Plan Review Stops For Permit 20030637 |
Review Stop |
AD |
ADDRESSING |
Rev No |
1 |
Status |
P |
Date |
2020-03-27 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2020-03-27 |
Time |
13:59 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2020-03-27 |
Time |
13:59 |
Sent To |
|
|
Notes |
|
|
Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
Rev No |
1 |
Status |
P |
Date |
2020-03-31 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-03-31 |
Time |
15:09 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-03-31 |
Time |
15:09 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2020-06-05 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2020-06-05 |
Time |
11:16 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2020-06-05 |
Time |
07:09 |
Sent To |
|
|
Notes |
2020-06-05 11:17:28 | INSPECTION HOLD PENDING RESIDENT INSPECTOR AGREEMENT. | | CT |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2020-05-23 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2020-05-23 |
Time |
14:23 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2020-05-22 |
Time |
15:39 |
Sent To |
|
|
Notes |
2020-05-23 14:22:14 | PETER E VALENTI | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6673 | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | FBC R = FBC RESIDENTIAL | | FBC M = FBC MECHANICAL | | | | BUILDING REVIEW DENIED: | | | | 1. FBC B 107.3.4.1. PLEASE ADD TO THE DEFFERED | | SUBMITTAL SECTIONS OF PAGES ALS 1.1 AND 1LS 2.1: | | A) SHOP DRAWINGS FOR EXTERIOR LIGHT GAGE FRAMING | | MATERIAL | | B) EXTERIOR WALL CLADDING PRODUCT APPROVALS/DETAILS | | C) INTUMESCENT PAINT PRODUCT APPROVALS/MANUFACTURER'S | | SPECIFICATIONS | | | | 2. FBC B 107, FBC B 108, PLEASE PROVIDE RESPONSE TO THE | | PRIOR BUILDING REVIEW COMMENT REGARDING THRESHOLD | | INSPECTOR REQUIREMENTS. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2020-03-31 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-03-31 |
Time |
15:35 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-03-31 |
Time |
11:53 |
Sent To |
|
|
Notes |
2020-03-31 15:23:04 | SHELL ALTERATION | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | 1) PLEASE PROVIDE THE EXTERIOR LIGHT GAGE WALL FRAMING | | DETAILS. | | 2) PLEASE PROVIDE THE EXTERIOR WALL CLADDING DETAILS OR | | PRODUCT APPROVALS. | | 3) PLEASE PROVIDE THE COLUMN INTUMESCENT PAINT DETAILS | | (FBC 704.13.1) FOR A 2 HOUR FIRE RATING OF THE COLUMNS | | PER FBC TABLE 601 | | 4) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE | | INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE | | PRODUCT APPROVALS. ALL PRODUCT APPROVALS NEED TO BE | | REVIEWED AND MARKED APPROVED BY THE BUILDING DESIGNER | | OF RECORD. | | | | 553.79(5) 2016, THIS IS A THRESHOLD BUILDING. THE | | FOLLOWING IS REQUIRED PRIOR TO COMMENCEMENT: | | | | 1. COMPLETE THE THRESHOLD / SPECIAL INSPECTOR AGREEMENT | | OF UNDERSTANDING; | | | | 2. PROVIDE RESUMES AND COPIES OF LICENSES FOR ALL | | PROPOSED INSPECTORS. | | | | 3. ALL PLANS ARE TO INCLUDE THE THRESHOLD STATEMENT | | REQUIRED BY FS553.79(7)(D). | | | | (D)ALL PLANS FOR THE BUILDING WHICH ARE REQUIRED TO BE | | SIGNED AND SEALED BY THE ARCHITECT OR ENGINEER OF | | RECORD CONTAIN A STATEMENT THAT, TO THE BEST OF THE | | ARCHITECT?S OR ENGINEER?S KNOWLEDGE, THE PLANS AND | | SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM | | BUILDING CODES AND THE APPLICABLE FIRESAFETY STANDARDS | | AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH | | THIS CHAPTER 553 AND CHAPTER 633. | | | | 4. THRESHOLD INSPECTION PLAN REQUIRED, FS553.79(5)A). |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2020-06-01 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-06-01 |
Time |
16:57 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-06-01 |
Time |
16:56 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2020-03-31 |
|
|
Cont ID |
|
Sent By |
jpearson |
Date |
2020-03-31 |
Time |
15:17 |
Rev Time |
0.00 |
Received By |
jpearson |
Date |
2020-03-31 |
Time |
13:59 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
3 |
Status |
P |
Date |
2020-06-05 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2020-06-05 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2020-06-05 |
Time |
11:14 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2020-05-20 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2020-05-19 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2020-05-19 |
Time |
14:01 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2020-03-25 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2020-03-25 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2020-03-25 |
Time |
14:19 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2020-06-05 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2020-06-05 |
Time |
11:17 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2020-06-04 |
Time |
16:14 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2020-06-01 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-06-01 |
Time |
16:57 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-05-18 |
Time |
13:06 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2020-04-14 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2020-04-14 |
Time |
16:26 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2020-03-24 |
Time |
14:57 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2020-06-02 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2020-05-28 |
Time |
11:28 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2020-05-28 |
Time |
11:28 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2020-03-26 |
|
|
Cont ID |
|
Sent By |
jbaker |
Date |
2020-03-26 |
Time |
12:15 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2020-03-26 |
Time |
07:47 |
Sent To |
|
|
Notes |
2020-03-26 12:16:07 | 1. 2017FBC 107.3.5 MINIMUM PLAN REVIEW CRITERIA FOR | | BUILDINGS. | | THE SCOPE OF THIS WORK IS UNCLEAR. THERE ARE NO | | DEMOLITION DRAWINGS SO IT IS UNKNOWN IF THIS IS AN AIR | | CONDITIONING REPLACEMENT PROJECT OR THESE ARE NEW UNITS | | ETC. ARE UNITS ABOVE CEILING OR IN A MER. ALSO THERE | | ARE NO OUTSIDE AIR VENTILATION CALCULATIONS BASED ON | | THE NUMBER OF PEOPLE FOR THIS OCCUPANCY. IS THE OUTSIDE | | AIR DUCT INSULATED THAT IS BRINGING IN OUTSIDE AIR TO | | THE FCU'S? I SEE M.O.D.'S ARE INSTALLED AT THE FCU'S IN | | THE O.A. DUCTS. IS O.A. ALLOWED TO MIGRATE INTO THE | | BUILDING. IT IS UNCLEAR HOW THIS IS SUPPOSED TO WORK. | | PLEASE DESCRIBE IN DETAIL THE EXISTING SYSTEMS AND WHAT | | EXACTLY IS TAKING PLACE IN THE SCOPE OF YOUR WORK. | | THERE ARE NO OBVIOUS ROOMS CALLED OUT OR NUMBERED ETC. | | | | PLEASE PROVIDE A COMMENT/RESPONSE LETTER WITH YOUR | | RESUBMITTAL AND FURTHER COMMENTS MAY BE MADE AT THAT | | TIME | | | | REVIEWED REMOTELY BY JAMES BAKER, PE | | PX3997, PE77268 | | 561-805-6724 | | [email protected] | | | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2020-03-26 |
|
|
Cont ID |
|
Sent By |
jbaker |
Date |
2020-03-26 |
Time |
07:46 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2020-03-26 |
Time |
07:18 |
Sent To |
|
|
Notes |
2020-03-26 07:46:49 | REVIEWED REMOTELY BY JAMES BAKER, PE | | PX3997, PE77268 | | 561-805-6724 | | [email protected] | | | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
P |
Date |
2020-06-05 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2020-06-05 |
Time |
11:17 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2020-06-05 |
Time |
07:09 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2020-05-23 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2020-05-23 |
Time |
14:23 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2020-05-22 |
Time |
15:38 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2020-03-26 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2020-03-26 |
Time |
07:48 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2020-03-26 |
Time |
07:47 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2020-05-20 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2020-05-20 |
Time |
17:05 |
Rev Time |
0.50 |
Received By |
eschneid |
Date |
2020-05-20 |
Time |
16:39 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2020-04-14 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2020-04-14 |
Time |
16:19 |
Rev Time |
1.00 |
Received By |
eschneid |
Date |
2020-04-14 |
Time |
14:44 |
Sent To |
|
|
Notes |
2020-04-14 16:20:36 | FAILED | | | | PLEASE PROVIDE WRITTEN RESPONSES. | | | | 1) THE SECOND STORY SHOWN ON THE WEST ELEVATION - | | DEMOLITION SHEET A2.0.2 DOES NOT INCLUDE VERIFICATION | | THAT THE AREA IN THE CENTRAL PORTION OF THE FACADE IS | | BEING REMOVED (AS INDICATED ON THE DEMOLITION PLAN ON | | SHEET AD.2.1). | | | | 2) STAFF DOES NOT SUPPORT THE REMOVAL OF THE GLAZING AT | | THE SECOND STORY CORNER (NORTH AND WEST SIDES) AND ITS | | REPLACEMENT WITH A STUCCO WALL. THIS IS A PRIME SECOND | | STORY LOCATION AND NEEDS TO RETAIN ITS GLAZING. A | | REVIEW OF THE INTERIOR BUILDOUT PLAN FOR URBAN | | OUTFITTERS SHOWS THIS AS THE LOCATION FOR THE BACK OF | | THE FITTING ROOM STRUCTURE. REGARDLESS OF THE FACT THAT | | PLACING THE FITTING ROOM AT THE FRONT OF THE STORE | | WHERE IT WOULD BLOCK WINDOWS DOES NOT SEEM THE BEST | | LOCATION, IF IT MUST BE PLACED THERE, THEN IT NEEDS TO | | BE SETBACK TO PERMIT THE DISPLAY OF MERCHANDISE BETWEEN | | THE FITTING ROOM STRUCTURE WALL AND EXTERIOR GLAZING. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | [email protected] |
|
|