Plan Review Stops For Permit 20030982 |
Review Stop |
AD |
ADDRESSING |
Rev No |
3 |
Status |
P |
Date |
2021-07-09 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2021-07-09 |
Time |
16:35 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2021-07-09 |
Time |
16:35 |
Sent To |
|
|
Notes |
2021-07-09 16:35:50 | ADDRESS CHANGED TO 1333 S FLAGLER DR |
|
|
Review Stop |
AD |
ADDRESSING |
Rev No |
2 |
Status |
F |
Date |
2021-06-09 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2021-06-09 |
Time |
13:58 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2021-06-09 |
Time |
13:58 |
Sent To |
|
|
Notes |
2021-06-09 13:59:20 | PLEASE CONTACT [email protected] TO DISCUSS ADDRESSING | | OPTIONS FOR THE PROJECT. |
|
|
Review Stop |
AD |
ADDRESSING |
Rev No |
1 |
Status |
F |
Date |
2020-04-10 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2020-04-10 |
Time |
15:41 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2020-04-10 |
Time |
15:41 |
Sent To |
|
|
Notes |
2020-04-10 15:43:03 | PLEASE CONTACT [email protected] TO DISCUSS ADDRESS FOR | | THE PROPERTY. PLEASE PROVIDE SITE PLAN IDENTIFYING THE | | MAIN ENTRANCE. |
|
|
Review Stop |
AIPP |
ART IN PUBLIC PLACES |
Rev No |
3 |
Status |
P |
Date |
2021-09-27 |
|
|
Cont ID |
|
Sent By |
scwelter |
Date |
2021-09-27 |
Time |
14:52 |
Rev Time |
0.00 |
Received By |
scwelter |
Date |
2021-09-27 |
Time |
15:13 |
Sent To |
|
|
Notes |
2021-09-27 15:13:30 | DEVELOPMENT SUBJECT TO ART REQUIREMENT. APPLICANT MUST | | SUBMIT A COMPLETED ART ASSESSMENT APPLICATION ALONG | | WITH EVIDENCE OF ESCROW FOR THE TOTAL CONSTRUCTION | | COSTS OF THE DEVELOPMENT INCLUDING THE COSTS OF THE | | FOUNDATION AT TIME OF BUILDING PERMIT. | | | | APPLICANT HAS RECEIVED THE ART ASSESSMENT APPLICATION | | AND IS AWARE OF THE CITY'S PUBLIC ART REQUIREMENT. | | | | MASTER PERMIT - 21071625 | | | | FURTHER CITY COMMISSION APPROVED USE OF RIGHT WAY ON | | ACACIA ROAD FOR THE PUBLIC BENEFIT OF A "PUBLICLY | | ACCESSIBLE ART" | | | | |
|
|
Review Stop |
AIPP |
ART IN PUBLIC PLACES |
Rev No |
2 |
Status |
F |
Date |
2021-06-09 |
|
|
Cont ID |
|
Sent By |
scwelter |
Date |
2021-06-09 |
Time |
14:50 |
Rev Time |
0.00 |
Received By |
scwelter |
Date |
2021-06-09 |
Time |
14:51 |
Sent To |
|
|
Notes |
2021-06-09 14:51:29 | A COMPLETED PUBLIC ART ASSESSMENT APPLICATION IS | | REQUIRED AT TIME OF BUILDING PERMIT SUBMITTAL. | | | | PLEASE CONTACT SYBILLE WELTER AT [email protected] OR | | 561.822.1521 TO OBTAIN AN APPLICATION AND REVIEW THE | | REQUIREMENTS. | | | | |
|
|
Review Stop |
AIPP |
ART IN PUBLIC PLACES |
Rev No |
1 |
Status |
F |
Date |
2020-06-19 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-06-19 |
Time |
15:35 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-06-19 |
Time |
15:35 |
Sent To |
|
|
Notes |
2020-06-19 15:35:35 | ART IN PUBLIC PLACES | | THE CITY OF WEST PALM BEACH ART IN PUBLIC PLACES | | ORDINANCE REQUIREMENT THAT APPLIES TO ANY REMODEL OR | | NEW CONSTRUCTION PROJECT FOR WHICH THE PERMIT | | APPLICATION WAS SUBMITTED AFTER 6/29/14, AND THE TOTAL | | PROJECT CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN | | $750,000 WILL NEED TO COMPLY WITH THIS ORDINANCE. | | PER CITY OF WEST PALM BEACH ORDINANCE NO. 4504-14, AND | | CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE V, | | ART IN PUBLIC PLACES, SECTION 78-123(A) AND SECTION | | 78-126(A), THE ART ASSESSMENT IS 1% OF THE TOTAL | | PROJECT CONSTRUCTION COST. | | PER CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE | | V, ART IN PUBLIC PLACES, SECTION 78-122, RENOVATION AND | | NEW CONSTRUCTION PROJECTS ARE ASSESSED CUMULATIVELY, SO | | THE ART ASSESSMENT WILL BE APPLICABLE TO ALL FUTURE | | PROJECTS. | | SEC. 78-129. - PUBLIC ART ASSESSMENT FOR PRIVATE | | DEVELOPMENT. | | (A) APPLICABILITY. THE PROVISIONS OF THIS ARTICLE AND | | THE PUBLIC ART ASSESSMENT SECTION SHALL APPLY TO ALL | | PRIVATE DEVELOPMENT PROJECTS, INCLUDING NEW | | CONSTRUCTION, OR THE RENOVATION OR IMPROVEMENT OF AN | | EXISTING BUILDING, WHERE TOTAL CONSTRUCTION COSTS ARE | | EQUAL TO OR GREATER THAN $750,000.00. ALL BUILDINGS | | WITHIN NEW PLANNED DEVELOPMENTS SHALL BE ASSESSED | | CUMULATIVELY TOWARDS THIS ART IN PUBLIC PLACES | | REQUIREMENT, EVEN IF THE BUILDINGS ARE PERMITTED | | SEPARATELY OR DEVELOPED IN PHASES. THE PROVISIONS OF | | THIS SECTION APPLY TO NEW DEVELOPMENT OR NEW | | CONSTRUCTION WITHIN EXISTING PLANNED DEVELOPMENTS. | | FOR INFORMATION PLEASE CONTACT: | | MS. SYBILLE WELTER, ART IN PUBLIC PLACES COORDINATOR AT | | 822-1515 OR E-MAIL: [email protected] | | AIPP COMPLIANCE REQUIRED; VERIFICATION REQUIRED PRIOR | | TO C.O. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
6 |
Status |
P |
Date |
2022-03-30 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-03-30 |
Time |
14:15 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-03-30 |
Time |
14:15 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
F |
Date |
2022-02-14 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-02-14 |
Time |
13:54 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-02-14 |
Time |
13:54 |
Sent To |
|
|
Notes |
2022-02-14 13:58:57 | FOUNDATION ONLY | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | AMENDMENT | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | | 1) DRAWING C-500 HAS BEEN REVISED AND NO LONGER SHOWS | | THE FOOT PRINT OF THE PARKING GARAGE - PLEASE SHOW THE | | BUILDING FOOT PRINT FOR THE 2 PARKING GARAGE FLOORS | | WHICH ARE CLOSE TO THE FLOOD ZONE. PLEASE CALL OUT THE | | BUILDING FOOT PRINT LINES. | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2021-11-22 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-11-22 |
Time |
10:13 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-11-22 |
Time |
10:13 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2021-09-27 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-09-27 |
Time |
11:39 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-09-27 |
Time |
10:24 |
Sent To |
|
|
Notes |
2021-09-27 10:52:58 | NEW RESIDENTIAL HI RISE "FOUNDATION ONLY" | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | | | CORRECTIONS NEEDED - INCLUDED ARE COMMENTS PROVIDED BY | | ROBERT MCDOUGAL THAT WERE NOT CORRECTED | | | | 1) DO NOT SEE THIS STATEMENT ON ALL OF THE PLANS - | | THRESHOLD BLDG. REQUIRED STATEMENT: W.P.B. AMENDMENT | | 110.8.4.4 ALL PLANS FOR THE BUILDING WHICH ARE REQUIRED | | TO BE SIGNED AND SEALED BY THE ARCHITECT OR ENGINEER OF | | RECORD CONTAIN A STATEMENT THAT, TO THE BEST OF THE | | ARCHITECT'S OR ENGINEER'S KNOWLEDGE, THE PLANS AND | | SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM | | BUILDING CODES AND THE APPLICABLE FIRE-SAFETY STANDARDS | | AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH | | THIS SECTION AND CHAPTER 633 FLORIDA STATUTES. | | | | 2) DRAWINGS - (LS1.107) AND (LS1.104) STILL SHOW BOTH | | EGRESS PATHS THROUGH THE ELEVATOR LOBBY - SOME FLOOR | | PLANS NEED TO COMPLY WITH FBC 1016.2 EGRESS THROUGH | | INTERVENING SPACES. | | EGRESS THROUGH INTERVENING SPACES SHALL COMPLY WITH | | THIS SECTION. | | 1.EXIT ACCESS THROUGH AN ENCLOSED ELEVATOR LOBBY IS | | PERMITTED. ACCESS TO NOT LESS THAN ONE OF THE REQUIRED | | EXITS SHALL BE PROVIDED WITHOUT TRAVEL THROUGH THE | | ENCLOSED ELEVATOR LOBBIES REQUIRED BY SECTION 3006. | | | | 3) PAGE 8 OF THE SPECIAL INSPECTOR AGREEMENT PACKAGE | | FORM NEEDS TO BE FILLED OUT - THE CONTRACTOR AND THE | | OWNER OF THE PROJECT SIGNATURES FORM. | | | | 4) I HAVE REMOVED THE ELEVATION CERTIFICATE FROM | | PROJECTDOX - ELEVATION CERTIFICATE IS FOR THE BUILDING | | ONLY - THE ELEVATION CERTIFICATE IS ONLY NEEDED IF THE | | BUILDING IS IN THE AE FLOOD ZONE. | | ELEVATION CERTIFICATE - ITEM B8. FLOOD ZONE(S). ENTER | | THE FLOOD ZONE, OR FLOOD ZONES, IN WHICH THE BUILDING | | IS LOCATED. ALL FLOOD ZONES | | CONTAINING THE LETTER "A" OR "V" ARE CONSIDERED SPECIAL | | FLOOD HAZARD AREAS. THE FLOOD ZONES ARE A, AE, A1?A30, | | V, | | VE, V1?V30, AH, AO, AR, AR/A, AR/AE, AR/A1?A30, AR/AH, | | AND AR/AO. EACH FLOOD ZONE IS DEFINED IN THE LEGEND OF | | THE FIRM PANEL ON WHICH IT APPEARS. | | | | | | WILL NEED BUILDING OFFICIAL APPROVAL FOR THE FOUNDATION | | ONLY - FBC WPB 105.13 PHASED PERMIT APPROVAL. AFTER | | SUBMITTAL OF THE APPROPRIATE CONSTRUCTION DOCUMENTS, | | THE BUILDING OFFICIAL IS AUTHORIZED TO ISSUE A PERMIT | | FOR THE CONSTRUCT ION OF FOUNDATIONS OR ANY OTHER | | PART OF A BUILDING OR STRUCTURE BEFORE THE CONSTRUCTION | | DOCUMENTS FOR THE WHOLE BUILDING OR STRUCTURE | | HAVE BEEN SUBMITTED. THE HOLDER OF SUCH PERMIT FOR THE | | FOUNDATION OR OTHER PARTS OF A | | BUILDING OR STRUCTURE SHALL PROCEED AT THE HOLDER'S OWN | | RISK WITH THE BUILDING OPERATION AND | | WITHOUT ASSURANCE THAT A PERMIT FOR THE ENTIRE | | STRUCTURE WILL BE GRANTED. CORRECTIONS MAY BE | | REQUIRED TO MEET THE REQUIREMENTS OF THE TECHNICAL | | CODES. THIS PROVISION IS ONLY FOR THE | | FLORIDA BUILDING CODE. ALL OTHER AGENCY APPROVALS | | NECESSARY FOR CONSTRUCTION MUST BE SECURED | | PRIOR TO THIS PROVISION BEING APPLIED. | | | | | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2021-07-13 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-07-13 |
Time |
12:57 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-07-08 |
Time |
13:19 |
Sent To |
|
|
Notes |
2021-07-13 09:49:09 | NEW RESIDENTIAL HI RISE "FOUNDATION ONLY" | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | | | CORRECTIONS NEEDED - INCLUDED ARE COMMENTS PROVIDED BY | | ROBERT MCDOUGAL THAT WERE NOT CORRECTED | | | | 1)A PORTION OF THE PROPERTY IS LOCATED IN AN AE FLOOD | | ZONE WHICH IS A SPECIAL FLOOD HAZARD AREA. IT APPEARS | | THAT THE BUILDING AND THE EQUIPMENT SERVICING IT ARE | | NOT LOCATED IN THE AE FLOOD ZONE. IT APPEARS THAT SHEET | | C5.00 HAS THE X AND X500 FLOOD ZONES REVERSED. FROM | | EAST TO WEST THE FLOOD ZONES ARE AE, X500 AND X. PLEASE | | CORRECT. | | | | 2) ON SHEET 00.200 UNDER BUILDING TYPE THAT REFERENCES | | THE 2010 FBC AND THIS PROJECT FALLS UNDER THE 2017 FBC. | | | | 3) AN MOT PLAN IS REQUIRED TO BE APPROVED BEFORE PERMIT | | ISSUANCE. IN ADDITION TO TRAFFIC CONTROL, THE PLAN | | SHOULD INCLUDE LOCATION OF STAGING AREAS, CONSTRUCTION | | TRAILER LOCATIONS, EMPLOYEE PARKING DURING | | CONSTRUCTION, EMERGENCY FIRE DEPARTMENT ACCESS, SITE | | FENCING (SAFEGUARDS DURING CONSTRUCTION), HOURS OF | | WORK, ETC. FBC 107 | | | | 4) THIS IS A THRESHOLD BUILDING. SUBMIT THE REQUIRED | | THRESHOLD DOCUMENTS WITH ORIGINAL SIGNATURES AND COMPLY | | WITH THE OTHER THRESHOLD REQUIREMENTS. THRESHOLD | | BUILDING / FL S. S. 553.71(7) "THRESHOLD BUILDING" | | MEANING ANY BUILDING WHICH IS GREATER THAN (3) STORIES | | OR 50 FT. IN HEIGHT, OR WHICH HAS AN ASSEMBLY OCCUPANCY | | CLASSIFICATION AS DEFINED IN THE FLORIDA BUILDING CODE | | WHICH EXCEEDS 5,000 SQ. FT. IN AREA AND AN OCCUPANT | | CONTENT OF GREATER THAN 500 PERSONS. | | | | B) THRESHOLD INSPECTOR: WPB AMENDMENT 110.8.1 W.P.B. | | CONSTRUCTION SERVICES DEPARTMENT REQUEST FOR THRESHOLD | | BUILDINGS A SPECIAL INSPECTOR AS REQUIRED BY 553.79(5) | | FLORIDA STATUTES TO THE MINIMUM INSPECTIONS REQUIRED BY | | THIS CODE. THE THRESHOLD INSPECTION FORMS ARE REQUIRED | | TO BE FILED OUT BY ALL PARTIES WITH INTEREST, NOTARIZED | | AND RETURNED TO THIS OFFICE, AND REVIEWED AND APPROVED | | BEFORE PERMIT ISSUANCE WILL TAKE PLACE. | | | | C) THRESHOLD BLDG. REQUIRED STATEMENT: W.P.B. AMENDMENT | | 110.8.4.4 ALL PLANS FOR THE BUILDING WHICH ARE REQUIRED | | TO BE SIGNED AND SEALED BY THE ARCHITECT OR ENGINEER OF | | RECORD CONTAIN A STATEMENT THAT, TO THE BEST OF THE | | ARCHITECT'S OR ENGINEER'S KNOWLEDGE, THE PLANS AND | | SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM | | BUILDING CODES AND THE APPLICABLE FIRE-SAFETY STANDARDS | | AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH | | THIS SECTION AND CHAPTER 633 FLORIDA STATUTES. | | | | D) FOR THE SPECIAL INSPECTOR PLEASE PROVIDE A RESUME OF | | INSPECTION EXPERIENCE ON PREVIOUS PROJECT. THE RESUME | | MUST BE ACCOMPANIED BY ALL CERTIFICATES AS SPECIFIED | | HEREIN. THE BUILDING OFFICIAL OR HIS DESIGNEE WILL | | REVIEW THE RESUME. AFTER THE RESUME IS REVIEWED, AN | | INTERVIEW WILL BE SCHEDULED. UNDER NO CIRCUMSTANCES | | WILL AN INSPECTOR BE INTERVIEWED FOR WORK WITHOUT FIRST | | MEETING THE ABOVE CRITERIA. | | | | E) THE CONTRACTOR WILL PRODUCE A JOB SUMMARY OR HISTORY | | FOR THIS TYPE OF CONSTRUCTION. | | | | J) PLEASE CONTACT ME WITH AN EMAIL ADDRESS AND I WILL | | BE HAPPY TO SEND YOU A COPY OF THE CURRENT (OCTOBER | | 2018) GUIDELINES AND POLICIES FOR PROJECTS CONCERNING | | THRESHOLD/SPECIAL INSPECTORS AND RESIDENT INSPECTORS. | | | | 5) THE PILE INSTALLATION PLANS ARE REQUIRED TO BE | | SUBMITTED AND APPROVED BY THE ENGINEER OF RECORD FOR | | THE PROJECT PRIOR TO COMMENCEMENT OF OPERATIONS. FBC | | 107 | | | | 6) ON SHEET S0-001, THE MEAN ROOF HEIGHT WAS LEFT BLANK | | UNDER THE WIND CRITERIA DESIGN DATA. FBC 107 | | | | 7) SOME OF THE PLANS, SUCH AS THE DELIVERY MANAGEMENT | | PLANS, ARE MARKED NOT FOR CONSTRUCTION. PLANS THAT ARE | | SUBMITTED FOR THE PURPOSE OF OBTAINING A PERMIT CAN NOT | | HAVE THIS STATEMENT ON THEM. FBC 107 | | | | 8) NOTE #8 ON SHEET A1.1B1 STATES THAT THE MINIMUM | | CLEARANCE ABOVE PARKING STALLS IS 7'-0" AFF. FBC | | ACCESSIBILITY SECTION 502.5 REQUIRES THE VERTICAL | | CLEARANCE FOR ACCESSIBILE VAN PARKING SPACES, ACCESS | | AISLES AND VECHICULAR ROUTES IS 98" OR 8'- 2". | | | | 9) IN ORDER TO PREVENT BEING OVER CHARGED FOR THE | | BUILDING PERMITS, PROVIDE A COST BREAKDOWN OF THE | | PROJECT. SEPARATE THE COSTS ASSOCIATED WITH THE | | FOUNDATION PERMIT FROM THE ITEMS THAT REQUIRE SEPARATE | | PERMITS. FBC 109 | | | | 10) IN ORDER TO DETERMINE PERCENTAGE OF ALLOWABLE | | OPENINGS, SUBMIT A SITE PLAN THAT SHOWS THE DISTANCE | | FROM THE EXTERIOR WALLS OF THE BUILDING TO PROPERTY | | LINES. FBC 705.8 | | | | 11) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A | | RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE | | CITY RE-SUBMITTAL FORM. ADDITIONAL COMMENTS MAY BE | | GENERATED BY THE RESPONSES. | | | | 12) SOME FLOOR PLANS NEED TO COMPLY WITH FBC 1016.2 | | EGRESS THROUGH INTERVENING SPACES. | | EGRESS THROUGH INTERVENING SPACES SHALL COMPLY WITH | | THIS SECTION. | | 1.EXIT ACCESS THROUGH AN ENCLOSED ELEVATOR LOBBY IS | | PERMITTED. ACCESS TO NOT LESS THAN ONE OF THE REQUIRED | | EXITS SHALL BE PROVIDED WITHOUT TRAVEL THROUGH THE | | ENCLOSED ELEVATOR LOBBIES REQUIRED BY SECTION 3006. | | | | 13) SURVEY SHOWS PROPERTY IN A AE 6 - PLEASE PROVIDE A | | PROPOSED ELEVATION CERTIFICATE FBC WPB 107.3.5.1.1 (1) | | | | 14) WILL NEED BUILDING OFFICIAL APPROVAL FOR THE | | FOUNDATION ONLY - FBC WPB 105.13 PHASED PERMIT | | APPROVAL. AFTER SUBMITTAL OF THE APPROPRIATE | | CONSTRUCTION DOCUMENTS, | | THE BUILDING OFFICIAL IS AUTHORIZED TO ISSUE A PERMIT | | FOR THE CONSTRUCT ION OF FOUNDATIONS OR ANY OTHER | | PART OF A BUILDING OR STRUCTURE BEFORE THE CONSTRUCTION | | DOCUMENTS FOR THE WHOLE BUILDING OR STRUCTURE | | HAVE BEEN SUBMITTED. THE HOLDER OF SUCH PERMIT FOR THE | | FOUNDATION OR OTHER PARTS OF A | | BUILDING OR STRUCTURE SHALL PROCEED AT THE HOLDER'S OWN | | RISK WITH THE BUILDING OPERATION AND | | WITHOUT ASSURANCE THAT A PERMIT FOR THE ENTIRE | | STRUCTURE WILL BE GRANTED. CORRECTIONS MAY BE | | REQUIRED TO MEET THE REQUIREMENTS OF THE TECHNICAL | | CODES. THIS PROVISION IS ONLY FOR THE | | FLORIDA BUILDING CODE. ALL OTHER AGENCY APPROVALS | | NECESSARY FOR CONSTRUCTION MUST BE SECURED | | PRIOR TO THIS PROVISION BEING APPLIED. | | | | | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2020-06-08 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-06-08 |
Time |
09:20 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-06-05 |
Time |
08:17 |
Sent To |
|
|
Notes |
2020-06-19 15:25:46 | ADDITIONAL BUILDING REVIEW COMMENTS. | | | | ****CORRECTIONS**** | | | | ROBERT MCDOUGAL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6714 | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | | | THE FOUNDATION PERMIT HAS BEEN DENIED FOR THE FOLLOWING | | REASONS. | | | | 1) THE PERMIT TO CONSTRUCT THE BUILDING HAS NOT BEEN | | APPLIED FOR AT THIS TIME. TYPICALLY THE PERMIT TO | | CONSTRUCT THE BUILDING HAS BEEN APPLIED FOR AND THE | | PLANS FOR CONSTRUCTION HAVE REVIEWED BEFORE A PERMIT | | FOR A FOUNDATION ONLY PERMIT IS APPLIED FOR. UNLESS THE | | PLANS FOR THE BUILDING HAVE BEEN REVIEWED AND APPROVED, | | THE FOUNDATION ONLY PERMIT WILL BE ISSUED AS A PROCEED | | AT YOUR ON RISK PERMIT. FBC 107.3.3 PHASED APPROVAL. | | (SEE ALSO SECTION 105.13.) THE BUILDING OFFICIAL IS | | AUTHORIZED TO ISSUE A PERMIT FOR THE CONSTRUCTION OF | | FOUNDATIONS OR ANY OTHER PART OF A BUILDING OR | | STRUCTURE BEFORE THE CONSTRUCTION DOCUMENTS FOR THE | | WHOLE BUILDING OR STRUCTURE HAVE BEEN SUBMITTED, | | PROVIDED THAT ADEQUATE INFORMATION AND DETAILED | | STATEMENTS HAVE BEEN FILED COMPLYING WITH PERTINENT | | REQUIREMENTS OF THIS CODE. THE HOLDER OF SUCH PERMIT | | FOR THE FOUNDATION OR OTHER PARTS OF A BUILDING OR | | STRUCTURE SHALL PROCEED AT THE HOLDER'S OWN RISK | | WITH THE BUILDING OPERATION AND WITHOUT ASSURANCE THAT | | A PERMIT FOR THE ENTIRE STRUCTURE WILL BE GRANTED. THIS | | PROVISION ONLY APPLIES TO THE FLORIDA BUILDING CODE; | | ALL OTHER AGENCY | | APPROVALS NECESSARY FOR CONSTRUCTION MUST BE SECURED | | PRIOR TO THIS PROVISION BEING APPLIED. | | | | 2)A PORTION OF THE PROPERTY IS LOCATED IN AN AE FLOOD | | ZONE WHICH IS A SPECIAL FLOOD HAZARD AREA. IT APPEARS | | THAT THE BUILDING AND THE EQUIPMENT SERVICING IT ARE | | NOT LOCATED IN THE AE FLOOD ZONE. IT APPEARS THAT SHEET | | C5.00 HAS THE X AND X500 FLOOD ZONES REVERSED. FROM | | EAST TO WEST THE FLOOD ZONES ARE AE, X500 AND X. PLEASE | | CORRECT. | | | | 3) ON SHEET 00.200 UNDER BUILDING TYPE THAT REFERENCES | | THE 2010 FBC AND THIS PROJECT FALLS UNDER THE 2017 FBC. | | | | 4) THIS PROJECT EXPANDS OVER MULTIPLE LOTS OR PARCELS | | OF LAND. THIS WILL HAVE TO BE ADDRESSED PRIOR TO PERMIT | | ISSUANCE. FBC 107.2.1 | | | | 5) AN MOT PLAN IS REQUIRED TO BE APPROVED BEFORE PERMIT | | ISSUANCE. IN ADDITION TO TRAFFIC CONTROL, THE PLAN | | SHOULD INCLUDE LOCATION OF STAGING AREAS, CONSTRUCTION | | TRAILER LOCATIONS, EMPLOYEE PARKING DURING | | CONSTRUCTION, EMERGENCY FIRE DEPARTMENT ACCESS, SITE | | FENCING (SAFEGUARDS DURING CONSTRUCTION), HOURS OF | | WORK, ETC. FBC 107 | | | | 6) THIS IS A THRESHOLD BUILDING. SUBMIT THE REQUIRED | | THRESHOLD DOCUMENTS WITH ORIGINAL SIGNATURES AND COMPLY | | WITH THE OTHER THRESHOLD REQUIREMENTS. THRESHOLD | | BUILDING / FL S. S. 553.71(7) "THRESHOLD BUILDING" | | MEANING ANY BUILDING WHICH IS GREATER THAN (3) STORIES | | OR 50 FT. IN HEIGHT, OR WHICH HAS AN ASSEMBLY OCCUPANCY | | CLASSIFICATION AS DEFINED IN THE FLORIDA BUILDING CODE | | WHICH EXCEEDS 5,000 SQ. FT. IN AREA AND AN OCCUPANT | | CONTENT OF GREATER THAN 500 PERSONS. | | | | A)FBC (CITY AMENDMENTS)110.8.1 THRESHOLD INSPECTION | | PLAN. THE ENFORCING AGENCY SHALL REQUIRE A SPECIAL | | INSPECTOR TO PERFORM STRUCTURAL INSPECTIONS ON A | | THRESHOLD BUILDING PURSUANT TO A STRUCTURAL INSPECTION | | PLAN PREPARED BY THE ENGINEER OF RECORD. THE STRUCTURAL | | INSPECTION PLAN MUST BE SUBMITTED TO THE ENFORCING | | AGENCY PRIOR TO THE ISSUANCE OF A BUILDING PERMIT FOR | | THE CONSTRUCTION OF A THRESHOLD BUILDING. THE PURPOSE | | OF THE STRUCTURAL INSPECTION PLAN IS TO PROVIDE | | SPECIFIC INSPECTION PROCEDURES AND SCHEDULES SO THAT | | THE BUILDING CAN BE ADEQUATELY INSPECTED FOR COMPLIANCE | | WITH THE PERMITTED DOCUMENTS. (I SAW THAT A THRESHOLD | | INSPECTION PLAN IS PROVIDED ON SHEET S0-003.) | | | | B) THRESHOLD INSPECTOR: WPB AMENDMENT 110.8.1 W.P.B. | | CONSTRUCTION SERVICES DEPARTMENT REQUEST FOR THRESHOLD | | BUILDINGS A SPECIAL INSPECTOR AS REQUIRED BY 553.79(5) | | FLORIDA STATUTES TO THE MINIMUM INSPECTIONS REQUIRED BY | | THIS CODE. THE THRESHOLD INSPECTION FORMS ARE REQUIRED | | TO BE FILED OUT BY ALL PARTIES WITH INTEREST, NOTARIZED | | AND RETURNED TO THIS OFFICE, AND REVIEWED AND APPROVED | | BEFORE PERMIT ISSUANCE WILL TAKE PLACE. | | | | C) THRESHOLD BLDG. REQUIRED STATEMENT: W.P.B. AMENDMENT | | 110.8.4.4 ALL PLANS FOR THE BUILDING WHICH ARE REQUIRED | | TO BE SIGNED AND SEALED BY THE ARCHITECT OR ENGINEER OF | | RECORD CONTAIN A STATEMENT THAT, TO THE BEST OF THE | | ARCHITECT'S OR ENGINEER'S KNOWLEDGE, THE PLANS AND | | SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM | | BUILDING CODES AND THE APPLICABLE FIRE-SAFETY STANDARDS | | AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH | | THIS SECTION AND CHAPTER 633 FLORIDA STATUTES. | | | | D) FOR THE SPECIAL INSPECTOR PLEASE PROVIDE A RESUME OF | | INSPECTION EXPERIENCE ON PREVIOUS PROJECT. THE RESUME | | MUST BE ACCOMPANIED BY ALL CERTIFICATES AS SPECIFIED | | HEREIN. THE BUILDING OFFICIAL OR HIS DESIGNEE WILL | | REVIEW THE RESUME. AFTER THE RESUME IS REVIEWED, AN | | INTERVIEW WILL BE SCHEDULED. UNDER NO CIRCUMSTANCES | | WILL AN INSPECTOR BE INTERVIEWED FOR WORK WITHOUT FIRST | | MEETING THE ABOVE CRITERIA. | | | | E) THE CONTRACTOR WILL PRODUCE A JOB SUMMARY OR HISTORY | | FOR THIS TYPE OF CONSTRUCTION. | | | | F) NOTE: FOR DIGITAL PLANS, AFTER PERMIT ISSUANCE, | | PLEASE E-MAIL THE PERMIT LIBRARIAN OF THE PERMIT BEING | | ISSUED, THE PERMIT LIBRARIAN WILL THEN E-MAIL YOU THE | | APPROVED AND BATCH STAMPED PLANS SO YOU MAY PRINT YOUR | | PLANS, TWO SETS OF PLANS WILL NEED TO BE PRINTED IN | | COLOR, (1) FOR THE THRESHOLD INSPECTOR, THE OTHER FOR | | THE MEP INSPECTORS OTHER PLANS YOU WISH TO PRINT MAYBE | | IN BLACK & WHITE. | | | | G) 110.8.4.3 ALL SHORING AND RESHORING PROCEDURES, | | PLANS AND DETAILS SHALL BE SUBMITTED TO THE ENFORCEMENT | | AGENCY FOR RECORDKEEPING. EACH SHORING AND RESHORING | | INSTALLATION SHALL BE SUPERVISED, INSPECTED AND | | CERTIFIED TO BE IN COMPLIANCE WITH THE SHORING | | DOCUMENTS BY THE CONTRACTOR. | | | | H) PLEASE CALL THE CITY OF WEST PALM BEACH'S AUTOMATED | | TELEPHONE INSPECTIONS LINE (561) 805-6700 FOR ALL | | BUILDING INSPECTIONS FOR AUDITING OF JOBSITE | | INSPECTIONS WITHOUT THIS THE PERMIT EXPIRES IN 6 | | MONTHS, ABANDONMENT OF JOB, NO INSPECTION ACTIVITY. | | | | I) 110.8 THRESHOLD BUILDINGS, OPERATING GUIDELINES FOR | | THRESHOLD INSPECTORS #25. ASSURE THAT THE DESIGNER HAS | | REQUIRED ON THE PLANS OR SPECIFICATIONS ONE MATERIAL, | | APPROVED FOR FIRE STOPPING PENETRATIONS, FOR WALLS AND | | CEILINGS. | | | | J) PLEASE CONTACT ME WITH AN EMAIL ADDRESS AND I WILL | | BE HAPPY TO SEND YOU A COPY OF THE CURRENT (OCTOBER | | 2018) GUIDELINES AND POLICIES FOR PROJECTS CONCERNING | | THRESHOLD/SPECIAL INSPECTORS AND RESIDENT INSPECTORS. | | | | 7) THE PILE INSTALLATION PLANS ARE REQUIRED TO BE | | SUBMITTED AND APPROVED BY THE ENGINEER OF RECORD FOR | | THE PROJECT PRIOR TO COMMENCEMENT OF OPERATIONS. FBC | | 107 | | | | 8) ON SHEET S0-001, THE MEAN ROOF HEIGHT WAS LEFT BLANK | | UNDER THE WIND CRITERIA DESIGN DATA. FBC 107 | | | | 9) SOME OF THE PLANS, SUCH AS THE DELIVERY MANAGEMENT | | PLANS, ARE MARKED NOT FOR CONSTRUCTION. PLANS THAT ARE | | SUBMITTED FOR THE PURPOSE OF OBTAINING A PERMIT CAN NOT | | HAVE THIS STATEMENT ON THEM. FBC 107 | | | | 10) NOTE #8 ON SHEET A1.1B1 STATES THAT THE MINIMUM | | CLEARANCE ABOVE PARKING STALLS IS 7'-0" AFF. FBC | | ACCESSIBILITY SECTION 502.5 REQUIRES THE VERTICAL | | CLEARANCE FOR ACCESSIBILE VAN PARKING SPACES, ACCESS | | AISLES AND VECHICULAR ROUTES IS 98" OR 8'- 2". | | | | 11) SHOW THAT THERE IS AT LEAST ONE ELEVATOR THAT IS | | CAPBALE OF ACCOMODATING AN AMBULANCE STRETCHER IN THE | | HORIZONTAL OPEN POSITION AS REQUIRED BY FBC 3002.4 | | | | 12) FBC 3007.6 REQUIRES A FIRE SERVICE ACCESS ELEVATOR | | TO OPEN INTO A FIRE SERVICE ACCESS ELEVATOR LOBBY. FBC | | 3007.6.4 REQUIRES THE LOBBY SIZE TO BE A MINIMUM OF 150 | | SQUARE FEET WITH NO DIMENSION LESS THAN 8 FEET IN | | DIMENSION. THE FIRE SERVICE ACCESS ELEVATOR LOBBIES | | HAVE A DIMENSION OF 6 FEET. DOES THIS DESIGN USE FBC | | 3007.6 EXCEPTION #2 WHICH ALLOWS A 6 FT WIDE, 150 SQFT | | EXIT ACCESS CORRIDOR WITH THE PRESSURIZED FIRE ACCESS | | ELEVATORS AND FLOOR TO FLOOR SMOKE CONTROL? PLEASE | | CLARIFY. | | | | 13) IN ORDER TO PREVENT BEING OVER CHARGED FOR THE | | BUILDING PERMITS, PROVIDE A COST BREAKDOWN OF THE | | PROJECT. SEPARATE THE COSTS ASSOCIATED WITH THE | | FOUNDATION PERMIT FROM THE ITEMS THAT REQUIRE SEPARATE | | PERMITS. FBC 109 | | | | 14) IN ORDER TO DETERMINE PERCENTAGE OF ALLOWABLE | | OPENINGS, SUBMIT A SITE PLAN THAT SHOWS THE DISTANCE | | FROM THE EXTERIOR WALLS OF THE BUILDING TO PROPERTY | | LINES. FBC 705.8 | | | | 15) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A | | RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE | | CITY RE-SUBMITTAL FORM. ADDITIONAL COMMENTS MAY BE | | GENERATED BY THE RESPONSES. | | | | | | | 2020-06-08 09:20:53 | NEW RESIDENTIAL HI RISE "FOUNDATION ONLY" | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | 1) EXIT STAIRWAYS SHALL TERMINATE AT AN EXIT DISCHARGE | | OR A PUBLIC WAY. THE STAIRWAYS CANNOT CONTINUE TO THE | | BASEMENT NOR SHALL THEY CONTINUE UP FROM THE BASEMENT | | BEYOND THE EXIT DISCHARGE. FBC 1023.3 -AND- 1023.11.1 | | 2) DOORS SHOWN IN STAIRWAY "B" DRAWING (LS1.102) NEED | | TO COMPLY WITH FBC 1010.1.8 | | 3) PLEASE SHOW THE TERMITE PROTECTION REQUIREMENT PER | | FBC 1816 | | 4) PLEASE COMPLETE A "THRESHOLD/SPECIAL INSPECTOR | | AGREEMENT OF UNDERSTANDING" FORM. ( FORMS CAN BE | | OBTAINED BY E MAILING [email protected]) | | 5) FBC 1016.2 EGRESS THROUGH INTERVENING SPACES. | | EGRESS THROUGH INTERVENING SPACES SHALL COMPLY WITH | | THIS SECTION. | | 1.EXIT ACCESS THROUGH AN ENCLOSED ELEVATOR LOBBY IS | | PERMITTED. ACCESS TO NOT LESS THAN ONE OF THE REQUIRED | | EXITS SHALL BE PROVIDED WITHOUT TRAVEL THROUGH THE | | ENCLOSED ELEVATOR LOBBIES REQUIRED BY SECTION 3006. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
4 |
Status |
P |
Date |
2022-02-18 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2022-02-18 |
Time |
09:27 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2022-02-18 |
Time |
08:45 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2021-10-04 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2021-10-04 |
Time |
16:49 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2021-10-04 |
Time |
16:45 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2021-06-17 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2021-06-17 |
Time |
10:59 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2021-06-17 |
Time |
08:44 |
Sent To |
|
|
Notes |
2021-06-17 11:00:58 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | FLORIDA BUILDING CODE 2020 7TH EDITION | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED | | NFPA 70 2017 EDITION | | | | JAKE LEAHY BN, BU, PX | | ELECTRICAL PLANS EXAMINER II | | 561-805-6713 | | [email protected] | | | | I JUST NEED A PLAN SHOWING WHAT YOU PLAN ON PUTTING IN | | THE SLAB. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2020-06-09 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-06-09 |
Time |
11:01 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-06-09 |
Time |
09:33 |
Sent To |
|
|
Notes |
2020-06-09 11:33:04 | CODES IN EFFECT: | | FBC = FLORIDA BUILDING CODE 2014 5TH EDITION | | FBC CE = FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 | | 5TH EDITION | | FBC RE = FLORIDA RESIDENTIAL CODE 2014 5TH EDITION, | | PART VIII ELECTRICAL | | NEC = NFPA 70 2011 EDITION, NATIONAL ELECTRICAL CODE | | FS = FLORIDA STATUTES | | | | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | FLORIDA BUILDING CODE 2017 6TH EDITION | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | NFPA 70 2014 EDITION | | | | JAKE LEAHY BN, BU, PX | | ELECTRICAL PLANS EXAMINER II | | 561-805-6713 | | [email protected] | | | | NEED TO SHOW WHAT YOU ARE GOING TO INSTALL. | | | | PLEASE SUBMIT A RISER DIAGRAM FOR THE SERVICE AND | | FEEDERS. |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
6 |
Status |
P |
Date |
2022-03-23 |
|
|
Cont ID |
|
Sent By |
rrossano |
Date |
2022-03-23 |
Time |
|
Rev Time |
0.00 |
Received By |
rrossano |
Date |
2022-03-23 |
Time |
|
Sent To |
|
|
Notes |
2022-03-23 13:41:28 | ACACIA ALLEY DEDICATION TO CITY COMPLETED. | | | | | | THANKS, | | | | RICK ROSSANO, SENIOR PROJECT COORDINATOR, | | CITY OF WPB ENGINEERING SERVICES DEPARTMENT | | DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE: | | (561) 246-9525 | | EMAIL: [email protected] | | HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING- | | STANDARDS-DETAILS | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
5 |
Status |
F |
Date |
2022-02-07 |
|
|
Cont ID |
|
Sent By |
rrossano |
Date |
2022-02-07 |
Time |
|
Rev Time |
0.00 |
Received By |
rrossano |
Date |
2022-02-07 |
Time |
|
Sent To |
|
|
Notes |
2022-02-07 10:26:41 | UNDER FORMAL ENGINEERING REVIEW. |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
4 |
Status |
F |
Date |
2021-11-29 |
|
|
Cont ID |
|
Sent By |
rrossano |
Date |
2021-11-29 |
Time |
|
Rev Time |
0.00 |
Received By |
rrossano |
Date |
2021-11-29 |
Time |
|
Sent To |
|
|
Notes |
2021-11-29 14:12:07 | UNDER FORMAL ENGINEERING SUBMITTAL REVIEW. |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
3 |
Status |
F |
Date |
2021-09-17 |
|
|
Cont ID |
|
Sent By |
rrossano |
Date |
2021-09-17 |
Time |
|
Rev Time |
0.00 |
Received By |
rrossano |
Date |
2021-09-17 |
Time |
|
Sent To |
|
|
Notes |
2021-09-17 08:09:03 | UNDER FORMAL ENGINEERING REVIEW. |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
F |
Date |
2021-06-23 |
|
|
Cont ID |
|
Sent By |
rrossano |
Date |
2021-06-23 |
Time |
|
Rev Time |
0.00 |
Received By |
rrossano |
Date |
2021-06-23 |
Time |
|
Sent To |
|
|
Notes |
2021-06-23 08:04:24 | UNDER REVIEW AS FORMAL ENGINEERING SUBMITTAL E20080015. |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
F |
Date |
2020-06-02 |
|
|
Cont ID |
|
Sent By |
rrossano |
Date |
2020-06-02 |
Time |
|
Rev Time |
|
Received By |
rrossano |
Date |
2020-06-02 |
Time |
|
Sent To |
|
|
Notes |
2020-06-02 11:44:37 | PLEASE SUBMIT PLANS FOR FORMAL ENGINEERING SUBMITTAL | | REVIEW. |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
4 |
Status |
P |
Date |
2021-11-10 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2021-11-10 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2021-11-10 |
Time |
15:02 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
3 |
Status |
P |
Date |
2021-09-09 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2021-09-09 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2021-09-09 |
Time |
12:35 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2021-06-10 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2021-06-10 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2021-06-10 |
Time |
16:07 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
F |
Date |
2020-05-27 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2020-05-27 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2020-05-26 |
Time |
13:00 |
Sent To |
|
|
Notes |
2020-05-26 13:48:59 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | 1) SHEET A 1.100 & LS 1.101 - THERE IS AN INDIICATION O | | A FFIRE PUMP ROOM; HOWEVER, A FLOOR DRAIN COULD NOT BE | | VERIFIED. | | | | PER NFPA 20 STANDARD FOR THE | | INSTALLATION OF STATIONARY PUMPS FOR FIRE PROTECTION | | 2013 EDITION | | | | 4.12.7* DRAINAGE. | | 4.12.7.1 FLOORS SHALL BE PITCHED FOR ADEQUATE DRAINAGE | | OF ESCAPING | | WATER AWAY FROM CRITICAL EQUIPMENT SUCH AS THE PUMP, | | DRIVER, CONTROLLER, AND SO FORTH. | | 4.12.7.2 THE PUMP ROOM OR PUMP HOUSE SHALL BE PROVIDED | | WITH A FLOOR DRAIN THAT WILL DISCHARGE TO A FROST-FREE | | LOCATION. | | | | PLEASE PROVIDE DETAILS | | | | | | 2) SHEET C 1. - THERE ARE INDICATION OF UNDERGROUND | | FIRE LINES AND FIRE LINE DDCV. | | | | ALL FIRE LINE UNDERGROUND SHALL BE INSTALLED AND | | INSPECTED PER NFPA 24 STANDARD FOR THE INSTALLATION OF | | PRIVATE FIRE SERVICE MAINS AND | | THEIR APPURTENANCES 2013 EDITION, UNDER SEPARATE PERMIT | | AND SHOP DRAWINGS. | | | | 1.1 SCOPE. | | 1.1.1 THIS STANDARD SHALL COVER THE MINIMUM | | REQUIREMENTS | | FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND | | THEIR APPURTENANCES | | SUPPLYING THE FOLLOWING: | | (1) AUTOMATIC SPRINKLER SYSTEMS | | (2) OPEN SPRINKLER SYSTEMS | | (3) WATER SPRAY FIXED SYSTEMS | | (4) FOAM SYSTEMS | | (5) PRIVATE HYDRANTS | | (6) MONITOR NOZZLES OR STANDPIPE SYSTEMS WITH REFERENCE | | TO | | WATER SUPPLIES | | (7) HOSE HOUSES | | 1.1.2 THIS STANDARD SHALL APPLY TO COMBINED SERVICE | | MAINS | | USED TO CARRY WATER FOR FIRE SERVICE AND OTHER USES. | | | | CHAPTER 4 GENERAL REQUIREMENTS | | 4.1* PLANS. | | 4.1.1 WORKING PLANS SHALL BE SUBMITTED FOR APPROVAL TO | | THE | | AUTHORITY HAVING JURISDICTION BEFORE ANY EQUIPMENT IS | | INSTALLED | | OR REMODELED. | | | | | | PLEASE REVIEW AND ACKNOWLEDGE COMPLIANCE WHERE | | APPLICABLE. | | | | | | | | 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | ABOVE. | | | | | | | | 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | RE-SUBMITTAL OF THE ABOVE. | | | | | | PETER LEDUC | | FIRE MARSHAL | | 561-804-4709 | | [email protected] |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2022-04-14 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2022-04-14 |
Time |
13:10 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2022-03-22 |
Time |
07:24 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2022-02-18 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2022-02-18 |
Time |
09:27 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2022-02-04 |
Time |
16:54 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2022-01-20 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2022-01-20 |
Time |
14:41 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2021-11-09 |
Time |
06:43 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2021-10-18 |
|
|
Cont ID |
|
Sent By |
ccarvaja |
Date |
2021-10-15 |
Time |
08:48 |
Rev Time |
0.00 |
Received By |
ccarvaja |
Date |
2021-09-08 |
Time |
11:46 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2021-08-11 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2021-08-11 |
Time |
09:43 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2021-06-09 |
Time |
12:37 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2020-06-18 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2020-06-18 |
Time |
15:40 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2020-05-22 |
Time |
09:11 |
Sent To |
|
|
Notes |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
2 |
Status |
N |
Date |
2022-04-14 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2022-04-14 |
Time |
13:48 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2022-04-14 |
Time |
13:48 |
Sent To |
|
|
Notes |
2022-04-14 13:48:53 | IMPACT FEES WILL BE DEFERRED TO NEW BUILDING PERMIT | | 21071625 |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
1 |
Status |
F |
Date |
2020-06-08 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-06-08 |
Time |
09:53 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-06-08 |
Time |
09:53 |
Sent To |
|
|
Notes |
2020-06-08 09:54:35 | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS | | OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM | | CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS | | TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF | | | | UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE | | RECEIPT TO YOUR PROJECT OR EMAIL IT TO | | [email protected] . | | |
|
|
Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
Rev No |
1 |
Status |
N |
Date |
2020-06-08 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-06-08 |
Time |
09:39 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-06-08 |
Time |
09:39 |
Sent To |
|
|
Notes |
2020-06-08 09:39:44 | SITE PLAN C5.00 SHOWS BUILDING IN FLOOD ZONE "X" |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2022-02-15 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2022-02-15 |
Time |
07:41 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2022-02-15 |
Time |
07:41 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2021-07-14 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2021-07-14 |
Time |
11:44 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2021-07-13 |
Time |
15:40 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2020-06-18 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2020-06-18 |
Time |
13:26 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2020-06-16 |
Time |
11:38 |
Sent To |
|
|
Notes |
2020-06-18 13:26:53 | 1) SUBMIT PLUMBING FIXTURE CALCULATIONS FOR THE MINIMUM | | NUMBER OF REQUIRED PLUMBING FIXTURES BASED ON THE | | OCCUPANT LOADS OF THE DIFFERENT AREAS ON LEVEL 01.PER | | MY CALCULATIONS BASED ON THE OCCUPANT LOADS SHOWN ON | | SHT.LS1.101, SEPARATE FACILITIES SHALL BE REQUIRED FOR | | MALES AND FEMALES PER FBC-PLUMBING SEC.403.2. | | 2) PER MY CALCULATIONS AND TABLE 403.1 OF FBC-PLUMBING, | | 2 WATER CLOSETS AND 1 LAVATORY ARE REQUIRED FOR THE | | MALES AND 3 WATER CLOSETS AND 1 LAVATORY ARE REQUIRED | | FOR THE FEMALES FOR LEVEL 01. | | 3) SHT. 00.200 - BUILDING TYPE TABLE - THE NOTE AT THE | | BOTTOM REFERS TO THE 2010 FBC. REVISE THE NOTE TO READ | | 2017 FBC. | | 4) SUBMIT FOR ALL THE UNDERSLAB PIPING (SANITARY, | | STORM, ETC.) THAT IS GOING TO BE INSTALLED UNDER THIS | | FOUNDATION PERMIT. ALSO, TAG ALL RISERS FOR | | IDENTIFICATION. WPB AMEND. TO FBC SEC. 107.3.5.1.3. | | 5) SHT. P2.1B2 - TAG ALL RISERS FOR IDENTIFICATION. WPB | | AMEND. TO FBC SEC. 107.2.1. | | 6) SUBMIT DETAILS AND CALCULATIONS FOR THE LINT | | INTERCEPTOR. THE INTERCEPTOR SHALL COMPLY WITH 2017 | | FBC-PLUMBING SEC. 103.6. | | 7) SHT. LS1.101 - SHOW THE SUBCATEGORY OF THE ASSEMBLY | | OCCUPANCY ON THE OCCUPANT LOAD TABLE PER FBC-BUILDING | | SEC. 303 AND TABLE 403.1 OF FBC-PLUMBING. | | NOTE: THESE PLANS WERE REVIEWED FOR THE PLUMBING FOR | | THE FOUNDATION ONLY. A REVIEW WAS NOT PERFORMED FOR | | COMPLIANCE WWITH THE FBC-ACCESSIBILITY OR THE FAIR | | HOUSING ACT GUIDELINES. COMPLIANCE WITH THESE STANDARDS | | WILL BE DONE UNDER THE FULL BUILDING SUBMITTAL REVIEW | | ALONG WITH ALL OTHER REQUIRED CODES, STANDARDS AND | | REGULATIONS. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
6 |
Status |
P |
Date |
2022-03-30 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-03-30 |
Time |
14:16 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-03-30 |
Time |
14:16 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
5 |
Status |
P |
Date |
2022-02-14 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-02-14 |
Time |
14:13 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-02-14 |
Time |
14:13 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
4 |
Status |
P |
Date |
2021-11-22 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-11-22 |
Time |
10:48 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-11-22 |
Time |
10:47 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
F |
Date |
2021-09-27 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-09-27 |
Time |
13:13 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2021-09-27 12:53:23 | SIGNATURE REVIEW | | | | DRAWINGS LABELED - | | 01.002 - FLAGLER FORTE - S-1-101.PDF | | AND ALL OF THE CIVIL DRAWINGS | | IN PROJECTDOX - DO NOT SHOW AS DIGITALLY SIGNED IN | | ADOBE READER - SIGNED AND SEALED DRAWINGS IN PROJECTDOX | | NEED TO BE DIGITALLY/ELECTRONICALLY SIGNED BY THE | | ENGINEER OR ARCHITECT TO BE USED IN ELECTRONIC PLAN | | REVIEW. (A CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN | | JUST CALLED A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF | | E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES | | NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN | | DROP OFF THE ORIGINAL SIGNED AND SEALED | | DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING | | DIVISION AT THE CITY HALL. | | | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2021-07-13 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-07-13 |
Time |
12:49 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-07-13 |
Time |
12:49 |
Sent To |
|
|
Notes |
2021-07-13 12:50:43 | SURVEYS NEED TO BE ELECTRONICALLY/DIGITALLY SIGNED AND | | SEALED BY THE SURVEYOR TO BE USED IN ELECTRONIC PLAN | | REVIEW. | | REVISED OR ADDED CIVIL DRAWINGS DO NOT SHOW AS | | ELECTRONICALLY SIGNED IN ADOBE READER - SIGNED AND | | SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. - OR - | | IF YOUR ARCHITECT OR ENGINEER DOES NOT HAVE AN | | ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN DROP OFF THE | | ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE | | FRONT DESK IN THE BUILDING DIVISION AT THE CITY HALL. | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2020-06-08 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-06-08 |
Time |
09:37 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-06-08 |
Time |
09:37 |
Sent To |
|
|
Notes |
2020-06-08 09:38:50 | SURVEYS NEED TO BE ELECTRONICALLY/DIGITALLY SIGNED AND | | SEALED BY THE SURVEYOR TO BE USED IN ELECTRONIC PLAN | | REVIEW. |
|
|
Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
Rev No |
5 |
Status |
P |
Date |
2021-11-23 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-11-23 |
Time |
12:42 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-11-23 |
Time |
12:42 |
Sent To |
|
|
Notes |
|
|
Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
Rev No |
4 |
Status |
F |
Date |
2021-11-22 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-11-22 |
Time |
10:13 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-11-22 |
Time |
10:13 |
Sent To |
|
|
Notes |
2021-11-22 10:15:15 | PAGE 8 OF THE SPECIAL INSPECTOR AGREEMENT PACKAGE FORM | | - NEED THE CONTRACTORS SIGNATURE. | | | | | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | |
|
|
Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
Rev No |
3 |
Status |
F |
Date |
2021-09-27 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-09-27 |
Time |
11:42 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-09-27 |
Time |
11:42 |
Sent To |
|
|
Notes |
2021-09-27 11:41:36 | PAGE 8 OF THE SPECIAL INSPECTOR AGREEMENT PACKAGE FORM | | NEEDS TO BE FILLED OUT - THE CONTRACTOR AND THE OWNER | | OF THE PROJECT SIGNATURES FORM. | | | | PLEASE PROVIDE ALL FORMS AND DOCUMENTS AS REQUIRED BY | | THE "GUIDELINES AND POLICIES FOR PROJECTS | | CONCERNING THRESHOLD/SPECIAL INSPECTORS | | AND RESIDENT INSPECTORS" | | YOU CAN E MAIL ME FOR A COPY OF THE GUIDELINES - | | [email protected] | | | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | |
|
|
Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
Rev No |
2 |
Status |
F |
Date |
2021-07-13 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-07-13 |
Time |
12:51 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-07-13 |
Time |
12:50 |
Sent To |
|
|
Notes |
2021-07-13 12:51:18 | ONLY 1 FORM WAS FILLED OUT - PLEASE PROVIDE ALL FORMS | | AND DOCUMENTS AS REQUIRED BY THE "GUIDELINES AND | | POLICIES FOR PROJECTS | | CONCERNING THRESHOLD/SPECIAL INSPECTORS | | AND RESIDENT INSPECTORS" | | YOU CAN E MAIL ME FOR A COPY OF THE GUIDELINES - | | [email protected] |
|
|
Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
Rev No |
1 |
Status |
F |
Date |
2020-06-19 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-06-19 |
Time |
15:31 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-06-19 |
Time |
15:31 |
Sent To |
|
|
Notes |
2020-06-19 15:32:06 | SUBMIT REQUIRED THRESHOLD BUILDING DOCUMENTS. SEE | | BUILDING REVIEW COMMENTS. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
6 |
Status |
P |
Date |
2022-04-14 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2022-04-14 |
Time |
11:58 |
Rev Time |
0.25 |
Received By |
eschneid |
Date |
2022-04-14 |
Time |
11:54 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
5 |
Status |
F |
Date |
2022-02-08 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2022-02-08 |
Time |
17:36 |
Rev Time |
1.00 |
Received By |
eschneid |
Date |
2022-02-08 |
Time |
12:33 |
Sent To |
|
|
Notes |
2022-02-08 17:43:27 | PERMIT WILL STAY IN FAILED STATUS UNTIL THE PLAT IS | | RECORDED AND ACACIA IS DEEDED TO THE CITY AS STATED BY | | THE ENGINEERING DEPARTMENT. | | | | FOUNDATION PERMIT MEETS ZONING CRITERIA. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
4 |
Status |
F |
Date |
2022-01-20 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2022-01-20 |
Time |
14:09 |
Rev Time |
3.00 |
Received By |
eschneid |
Date |
2022-01-20 |
Time |
08:20 |
Sent To |
|
|
Notes |
2022-01-20 14:10:28 | FAILED | | | | PROVIDE WRITTEN RESPONSES TO COMMENTS. | | | | 1) REPEAT COMMENT: RESOLUTION 13-19, WHICH APPROVED THE | | PROJECT INCLUDED THE REQUIREMENT THAT CERTAIN ITEMS | | REQUIRED PRIOR TO THE SUBMITTAL OF THE BUILDING PERMIT | | FOR SITE IMPROVEMENTS, WHICH INCLUDES THE FOUNDATION | | PERMIT. PROVIDE EVIDENCE THAT THE FOLLOWING HAS BEEN | | COMPLETED: | | | | A. ABANDON OR RELOCATE THE FPL EASEMENT ALONG THE SOUTH | | PROPERTY LINE. THE DEVELOPER, BASED ON DISCUSSIONS WITH | | FPL, PRESENTED A TEMPORARY POWER ROUTING PLAN TO CITY | | STAFF; HOWEVER, THE FINAL PLAN AND FPL'S SIGN OFF ARE | | NOT INCLUDED WITH THE RESUBMITTAL. SHEET E1.050 DOES | | NOT SPECIFY WHEN THE EASEMENT WILL BE ABANDONED. ***** | | EVIDENCE THAT THIS CONDITION HAS BEEN MET HAS STILL NOT | | BEEN PROVIDED. ***** | | | | 2) REPEAT COMMENT: PROVIDE INFORMATION ON THE REQUIRED | | CONDITION SURVEY: RESOLUTION 13-19 REQUIRES THAT THE | | DEVELOPER SHALL PERFORM A CONDITION SURVEY OF THE | | ADJOINING PROPERTIES PRIOR TO THE COMMENCEMENT OF ANY | | CONSTRUCTION OR DEMOLITION ACTIVITIES. THE DEVELOPER | | SHALL CONFORM TO THE APPROPRIATE INDUSTRY STANDARDS | | APPROVED BY THE CITY'S BUILDING DIVISION IN MONITORING | | THE VIBRATION EFFECTS ON THE ADJOINING PROPERTIES; THIS | | MAY INCLUDE, BUT IS NOT LIMITED TO, THE PLACEMENT OF | | SEISMIC METERS, INSPECTIONS, AND SIMILAR ACTIVITIES. | | ***** EVIDENCE THAT THIS CONDITION HAS BEEN MET HAS | | STILL NOT BEEN PROVIDED. ***** | | | | 3) REPEAT COMMENT: EV PROVISIONS - ZONING STAFF HAS | | REVIEWED AND NEEDS CLARIFICATION NARRATIVE ON THE EV | | PROVISION. COMMENTS BELOW MAY CHANGE BASED ON THE | | NARRATIVE. THE NARRATIVE SHALL VERIFY THE RESOLUTION | | NO. 13-19 EV REQUIREMENTS. | | | | A. IT APPEARS THAT THE GUEST SPACES ARE ONLY GETTING EV | | LEVEL 1, INSTEAD OF THE LEVEL 2 THAT ARE REQUIRED. | | ***** THE COMMENT RESPONSE STATES THAT ALL EV CHARGING | | STATIONS ARE DESIGNED FOR LEVEL 2 CAPABILITIES AND THAT | | THE ARCHITECT WILL UPDATE LABEL TO REFLECT THE REQUIRED | | LEVEL 2 SPACE. NO NEW PLANS WERE SUBMITTED SHOWING A | | TAG DESIGNATING LEVEL 2 GUEST SPACES TO SHOW COMPLIANCE | | WITH THIS REQUIREMENT. THERE IS A SYMBOL ON THE KEY | | THAT WOULD DESIGNATE LEVEL 2. THIS SYMBOL IS USED ON | | THE BASEMENT LEVEL B2 TO DESIGNATE THE EV LEVEL 2 | | SPACES. ***** | | | | 4) REPEAT COMMENT: THE FOLLOWING DIMENSIONS PROVIDED ON | | SHEET A1.100 (SITE PLAN) DO NOT MATCH THE SAME | | DIMENSIONS ON SHEET A1.01 (GROUND FLOOR PLAN) SUBMITTED | | WITH THE MINOR PLANNED DEVELOPMENT AMENDMENT: | | | | A. WEST SETBACK DIMENSION OF 5 FEET 3 INCHES FOR THE | | GENERATOR PIT. THE MINOR AMENDMENT PLANS SHOW A SETBACK | | DIMENSION OF 5 FEET 6 INCHES AT THE SAME LOCATION. | | STAFF HAS APPROVED THE MINOR PLANNED DEVELOPMENT | | AMENDMENT, SO THIS PLAN MUST BE CORRECTED TO SHOW | | APPROVED CONDITIONS. THIS INCORRECT SETBACK IS ALSO | | SHOWN ON SHEET A1.1B1. | | | | 5) THE ABOVE FOLLOWING ITEMS REQUIRE REVIEW AS SEPARATE | | PERMITS WITH PLANS: | | | | A. THE WALLS, FENCES, GATES AND COLUMNS REQUIRE A | | SEPARATE PERMIT WITH PLANS. | | B. HARDSCAPE, INCLUDING PAVERS, ARTIFICIAL TURF, DOG | | PARK ITEMS, BENCHES/PLAZA AREA, ETC. | | C. LANDSCAPE | | D. IRRIGATION | | E. GENERATOR - PLEASE NOTE THAT THE FULL HEIGHT OF THE | | GENERATOR DOES NOT APPEAR TO BE SCREENED AS REQUIRED BY | | RESOLUTION NO. 13-19. HEDGES MAY NOT EXCEED 10 FEET IN | | HEIGHT, SO YOU WILL NEED TO LOWER THE GENERATOR | | PROFILE. | | F. WATER FEATURES | | G. PARKING STRIPING | | H. SITE LIGHTING, INCLUDING BOLLARDS, NOTE: SINCE | | ACACIA ROAD IS A SEPARATE PARCEL, IT REQUIRES ITS OWN | | PERMIT FOR THE LIGHTING, BUT MAY BE INCLUDED ON ONE SET | | OF PLANS FOR BOTH PERMIT NUMBERS. PHOTOMETRIC PLANS ARE | | REQUIRED WITH THE PERMITS. | | I. BICYCLE RACKS, INCLUDES THE BICYCLE STORAGE ROOM. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | [email protected] | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
F |
Date |
2021-10-15 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2021-10-15 |
Time |
16:48 |
Rev Time |
3.00 |
Received By |
eschneid |
Date |
2021-10-15 |
Time |
14:17 |
Sent To |
|
|
Notes |
2021-10-15 16:55:23 | FAILED | | | | PROVIDE WRITTEN RESPONSES TO COMMENTS. | | | | 1) REPEAT COMMENT: RESOLUTION 13-19, WHICH APPROVED THE | | PROJECT INCLUDED THE REQUIREMENT THAT CERTAIN ITEMS | | REQUIRED PRIOR TO THE SUBMITTAL OF THE BUILDING PERMIT | | FOR SITE IMPROVEMENTS, WHICH INCLUDES THE FOUNDATION | | PERMIT. PROVIDE EVIDENCE THAT THE FOLLOWING HAS BEEN | | COMPLETED: | | | | A. ABANDON OR RELOCATE THE FPL EASEMENT ALONG THE SOUTH | | PROPERTY LINE. THE DEVELOPER, BASED ON DISCUSSIONS WITH | | FPL, PRESENTED A TEMPORARY POWER ROUTING PLAN TO CITY | | STAFF; HOWEVER, THE FINAL PLAN AND FPL'S SIGN OFF ARE | | NOT INCLUDED WITH THE RESUBMITTAL. SHEET E1.050 DOES | | NOT SPECIFY WHEN THE EASEMENT WILL BE ABANDONED. | | | | 2) REPEAT COMMENT: PROVIDE INFORMATION ON THE REQUIRED | | CONDITION SURVEY: RESOLUTION 13-19 REQUIRES THAT THE | | DEVELOPER SHALL PERFORM A CONDITION SURVEY OF THE | | ADJOINING PROPERTIES PRIOR TO THE COMMENCEMENT OF ANY | | CONSTRUCTION OR DEMOLITION ACTIVITIES. THE DEVELOPER | | SHALL CONFORM TO THE APPROPRIATE INDUSTRY STANDARDS | | APPROVED BY THE CITY'S BUILDING DIVISION IN MONITORING | | THE VIBRATION EFFECTS ON THE ADJOINING PROPERTIES; THIS | | MAY INCLUDE, BUT IS NOT LIMITED TO, THE PLACEMENT OF | | SEISMIC METERS, INSPECTIONS, AND SIMILAR ACTIVITIES. | | | | 3) REPEAT COMMENT: EV PROVISIONS - ZONING STAFF HAS | | REVIEWED AND NEEDS CLARIFICATION NARRATIVE ON THE EV | | PROVISION. COMMENTS BELOW MAY CHANGE BASED ON THE | | NARRATIVE. THE NARRATIVE SHALL VERIFY THE RESOLUTION | | NO. 13-19 EV REQUIREMENTS. | | | | A. IT APPEARS THAT THE GUEST SPACES ARE ONLY GETTING EV | | LEVEL 1, INSTEAD OF THE LEVEL 2 THAT ARE REQUIRED. | | | | 4) REPEAT COMMENT: THE SURVEY PREPARED BY MILLER LAND | | SURVEYING PROVIDED WITH THE PERMIT IS NOT THE LATEST | | SURVEY THAT WAS PROVIDED FOR THE SITE PLAN APPROVAL. | | THE SURVEY PROVIDED BY GEOPOINT SURVEYING DOES NOT | | MATCH WHAT WAS PRESENTED AS THE ACCURATE PROPERTY | | BOUNDARIES SHOWN ON THE MILLER LAND SURVEYING SURVEY. | | THE CORRECT, ACCURATE SURVEY IS REQUIRED. | | | | 5) THE FOLLOWING DIMENSIONS PROVIDED ON SHEET A1.100 | | (SITE PLAN) DO NOT MATCH THE SAME DIMENSIONS ON SHEET | | A1.01 (GROUND FLOOR PLAN) SUBMITTED WITH THE MINOR | | PLANNED DEVELOPMENT AMENDMENT ? WEST SETBACK OF 5 FEET | | 3 INCHES FOR THE GENERATOR PIT, NORTH SETBACK OF 20 | | FEET 2 INCHES VIOLATES THE APPROVED SETBACK (ALSO DOES | | NOT MATCH PERMIT SHEET A1.1B1), SOUTH B1 WALL IS | | INCONSISTENT WITH DIMENSION ON SHEET A1.1B1. | | ADDITIONALLY, THE DIMENSIONS TO THE COLUMNS TO THE | | AMENITY DECK HAVE NOT BEEN PROVIDED. NOTE: CHECK ALL | | SETBACKS FOR CONSISTENCY. PERMIT PLAN SHET A1.101 IS | | INCONSISTENT WITH PERMIT PLANS AND THE SAME PLAN | | SUBMITTED WITH THE MINOR AMENDMENT. | | | | 6) THE CIVIL PLANS UPLOADED ON MAY 7, 2021, ARE NOT THE | | LATEST VERSION OF THE CIVIL PLANS THAT HAVE BEEN | | SUBMITTED TO THE CITY. THE MOST CURRENT PLANS NEED TO | | BE WITH THE PERMIT. | | | | 7) THE ABOVE GRADE IMPROVEMENTS REQUIRE REVIEW AS | | SEPARATE PERMITS WITH PLANS: | | | | A. THE WALLS, FENCES, GATES AND COLUMNS REQUIRE A | | SEPARATE PERMIT WITH PLANS. | | B. HARDSCAPE, INCLUDING PAVERS, ARTIFICIAL TURF, DOG | | PARK ITEMS, BENCHES/PLAZA AREA, ETC. | | C. LANDSCAPE | | D. IRRIGATION | | E. GENERATOR - PLEASE NOTE THAT THE FULL HEIGHT OF THE | | GENERATOR DOES NOT APPEAR TO BE SCREENED AS REQUIRED BY | | RESOLUTION NO. 13-19. HEDGES MAY NOT EXCEED 10 FEET IN | | HEIGHT, SO YOU WILL NEED TO LOWER THE GENERATOR | | PROFILE. | | F. WATER FEATURES | | G. PARKING STRIPING | | H. SITE LIGHTING, INCLUDING BOLLARDS, NOTE: SINCE | | ACACIA ROAD IS A SEPARATE PARCEL, IT REQUIRES ITS OWN | | PERMIT FOR THE LIGHTING, BUT MAY BE INCLUDED ON ONE SET | | OF PLANS FOR BOTH PERMIT NUMBERS. PHOTOMETRIC PLANS ARE | | REQUIRED WITH THE PERMITS. | | I. BICYCLE RACKS, INCLUDES THE BICYCLE STORAGE ROOM. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | [email protected] | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
F |
Date |
2021-08-10 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2021-08-10 |
Time |
17:10 |
Rev Time |
7.00 |
Received By |
eschneid |
Date |
2021-08-06 |
Time |
16:31 |
Sent To |
|
|
Notes |
2021-08-10 17:11:02 | FAILED | | | | PROVIDE WRITTEN RESPONSES TO PLANS. | | | | 1) THE MINOR PLANNED DEVELOPMENT AMENDMENT REVIEWED BY | | STAFF DID NOT PASS PLANNING AS THE BUILDING HAS SHIFTED | | AND NO LONGER MEETS MANY OF THE MINIMUM SETBACK | | REQUIREMENTS. ZONING WILL NOT PASS THE FOUNDATION | | PERMIT UNTIL THE MINOR PLANNED DEVELOPMENT AMENDMENT | | PASSES. ALL PLANS RESUBMITTED WITH THIS PERMIT MUST | | MATCH THE PLANS APPROVED AS PART OF THE MINOR PLANNED | | DEVELOPMENT AMENDMENT. PREVIOUSLY RAISED COMMENTS FOR | | THIS PERMIT THAT WILL BE COVERED AS PART OF THE MINOR | | PLANNED DEVELOPMENT AMENDMENT REVIEW/APPROVAL HAVE BEEN | | REMOVED. | | | | 2) UPDATED COMMENT: RESOLUTION 13-19, WHICH APPROVED | | THE PROJECT INCLUDED THE REQUIREMENT THAT CERTAIN ITEMS | | REQUIRED PRIOR TO THE SUBMITTAL OF THE BUILDING PERMIT | | FOR SITE IMPROVEMENTS, WHICH INCLUDES THE FOUNDATION | | PERMIT. PROVIDE EVIDENCE THAT THE FOLLOWING HAVE BEEN | | COMPLETED: | | | | A. ABANDON OR RELOCATE THE FPL EASEMENT ALONG THE SOUTH | | PROPERTY LINE. THE DEVELOPER, BASED ON DISCUSSIONS WITH | | FPL, PRESENTED A TEMPORARY POWER ROUTING PLAN TO CITY | | STAFF; HOWEVER, THE FINAL PLAN AND FPL'S SIGN OFF ARE | | NOT INCLUDED WITH THE RESUBMITTAL. SHEET E1.050 DOES | | NOT SPECIFY WHEN THE EASEMENT WILL BE ABANDONED. | | | | 3) REPEAT COMMENT: PROVIDE INFORMATION ON THE PILING | | INSTALLATION: RESOLUTION 13-19 REQUIRES THAT THE | | PROJECT SHALL NOT USE HYDRAULIC HAMMERS TO SET | | FOUNDATION PILES. IF FOUNDATION PILES ARE PROPOSED THEY | | SHALL BE AUGURED, DRILLED, VIBRATED, OR PRESSED INTO | | PLACE. SHEET PILING MAY BE INSTALLED USING VIBRATORS, | | HYDRO JETTING, OR HYDRAULIC JACK PRESSING EQUIPMENT TO | | STABILIZE THE PERIMETER OF THE SITE TO ACCOMMODATE THE | | EXCAVATION AND CONSTRUCTION OF THE SUBGRADE BASEMENT | | AND RETAINING WALLS. | | | | 4) REPEAT COMMENT: PROVIDE INFORMATION ON THE REQUIRED | | CONDITION SURVEY: RESOLUTION 13-19 REQUIRES THAT THE | | DEVELOPER SHALL PERFORM A CONDITION SURVEY OF THE | | ADJOINING PROPERTIES PRIOR TO THE COMMENCEMENT OF ANY | | CONSTRUCTION OR DEMOLITION ACTIVITIES. THE DEVELOPER | | SHALL CONFORM TO THE APPROPRIATE INDUSTRY STANDARDS | | APPROVED BY THE CITY'S BUILDING DIVISION IN MONITORING | | THE VIBRATION EFFECTS ON THE ADJOINING PROPERTIES; THIS | | MAY INCLUDE, BUT IS NOT LIMITED TO, THE PLACEMENT OF | | SEISMIC METERS, INSPECTIONS, AND SIMILAR ACTIVITIES. | | | | 5) EV PROVISIONS - ZONING STAFF HAS REVIEWED AND NEEDS | | CLARIFICATION NARRATIVE ON THE EV PROVISION. COMMENTS | | BELOW MAY CHANGE BASED ON THE NARRATIVE. THE NARRATIVE | | SHALL VERIFY THE RESOLUTION NO. 13-19 EV REQUIREMENTS. | | | | A. THE B1 ELECTRIC PLANS DO NOT SHOW EV LEVEL 1 | | CIRCUITS TO THE GARAGE SPACES ALONG THE SOUTH WALL. | | PLEASE EXPLAIN. | | | | B. IT APPEARS THAT THE GUEST SPACES ARE ONLY GETTING EV | | LEVEL 1, INSTEAD OF THE LEVEL 2 THAT ARE REQUIRED. NOTE | | ONLY TWO SPACES ARE REQUIRED TO HAVE EV LEVEL 2. | | | | 4) REPEAT COMMENT: THE SURVEY PROVIDED WITH THE PERMIT | | IS NOT THE LATEST SURVEY. PROVIDE THE CORRECT SURVEY. | | | | 5) REPEAT COMMENT: THE SITE PLAN NEEDS TO INCLUDE ALL | | THE SETBACK DIMENSIONS TO THE ELEMENTS OF THE SITE THAT | | ARE PART OF THE FOUNDATION. | | | | 8) THE ABOVE GRADE IMPROVEMENTS REQUIRE REVIEW AS | | SEPARATE PERMITS WITH PLANS: | | | | A. THE WALLS, FENCES, GATES AND COLUMNS REQUIRE A | | SEPARATE PERMIT WITH PLANS. | | B. HARDSCAPE, INCLUDING PAVERS, ARTIFICIAL TURF, DOG | | PARK ITEMS, BENCHES/PLAZA AREA, ETC. | | C. LANDSCAPE | | D. IRRIGATION | | E. GENERATOR - PLEASE NOTE THAT THE FULL HEIGHT OF THE | | GENERATOR DOES NOT APPEAR TO BE SCREENED AS REQUIRED BY | | RESOLUTION NO. 13-19. | | F. WATER FEATURES | | G. PARKING STRIPING | | H. SITE LIGHTING, INCLUDING BOLLARDS, NOTE: SINCE | | ACACIA ROAD IS A SEPARATE PARCEL, IT REQUIRES ITS OWN | | PERMIT FOR THE LIGHTING, BUT MAY BE INCLUDED ON ONE SET | | OF PLANS FOR BOTH PERMIT NUMBERS. PHOTOMETRIC PLANS ARE | | REQUIRED WITH THE PERMITS. | | I. BICYCLE RACKS, INCLUDES THE BICYCLE STORAGE ROOM. | | | | 9) ACACIA ROAD IS A SEPARATE PARCEL. ALL PLANS SHOWING | | THE ACACIA ROAD WORK ARE TO BE REVIEWED AND APPROVED | | UNDER A SEPARATE PERMIT. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | [email protected] | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2020-06-18 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2020-06-18 |
Time |
15:24 |
Rev Time |
8.00 |
Received By |
eschneid |
Date |
2020-06-18 |
Time |
15:23 |
Sent To |
|
|
Notes |
2020-06-18 15:38:06 | FAILED | | | | PROVIDE WRITTEN RESPONSES TO PLANS. | | | | 1) RESOLUTION 13-19, WHICH APPROVED THE PROJECT | | INCLUDED THE REQUIREMENT THAT CERTAIN ITEMS REQUIRED | | PRIOR TO THE SUBMITTAL OF THE BUILDING PERMIT FOR SITE | | IMPROVEMENTS, WHICH INCLUDES THE FOUNDATION PERMIT. | | PROVIDE EVIDENCE THAT THE FOLLOWING HAVE BEEN | | COMPLETED: | | | | A. RECORD A BOUNDARY PLAT FOR ALL OF THE PARCELS WITHIN | | THE 1309 SOUTH FLAGLER DRIVE RESIDENTIAL PLANNED | | DEVELOPMENT. NOTE: THIS PROCESS HAS NOT BEEN INITIATED | | WITH THE CITY AND REQUIRES APPROVAL BY THE CITY | | COMMISSION. | | | | B. ABANDON THE FPL EASEMENT ALONG SOUTH PROPERTY LINE | | RELOCATE ALL LINES RELOCATED PRIOR TO THE BUILDING | | PERMIT APPROVAL FOR ANY ABOVE GROUND IMPROVEMENTS. | | | | C. SUBMIT A DELIVERY MANAGEMENT PLAN FOR THE CURRIE | | CRESCENT ENTRANCE. THE MANAGEMENT PLAN MUST ADDRESS THE | | FOLLOWING ITEMS: | | - ONLY PRESCHEDULED DELIVERIES WILL BE ALLOWED. | | - PROVIDE A MEANS OF PRESCHEDULING DELIVERIES WITH | | PROPERTY STAFF. | | - PROVIDE STAFFING PLAN FOR DELIVERIES. | | - PROVIDE SPOTTERS FOR BACKING IN OF VEHICLES. | | - ENSURE THAT VEHICLES WILL NOT STOP OR STAND ON CURRIE | | CRESCENT SIDEWALK WHILE WAITING FOR GATE TO OPEN. | | | | 2) PROVIDE INFORMATION ON THE PILING INSTALLATION: | | RESOLUTION 13-19 REQUIRES THAT THE PROJECT SHALL NOT | | USE HYDRAULIC HAMMERS TO SET FOUNDATION PILES. IF | | FOUNDATION PILES ARE PROPOSED THEY SHALL BE AUGURED, | | DRILLED, VIBRATED, OR PRESSED INTO PLACE. SHEET PILING | | MAY BE INSTALLED USING VIBRATORS, HYDRO JETTING, OR | | HYDRAULIC JACK PRESSING EQUIPMENT TO STABILIZE THE | | PERIMETER OF THE SITE TO ACCOMMODATE THE EXCAVATION AND | | CONSTRUCTION OF THE SUBGRADE BASEMENT AND RETAINING | | WALLS. | | | | 3) PROVIDE INFORMATION ON THE REQUIRED CONDITION | | SURVEY: RESOLUTION 13-19 REQUIRES THAT THE DEVELOPER | | SHALL PERFORM A ?CONDITION SURVEY? OF THE ADJOINING | | PROPERTIES PRIOR TO THE COMMENCEMENT OF ANY | | CONSTRUCTION OR DEMOLITION ACTIVITIES. THE DEVELOPER | | SHALL CONFORM TO THE APPROPRIATE INDUSTRY STANDARDS | | APPROVED BY THE CITY'S BUILDING DIVISION IN MONITORING | | THE VIBRATION EFFECTS ON THE ADJOINING PROPERTIES; THIS | | MAY INCLUDE, BUT IS NOT LIMITED TO, THE PLACEMENT OF | | SEISMIC METERS, INSPECTIONS, AND SIMILAR ACTIVITIES. | | | | 4) THE SURVEY PROVIDED WITH THE PERMIT IS NOT THE | | LATEST SURVEY. PROVIDE THE CORRECT SURVEY. | | | | 5) THE SITE PLAN NEEDS TO INCLUDE ALL THE SETBACK | | DIMENSIONS TO THE ELEMENTS OF THE SITE THAT ARE PART OF | | THE FOUNDATION. | | | | 6) REMOVE THE LANDSCAPE AND IRRIGATION PLANS FROM THIS | | SUBMITTAL. THEY REQUIRE THEIR OWN SEPARATE PERMITS. | | NOTE THE LANDSCAPE PLAN WAS NOT CORRECTED TO REFLECT | | THE NEW SWITCH CABINET ALONG ACACIA ROAD. ADDITIONALLY, | | THERE MUST BE A CONTINUOUS BUFFER ALONG THE SOUTH | | PROPERTY LINE WHERE THE NEW FPL PAD MOUNT TRANSFORMER | | IS PROPOSED. A BETTER OPTION WOULD BE TO LOCATE THE | | TRANSFORMER ON THE NORTH SIDE OF THE DRIVEWAY. STAFF | | WILL NEED TO REVIEW PLANS THAT VERIFY THE LANDSCAPE | | BUFFER HEDGE EXISTS AND WILL SCREEN THE TRANSFORMER | | FROM THE SOUTH PRIOR TO ANY ZONING APPROVAL OF THE SITE | | LAYOUT. | | | | 7) THE ABOVE GRADE IMPROVEMENTS REQUIRE REVIEW AS PART | | OF A SEPARATE PERMIT. | | | | 8) ACACIA ROAD IS A SEPARATE PARCEL. ALL PLANS SHOWING | | THE ACACIA ROAD WORK ARE TO BE REVIEWED AND APPROVED | | UNDER A SEPARATE PERMIT. | | | | 9) THE WALLS, FENCES AND COLUMNS REQUIRE A SEPARATE | | PERMIT WITH PLANS. NOTE: THERE ARE WALLS THAT ARE | | HIGHER THAN THE APPROVED CITY COMMISSION APPROVED | | PLANS. YOU WILL NEED TO SHOW THE SETBACK DIMENSIONS AND | | THE CROSS SECTIONS TO VERIFY THAT THE WALLS DO NOT | | VIOLATE THE WALL HEIGHT WAIVERS. | | | | 10) THE PARKING STRIPING REQUIRES A SEPARATE PERMIT | | WITH PLANS. THE FOLLOWING ITEMS NEED TO BE ADDRESSED ON | | THE PARKING STRIPING PERMIT. | | | | A. PROVIDE THE DIMENSIONS FOR THE SPACES. | | | | B. SPACES B2-41 AND B2-78 NEED TO BE A MINIMUM OF 8.5 | | FEET WIDE. PLEASE NOTE THAT THIS SPACE AND SOME OF THE | | SPACES WITHIN THE PRIVATE GARAGES DO NOT PROVIDE MUCH | | SPACE TO OPEN THE CAR DOOR. THIS IS A LUXURY | | CONDOMINIUM PROJECT WITH TIGHT PARKING SPACES. THE | | STAFF HAS HEARD COMPLAINTS FROM OWNERS IN PREVIOUS | | CONDOMINIUMS THAT THE STANDARD WIDTH STALL, WHEN | | AGAINST A WALL DOES NOT PROVIDE THE ABILITY TO OPEN CAR | | DOORS. YOU SHOULD TAKE THIS INTO ACCOUNT WHEN MARKETING | | THE PARKING SPACES IN RELATION TO THE OWNER'S CAR | | SIZES. | | | | C. WHERE ARE THE REQUIRED EMPLOYEE PARKING SPACES. | | | | D. THE PARKING TABLE CALLS OUT 133 PARKING SPACES | | PROVIDED, YET THE BUILDING AREA MATRIX ONLY LISTS 129 | | SPACES. EXPLAIN THE DISCREPANCY. | | | | 11) THE USE OF ARTIFICIAL TURF FOR THE DOG PARK AREA | | WILL REQUIRE THAT THE ARTIFICIAL TURF NOT BE VISIBLE | | FROM THE CURRIE CRESCENT OR ACACIA ROAD RIGHTS-OF-WAY. | | THIS NEEDS TO BE CLEARLY SHOWN ON THE PERMIT FOR THE | | INSTALLATION OF THE ARTIFICIAL TURF. | | | | 12) EXPLAIN WHY THERE IS MORE NET SF FOR EACH UNIT BUT | | LESS ENCLOSED GROSS SF ON EACH FLOOR THAN WHAT WAS | | APPROVED BY RESOLUTION NO. 13-19. | | | | 13) AN APPROVED TREE ALTERATION PERMIT IS REQUIRED | | PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES. | | | | 14) THE SITE LIGHTING REQUIRES A SEPARATE PERMIT WITH | | PLANS. SINCE ACACIA ROAD IS A SEPARATE PARCEL, IT | | REQUIRES ITS OWN PERMIT. PHOTOMETRIC PLANS ARE REQUIRED | | WITH THE PERMITS. | | | | 15) THE BICYCLE RACKS REQUIRE A SEPARATE PERMIT WITH | | PLANS. THIS INCLUDES THE BICYCLE STORAGE ROOM. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | [email protected] | | |
|
|