Plan Review Details - Permit 20021091
Plan Review Stops For Permit 20021091
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-06-10 Cont ID  
Sent By pvalenti Date 2020-06-10 Time 17:41 Rev Time 0.00
Received By pvalenti Date 2020-06-10 Time 17:41 Sent To  
Notes
2020-06-10 17:53:52PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
 FBC M = FBC MECHANICAL
  
 BUILDING REVIEW APPROVED WITH PROVISOS:
  
 1) AT TIME OF INSPECTION, PRIOR TO CONCRETE PLACEMENT,
 THE ENGINEER'S APPROVED INSPECTION REPORT OF
 GEOTECHNICAL REQUIREMENTS PER THE STUDY REPORT IS
 REQUIRED.
  
 2) AWS D1.1 CLAUSE 3.1: AT TIME OF INSPECTION PLEASE
 PROVIDE A WELD PROCEDURE SPECIFICATION; THE W.P.S.
 SPECIFIES THE REQUIRED ESSENTIAL VARIABLES INCLUDING:
 BASE MATERIALS, JOINTS, PROCESS, AND FILLER METALS TO
 BE USED.
 AWS D1.1 CLAUSE 4.15: AT TIME OF INSPECTION PLEASE
 PROVIDE A WELDER PERFORMANCE QUALIFICATION RECORD; THE
 W.P.Q.R. PROVIDES INFORMATION WHICH CAN BE USED TO
 VERIFY THE WELDER?S QUALIFICATION AND CERTIFICATION AS
 IT RELATES TO THE WELDING REQUIREMENTS OF THE PROJECT.
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-03-06 Cont ID  
Sent By rmcphers Date 2020-03-06 Time 14:44 Rev Time 0.00
Received By rmcphers Date 2020-03-06 Time 14:44 Sent To  
Notes
2020-03-06 14:45:52CABANA
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107.2.1
 1) PLEASE PROVIDE A SOIL REPORT (GEOTECHNICAL REPORT) -
 FBC 1803

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2020-03-02 Cont ID  
Sent By rrossano Date 2020-03-02 Time   Rev Time 0.00
Received By rrossano Date 2020-03-02 Time   Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-03-06 Cont ID  
Sent By rmcphers Date 2020-03-06 Time 14:46 Rev Time 0.00
Received By rmcphers Date 2020-02-25 Time 13:09 Sent To  
Notes
2020-03-06 14:46:31PLANS TAKEN TO PERMIT LIBRARY
2020-03-02 18:02:00ROUTED TO MISC 2 INBOX
2020-02-27 16:49:182/27 ROUTED TO ENGINEERING INBOX
2020-02-26 13:09:51ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 1 Status P Date 2020-02-27 Cont ID  
Sent By rfalcone Date 2020-02-27 Time 16:25 Rev Time 0.00
Received By rfalcone Date 2020-02-27 Time 16:25 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved