Plan Review Details - Permit 20030875
Plan Review Stops For Permit 20030875
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2020-06-15 Cont ID  
Sent By rmcphers Date 2020-06-15 Time 08:53 Rev Time 0.00
Received By rmcphers Date 2020-06-15 Time 08:53 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-05-21 Cont ID  
Sent By rmcphers Date 2020-05-11 Time 15:26 Rev Time 0.00
Received By rmcphers Date 2020-05-11 Time 15:26 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-03-30 Cont ID  
Sent By rmcphers Date 2020-03-30 Time 14:29 Rev Time 0.00
Received By rmcphers Date 2020-03-30 Time 14:11 Sent To  
Notes
2020-03-30 14:29:34SOLAR PANELS
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) DRAWINGS NEED TO BE SIGNED AND SEALED BY AN
 ARCHITECT OR ENGINEER.
 2) PLEASE CLEARLY SHOW THE SOLAR PANEL LOCATION ON THE
 ROOF, DIMENSIONS OF PANELS, DIMENSIONS FROM ROOF EDGE
 OR VALLEY.
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2020-05-08 Cont ID  
Sent By jleahy Date 2020-05-08 Time 14:42 Rev Time 0.00
Received By jleahy Date 2020-05-08 Time 14:37 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2020-03-26 Cont ID  
Sent By jleahy Date 2020-03-26 Time 17:50 Rev Time 0.00
Received By jleahy Date 2020-03-26 Time 14:40 Sent To  
Notes
2020-03-26 17:58:42ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY BN, BU, PX
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 1) VALUE IS LOW FOR THIS SIZE SYSTEM. (SYSTEM THIS SIZE
 IS $26,000)
  
 FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING
 PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE
 TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.
  
 2) SHOW HOW PLAN MEETS THE REQUIREMENTS OF 705.12
  
 705.12 (D)(2)(3) (B) WHERE TWO SOURCES, ONE A UTILITY
 AND THE OTHER AN INVERTER, ARE LOCATED AT OPPOSITE ENDS
 OF A BUSBAR THAT CONTAINS LOADS, THE SUM OF 125 PERCENT
 OF THE INVERTER(S) OUTPUT CIRCUIT CURRENT AND THE
 RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUSBAR
 SHALL NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE
 BUSBAR. THE BUSBAR SHALL BE SIZED FOR THE LOADS
 CONNECTED IN ACCORDANCE WITH ARTICLE 220

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2020-03-19 Cont ID  
Sent By fmittner Date 2020-03-19 Time 16:30 Rev Time 0.00
Received By fmittner Date 2020-03-19 Time 16:30 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2020-06-25 Cont ID  
Sent By lmarchan Date 2020-06-25 Time 16:01 Rev Time 0.00
Received By lmarchan Date 2020-06-02 Time 14:30 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-05-11 Cont ID  
Sent By rmcphers Date 2020-05-11 Time 15:27 Rev Time 0.00
Received By rmcphers Date 2020-04-30 Time 15:49 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-03-30 Cont ID  
Sent By rmcphers Date 2020-03-30 Time 14:30 Rev Time 0.00
Received By rmcphers Date 2020-03-18 Time 08:18 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2020-06-15 Cont ID  
Sent By rmcphers Date 2020-06-15 Time 08:54 Rev Time 0.00
Received By rmcphers Date 2020-06-15 Time 08:54 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-05-11 Cont ID  
Sent By rmcphers Date 2020-05-11 Time 15:27 Rev Time 0.00
Received By rmcphers Date 2020-05-11 Time 15:27 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-03-30 Cont ID  
Sent By rmcphers Date 2020-03-30 Time 14:30 Rev Time 0.00
Received By rmcphers Date 2020-03-30 Time 14:30 Sent To  
Notes
2020-03-30 14:30:36SEE BUILDING PLAN REVIEW

Review Stop Z ZONING
Rev No 3 Status P Date 2020-06-25 Cont ID  
Sent By llouie Date 2020-06-25 Time   Rev Time 0.00
Received By llouie Date 2020-06-25 Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status F Date 2020-05-05 Cont ID  
Sent By llouie Date 2020-05-05 Time   Rev Time 0.00
Received By llouie Date 2020-05-05 Time   Sent To  
Notes
2020-05-05 16:41:39** FAILED **
  
 PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE
 COMMENTS IN WRITING AND/OR ON THE PLANS WHERE
 APPLICABLE:
  
 1.) IT IS NOT CLEAR IN THE PLANS IF THE SOLAR PANELS
 ARE TO BE MOUNTED ON A FLAT OR SLOPED ROOF. AERIAL OF
 THE PROPERTY INDICATES THAT THE SOLAR PANELS WILL BE
 LOCATED ON A FLAT ROOFED BUILDING; HOWEVER, A DETAIL
 PROVIDED IN THE PLAN SET INDICATES THAT THE ROOF IS
 SLOPED. PLEASE CLARIFY.
  
 2.) IN ADDITION TO THE DETAIL OF THE SOLAR PANELS,
 THERE SHOULD BE A DETAIL SHOWING THE OUTLINE OF THE
 PANELS AS TO BE INSTALLED ON THE ROOFTOP OF THE
 EXISTING BUILDING.
  
 3.) MOUNTING OF THE PANELS SHALL BE CONSISTENT WITH THE
 REQUIREMENTS IN ZLDR S.94-309(I)(4).
  
  
 NOTES:
  
 * ANY REVISIONS MAY RESULT IN ADDITIONAL COMMENTS.
  
 * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE
 QUESTIONS.
  
 * ZONE: SF7-C4
  

Review Stop Z ZONING
Rev No 1 Status F Date 2020-03-19 Cont ID  
Sent By hdanfort Date 2020-03-19 Time 16:12 Rev Time 0.00
Received By hmtribou Date 2020-03-19 Time 16:12 Sent To  
Notes
2020-03-19 16:13:36INDICATE LOCATION OF SOLAR PANEL COLLECTORS ON SITE
 PLAN AND IF ROOF IS FLAT OR SLOPED.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved