Plan Review Details - Permit 20030276
Plan Review Stops For Permit 20030276
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status P Date 2020-06-15 Cont ID  
Sent By pvalenti Date 2020-06-15 Time 12:03 Rev Time 0.00
Received By pvalenti Date 2020-06-15 Time 12:03 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2020-03-22 Cont ID  
Sent By shill Date 2020-03-22 Time 10:39 Rev Time 0.00
Received By shill Date 2020-03-22 Time 10:39 Sent To  
Notes
2020-03-22 10:40:12PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
 THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO
 [email protected]. THE INFORMATION SHOULD BE IN PDF
 FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE INCLUDE
 THE PERMIT NUMBER AND ?ASBESTOS? IN THE SUBJECT LINE.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2020-06-16 Cont ID  
Sent By pvalenti Date 2020-06-16 Time 07:01 Rev Time 0.00
Received By pvalenti Date 2020-06-16 Time 06:59 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2020-06-15 Cont ID  
Sent By pvalenti Date 2020-06-15 Time 12:12 Rev Time 0.00
Received By pvalenti Date 2020-06-15 Time 12:08 Sent To  
Notes
2020-06-15 12:13:18PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
 FBC M = FBC MECHANICAL
  
 BUILDING REVIEW DENIED:
  
 THE FEES STILL NEED TO BE PAID FOR THE DEMO DEBRIS
 REMOVAL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-03-22 Cont ID  
Sent By shill Date 2020-03-22 Time 10:39 Rev Time 0.00
Received By shill Date 2020-03-22 Time 10:39 Sent To  
Notes
2020-03-22 10:39:47****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 WHEN ALL OF THE BELOW ITEMS ARE COMPLETE, SEND TO
 [email protected], INCLUDE THE PERMIT NUMBER IN THE
 SUBJECT LINE. INCLUDE A RESUBMITTAL FORM.
  
 1. SEWER LATERAL CAPPING PERMIT; SCHEDULE A FINAL
 PLUMBING #703. BACKFLOW ALSO NEEDS FINAL INSPECTION.
  
 2. COMPLETE THE DEMO DEBRIS FORM AND PAY THE FEES,
 "DEMOLITION DEBRIS DISPOSAL FEE":
  
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
 AFTER THE FORM IS SENT TO [email protected], THE FEES
 WILL BE ADDED TO YOUR PERMIT. YOU CAN THEN PAY THE FEES
 ONLINE PRIOR TO PERMIT ISSUANCE.
  
 3. PROVIDE A COPY OF THE CONTRACT AS THE APPLICATION IS
 NOT SIGNED BY THE OWNER.
  
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2020-03-13 Cont ID  
Sent By rrossano Date 2020-03-13 Time   Rev Time  
Received By rrossano Date 2020-03-13 Time   Sent To I
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2020-03-12 Cont ID  
Sent By fmittner Date 2020-03-12 Time 09:56 Rev Time 0.00
Received By fmittner Date 2020-03-12 Time 09:56 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-06-16 Cont ID  
Sent By pvalenti Date 2020-06-16 Time 07:01 Rev Time 0.00
Received By pvalenti Date 2020-06-15 Time 15:13 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-03-22 Cont ID  
Sent By shill Date 2020-03-22 Time 10:40 Rev Time 0.00
Received By shill Date 2020-03-05 Time 10:05 Sent To  
Notes
2020-03-13 13:37:573/13 ROUTED TO BLDG MISC 2
2020-03-12 15:31:483/12 ROUTED TO ENGINEERING INBOX
2020-03-06 10:05:55ROUTED TO HISTORIC INBOX

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-07-07 Cont ID  
Sent By shill Date 2020-07-07 Time 13:11 Rev Time 0.00
Received By shill Date 2020-07-07 Time 13:11 Sent To  
Notes
2020-07-07 13:11:30ROUTED ORIGINAL CIVIL ENGINEERING TO RECORDS
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved