ID  
Sent By skennedy Date 2020-05-12 Time 08:25 Rev Time 0.00
Received By skennedy Date 2020-05-12 Time 08:25 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status F Date 2020-11-02 Cont ID  
Sent By jroach Date 2020-11-02 Time 11:21 Rev Time 0.00
Received By jroach Date 2020-11-02 Time 11:20 Sent To  
Notes
2020-11-02 11:22:52ZONING PLAN REVIEW
 ________________________________________
  
 DATE OF REVIEW: 11.02.2020
 PERMIT NO.: 20031065
 ________________________________________
  
 REVIEW STATUS: FAILED
 ________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. THE SHEET TITLED "CASA MARA PHASING PLAN" APPEARS TO
 BE THE PARKING COUNT PLAN. PLEASE ENSURE THAT THE
 CORRECT PLAN IS UPLOADED INTO THE SYSTEM AND THAT IT IS
 THE MOST CURRENT PLAN PROPOSED.
  
 PLEASE BE SURE TO NOTE ANY/ALL CONDITIONS WITHIN THE
 DEVELOPMENT ORDER THAT ARE REQUIRED TO BE SATISIFIED
 PRIOR TO THE ISSUANCE OF A CO.
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
 TTY: 800.955.8771
 E: [email protected]
  
 W: WPB.ORG
  

Review Stop Z ZONING
Rev No 2 Status F Date 2020-09-15 Cont ID  
Sent By jroach Date 2020-09-15 Time 12:52 Rev Time 0.00
Received By jroach Date 2020-09-15 Time 12:51 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2020-04-10 Cont ID  
Sent By jroach Date 2020-04-10 Time 08:49 Rev Time 0.00
Received By jroach Date 2020-04-10 Time 08:49 Sent To  
Notes
2020-04-10 08:49:23ZONING PLAN REVIEW
 ________________________________________
  
 DATE OF REVIEW: 04.10.2020
 PERMIT NO.: 20031065
 ________________________________________
  
 REVIEW STATUS: FAILED
 ________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. PLEASE PROVIDE THE PARKING CALCULATIONS (REQUIRED
 AND PROVIDED) FOR EACH PHASE TO DETERMINE THAT WHEN
 EACH PHASE IS OPENED UP, THAT THE MINIMUM NUMBER OF
 REQUIRED PARKING SPACES IS BEING PROVIDED.
  
 2. PLEASE CLARIFY WHEN THE ON-STREET PARKING, ETC. IS
 TO BE COMPLETED. THESE PARKING SPACES ARE ATTRIBUTED TO
 THE OVERALL PARKING REQUIREMENT AS SHOULD BE FACTORED
 INTO THE PHASING.
  
 3. PLEASE BE SURE TO NOTE ANY/ALL CONDITIONS WITHIN THE
 DEVELOPMENT ORDER THAT ARE REQUIRED TO BE SATISIFIED
 PRIOR TO THE ISSUANCE OF A CO.
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
 TTY: 800.955.8771
 E: [email protected]
  
 W: WPB.ORG
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved