Plan Review Details - Permit 20020973
Plan Review Stops For Permit 20020973
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-03-04 Cont ID  
Sent By jgomez Date 2020-03-04 Time 13:58 Rev Time 0.00
Received By jgomez Date 2020-03-04 Time 13:44 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-03-02 Cont ID  
Sent By jgromez Date 2020-03-02 Time 17:36 Rev Time 0.00
Received By jgomez Date 2020-03-02 Time 17:02 Sent To Z
Notes
2020-03-02 17:36:43RESIDENTIAL (R3) REVISION BUILDING REVIEW COMMENTS
 CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS.
  
 NOTE: SEC. 801.3 FBC-EXISTING BUILDING. ALL NEW
 CONSTRUCTION ELEMENTS, COMPONENTS, SYSTEMS, AND SPACES
 SHALL COMPLY WITH THE REQUIREMENTS OF THE FLORIDA
 BUILDING CODE.
  
 1- SHEET S-10: THE ENTRY DOOR TO THE SECOND FLOOR WAS
 REMOVED. ACCORDING TO APPROVED PLANS THE SECOND FLOOR
 IS AIR CONDITIONED AND THE FIRST FLOOR IS STORAGE AREA
 WITHOUT AIR CONDITIONING. THE AIR CONDITION EQUIPMENT
 WAS SIZED FOR THE SECOND FLOOR ONLY. DESIGNER OF RECORD
 TO CLARIFY IF THE THE USE OF THE FIRST FLOOR IS GOING
 TO BE CHANGED. IF SO, THEN REVISE PLANS SHOWING THE
 PROPOSED USE. ALSO, REVISE MECHANICAL PLANS SHOWING THE
 EQUIPMENT SIZING REVISION. SEC. 107.2.1 CITY
 AMENDMENTS.
  
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2020-03-04 Cont ID  
Sent By fmittner Date 2020-03-04 Time 10:01 Rev Time 0.00
Received By fmittner Date 2020-03-04 Time 10:01 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-03-04 Cont ID  
Sent By jgomez Date 2020-03-04 Time 13:58 Rev Time 0.00
Received By jgomez Date 2020-03-04 Time 13:43 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-03-04 Cont ID  
Sent By jgomez Date 2020-03-04 Time 13:43 Rev Time 0.00
Received By jgomez Date 2020-02-21 Time 10:43 Sent To  
Notes
2020-02-25 13:44:11ROUTED TO JGOMEZ
2020-02-25 10:43:43REVISION ROUTED TO TKLARGE

Review Stop P PLUMBING
Rev No 2 Status P Date 2020-03-04 Cont ID  
Sent By jgomez Date 2020-03-04 Time 13:48 Rev Time 0.00
Received By jgomez Date 2020-03-04 Time 13:48 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2020-02-25 Cont ID  
Sent By tklarge Date 2020-02-25 Time 13:43 Rev Time 0.00
Received By jesmith Date 2020-02-25 Time 13:07 Sent To  
Notes
2020-02-25 13:42:59PLUMBING COMMENTS: REVISION APPROVED W/PROVISO
 RE: PLAN SHEET S-13:
 1. PROVIDE AAV (STUDOR VENT) FOR THE NEW SINK AND THE
 NEW LAV. SEE REDLINED COMMENTS ON PLAN.
 2. NEW SINK SHALL CONNECT DOWNSTREAM OF THE BATHROOM
 GROUP, OR THE SHOWER SHALL BE INDIVIDUALLY VENTED. SEE
 REDLINED COMMENTS ON THE PLAN.
 3. ALL WORK PER STATE AND CITY CODES SUBJECT TO FIELD
 INSPECTOR'S APPROVAL
  
  
  
 20020973 134 GREYMON DR
 MP 18090722

Review Stop Z ZONING
Rev No 1 Status P Date 2020-03-04 Cont ID  
Sent By fmittner Date 2020-03-04 Time 10:01 Rev Time 0.00
Received By fmittner Date 2020-03-04 Time 10:01 Sent To  
Notes
2020-03-02 17:19:04ADDED BAR SINK ON SECOND FLOOR OF REAR BUILDING. JG.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved