|
 |
 |
 |
 |
 |
Plan Review Details - Permit 20020731
Plan Review Stops For Permit 20020731 |
Review Stop |
AD |
ADDRESSING |
Rev No |
1 |
Status |
P |
Date |
2020-02-24 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2020-02-24 |
Time |
15:12 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2020-02-24 |
Time |
15:12 |
Sent To |
|
|
Notes |
2020-02-24 15:12:52 | @ ADDRESS CREATED |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2020-03-23 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-03-23 |
Time |
16:43 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-03-23 |
Time |
16:43 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2020-03-09 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-03-09 |
Time |
12:11 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-03-09 |
Time |
11:44 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2020-03-24 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2020-03-24 |
Time |
09:52 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2020-03-23 |
Time |
13:43 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2020-03-13 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2020-03-13 |
Time |
08:00 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2020-02-20 |
Time |
14:07 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2020-03-09 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-03-09 |
Time |
12:15 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-03-09 |
Time |
12:15 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2020-03-24 |
|
|
Cont ID |
|
Sent By |
elevesqu |
Date |
2020-03-24 |
Time |
08:51 |
Rev Time |
0.00 |
Received By |
elevesqu |
Date |
2020-03-24 |
Time |
08:51 |
Sent To |
|
|
Notes |
2020-03-24 08:51:36 | CONDUIT INSTALLATION ONLY | | | | SEPARATE PERMIT REQUIRED FOR PHOTOMETRICS, LIGHT POLE | | PLACEMENT AND LIGHT POLE SPEC | | | | LIZ LEVESQUE, URBAN DESIGN PLANNER | | 561 822 1426 | | [email protected] |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2020-03-12 |
|
|
Cont ID |
|
Sent By |
eleveque |
Date |
2020-03-12 |
Time |
16:52 |
Rev Time |
0.00 |
Received By |
elevesqu |
Date |
2020-03-12 |
Time |
16:52 |
Sent To |
|
|
Notes |
2020-03-12 16:51:43 | POLES 7TH STREET FROM DIVISION TO SAPODILLA: | | POLE PROPOSED IN FRONT OF 715 7TH STREET ON CORNER OF | | DIVISION AND 7TH STREET IS PLACED DIRECTLY IN 5 FT | | SIDEWALK CLEARANCE. PLEASE RELOCATE | | APPEARS THAT EXISTING TREES MAY INTERFERE WITH LIGHT | | FROM LIGHT POLE #12. | | PLEASE CONFIRM THAT THE HEIGHT OF THE POLE #13 WILL NOT | | INTERFERE WITH THE ELECTRICAL WIRES ABOVE | | | | POELS ALONG 7TH FROM SAPODILLA TO ROSEMARY AND ALONG | | ALLEY: | | NEED TO DETERMINE LOCATION OF PROPOSED LIGHT POLES IN | | COORDINATION WITH PROPOSED NEW LANDSCAPE ALONG 7TH | | STREET AND ALLEY. PLEASE SUBMIT PROPOSED LANDSCAPE PLAN | | AND LOCATE LIGHT POLES ON PLANS FOR REFERENCE | | | | COMMENT FROM ENGINEERING DEPARTMENT: POLES ALONG 7TH | | STREET DO NOT MATCH CITY APPROVED SPECS FOR LIGHTING. | | PLEASE MATCH 16' LIKE POLES ALONG ROSEMARY AVENUE | | BETWEEN BANYAN AND 8TH AND ROSEMARY AVENUE NORTH OF 8TH | | STREET | | | | COMMENT FROM ENGINEERING DEPT: SUGGEST A SMALERL | | MOUNTING HEIGHT OF 17.5' FOR LIGHTING TYPE SK ALONG | | ALLEYWAY | | | | PLEASE NOTE, FIXTURES NEED TO HAVE A 7 PIN RECEPTACLE. | | | | LIZ LEVESQUE, URBAN DESIGN PLANNER | | [email protected] | | 561 822 1426 | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |