Plan Review Details - Permit 20030637
Plan Review Stops For Permit 20030637
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2020-03-27 Cont ID  
Sent By cpuell Date 2020-03-27 Time 13:59 Rev Time 0.00
Received By cpuell Date 2020-03-27 Time 13:59 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status P Date 2020-03-31 Cont ID  
Sent By rmcphers Date 2020-03-31 Time 15:09 Rev Time 0.00
Received By rmcphers Date 2020-03-31 Time 15:09 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2020-06-05 Cont ID  
Sent By cthroop Date 2020-06-05 Time 11:16 Rev Time 0.00
Received By cthroop Date 2020-06-05 Time 07:09 Sent To  
Notes
2020-06-05 11:17:28INSPECTION HOLD PENDING RESIDENT INSPECTOR AGREEMENT.
 CT

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2020-05-23 Cont ID  
Sent By pvalenti Date 2020-05-23 Time 14:23 Rev Time 0.00
Received By pvalenti Date 2020-05-22 Time 15:39 Sent To  
Notes
2020-05-23 14:22:14PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
 FBC M = FBC MECHANICAL
  
 BUILDING REVIEW DENIED:
  
 1. FBC B 107.3.4.1. PLEASE ADD TO THE DEFFERED
 SUBMITTAL SECTIONS OF PAGES ALS 1.1 AND 1LS 2.1:
 A) SHOP DRAWINGS FOR EXTERIOR LIGHT GAGE FRAMING
 MATERIAL
 B) EXTERIOR WALL CLADDING PRODUCT APPROVALS/DETAILS
 C) INTUMESCENT PAINT PRODUCT APPROVALS/MANUFACTURER'S
 SPECIFICATIONS
  
 2. FBC B 107, FBC B 108, PLEASE PROVIDE RESPONSE TO THE
 PRIOR BUILDING REVIEW COMMENT REGARDING THRESHOLD
 INSPECTOR REQUIREMENTS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-03-31 Cont ID  
Sent By rmcphers Date 2020-03-31 Time 15:35 Rev Time 0.00
Received By rmcphers Date 2020-03-31 Time 11:53 Sent To  
Notes
2020-03-31 15:23:04SHELL ALTERATION
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) PLEASE PROVIDE THE EXTERIOR LIGHT GAGE WALL FRAMING
 DETAILS.
 2) PLEASE PROVIDE THE EXTERIOR WALL CLADDING DETAILS OR
 PRODUCT APPROVALS.
 3) PLEASE PROVIDE THE COLUMN INTUMESCENT PAINT DETAILS
 (FBC 704.13.1) FOR A 2 HOUR FIRE RATING OF THE COLUMNS
 PER FBC TABLE 601
 4) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE
 INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE
 PRODUCT APPROVALS. ALL PRODUCT APPROVALS NEED TO BE
 REVIEWED AND MARKED APPROVED BY THE BUILDING DESIGNER
 OF RECORD.
  
 553.79(5) 2016, THIS IS A THRESHOLD BUILDING. THE
 FOLLOWING IS REQUIRED PRIOR TO COMMENCEMENT:
  
 1. COMPLETE THE THRESHOLD / SPECIAL INSPECTOR AGREEMENT
 OF UNDERSTANDING;
  
 2. PROVIDE RESUMES AND COPIES OF LICENSES FOR ALL
 PROPOSED INSPECTORS.
  
 3. ALL PLANS ARE TO INCLUDE THE THRESHOLD STATEMENT
 REQUIRED BY FS553.79(7)(D).
  
 (D)ALL PLANS FOR THE BUILDING WHICH ARE REQUIRED TO BE
 SIGNED AND SEALED BY THE ARCHITECT OR ENGINEER OF
 RECORD CONTAIN A STATEMENT THAT, TO THE BEST OF THE
 ARCHITECT?S OR ENGINEER?S KNOWLEDGE, THE PLANS AND
 SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM
 BUILDING CODES AND THE APPLICABLE FIRESAFETY STANDARDS
 AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH
 THIS CHAPTER 553 AND CHAPTER 633.
  
 4. THRESHOLD INSPECTION PLAN REQUIRED, FS553.79(5)A).

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2020-06-01 Cont ID  
Sent By jleahy Date 2020-06-01 Time 16:57 Rev Time 0.00
Received By jleahy Date 2020-06-01 Time 16:56 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-03-31 Cont ID  
Sent By jpearson Date 2020-03-31 Time 15:17 Rev Time 0.00
Received By jpearson Date 2020-03-31 Time 13:59 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2020-06-05 Cont ID  
Sent By pleduc Date 2020-06-05 Time   Rev Time 0.00
Received By pleduc Date 2020-06-05 Time 11:14 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2020-05-20 Cont ID  
Sent By pleduc Date 2020-05-19 Time   Rev Time 0.00
Received By pleduc Date 2020-05-19 Time 14:01 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2020-03-25 Cont ID  
Sent By pleduc Date 2020-03-25 Time   Rev Time 0.00
Received By pleduc Date 2020-03-25 Time 14:19 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2020-06-05 Cont ID  
Sent By cthroop Date 2020-06-05 Time 11:17 Rev Time 0.00
Received By cthroop Date 2020-06-04 Time 16:14 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-06-01 Cont ID  
Sent By jleahy Date 2020-06-01 Time 16:57 Rev Time 0.00
Received By jleahy Date 2020-05-18 Time 13:06 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-04-14 Cont ID  
Sent By lmarchan Date 2020-04-14 Time 16:26 Rev Time 0.00
Received By lmarchan Date 2020-03-24 Time 14:57 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2020-06-02 Cont ID  
Sent By medwards Date 2020-05-28 Time 11:28 Rev Time 0.00
Received By medwards Date 2020-05-28 Time 11:28 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2020-03-26 Cont ID  
Sent By jbaker Date 2020-03-26 Time 12:15 Rev Time 0.00
Received By shill Date 2020-03-26 Time 07:47 Sent To  
Notes
2020-03-26 12:16:071. 2017FBC 107.3.5 MINIMUM PLAN REVIEW CRITERIA FOR
 BUILDINGS.
 THE SCOPE OF THIS WORK IS UNCLEAR. THERE ARE NO
 DEMOLITION DRAWINGS SO IT IS UNKNOWN IF THIS IS AN AIR
 CONDITIONING REPLACEMENT PROJECT OR THESE ARE NEW UNITS
 ETC. ARE UNITS ABOVE CEILING OR IN A MER. ALSO THERE
 ARE NO OUTSIDE AIR VENTILATION CALCULATIONS BASED ON
 THE NUMBER OF PEOPLE FOR THIS OCCUPANCY. IS THE OUTSIDE
 AIR DUCT INSULATED THAT IS BRINGING IN OUTSIDE AIR TO
 THE FCU'S? I SEE M.O.D.'S ARE INSTALLED AT THE FCU'S IN
 THE O.A. DUCTS. IS O.A. ALLOWED TO MIGRATE INTO THE
 BUILDING. IT IS UNCLEAR HOW THIS IS SUPPOSED TO WORK.
 PLEASE DESCRIBE IN DETAIL THE EXISTING SYSTEMS AND WHAT
 EXACTLY IS TAKING PLACE IN THE SCOPE OF YOUR WORK.
 THERE ARE NO OBVIOUS ROOMS CALLED OUT OR NUMBERED ETC.
  
 PLEASE PROVIDE A COMMENT/RESPONSE LETTER WITH YOUR
 RESUBMITTAL AND FURTHER COMMENTS MAY BE MADE AT THAT
 TIME
  
 REVIEWED REMOTELY BY JAMES BAKER, PE
 PX3997, PE77268
 561-805-6724
 [email protected]
  
  

Review Stop P PLUMBING
Rev No 1 Status P Date 2020-03-26 Cont ID  
Sent By jbaker Date 2020-03-26 Time 07:46 Rev Time 0.00
Received By shill Date 2020-03-26 Time 07:18 Sent To  
Notes
2020-03-26 07:46:49REVIEWED REMOTELY BY JAMES BAKER, PE
 PX3997, PE77268
 561-805-6724
 [email protected]
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2020-06-05 Cont ID  
Sent By cthroop Date 2020-06-05 Time 11:17 Rev Time 0.00
Received By cthroop Date 2020-06-05 Time 07:09 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-05-23 Cont ID  
Sent By pvalenti Date 2020-05-23 Time 14:23 Rev Time 0.00
Received By pvalenti Date 2020-05-22 Time 15:38 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-03-26 Cont ID  
Sent By shill Date 2020-03-26 Time 07:48 Rev Time 0.00
Received By shill Date 2020-03-26 Time 07:47 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2020-05-20 Cont ID  
Sent By eschneid Date 2020-05-20 Time 17:05 Rev Time 0.50
Received By eschneid Date 2020-05-20 Time 16:39 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2020-04-14 Cont ID  
Sent By eschneid Date 2020-04-14 Time 16:19 Rev Time 1.00
Received By eschneid Date 2020-04-14 Time 14:44 Sent To  
Notes
2020-04-14 16:20:36FAILED
  
 PLEASE PROVIDE WRITTEN RESPONSES.
  
 1) THE SECOND STORY SHOWN ON THE WEST ELEVATION -
 DEMOLITION SHEET A2.0.2 DOES NOT INCLUDE VERIFICATION
 THAT THE AREA IN THE CENTRAL PORTION OF THE FACADE IS
 BEING REMOVED (AS INDICATED ON THE DEMOLITION PLAN ON
 SHEET AD.2.1).
  
 2) STAFF DOES NOT SUPPORT THE REMOVAL OF THE GLAZING AT
 THE SECOND STORY CORNER (NORTH AND WEST SIDES) AND ITS
 REPLACEMENT WITH A STUCCO WALL. THIS IS A PRIME SECOND
 STORY LOCATION AND NEEDS TO RETAIN ITS GLAZING. A
 REVIEW OF THE INTERIOR BUILDOUT PLAN FOR URBAN
 OUTFITTERS SHOWS THIS AS THE LOCATION FOR THE BACK OF
 THE FITTING ROOM STRUCTURE. REGARDLESS OF THE FACT THAT
 PLACING THE FITTING ROOM AT THE FRONT OF THE STORE
 WHERE IT WOULD BLOCK WINDOWS DOES NOT SEEM THE BEST
 LOCATION, IF IT MUST BE PLACED THERE, THEN IT NEEDS TO
 BE SETBACK TO PERMIT THE DISPLAY OF MERCHANDISE BETWEEN
 THE FITTING ROOM STRUCTURE WALL AND EXTERIOR GLAZING.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446
 [email protected]