Plan Review Stops For Permit 20020422 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
P |
Date |
2020-04-01 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2020-04-01 |
Time |
14:36 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2020-04-01 |
Time |
12:57 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
F |
Date |
2020-03-16 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2020-03-16 |
Time |
15:50 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2020-03-16 |
Time |
15:20 |
Sent To |
|
|
Notes |
2020-03-16 16:10:32 | ROOF RECOVER FOURTH BUILDING REVIEW CHECKLIST. | | CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS. | | | | 1- OK. | | | | ORIGINAL COMMENT: | | 2- NEED FIELD UPLIFT TESTING TAS 105 AND MOISTURE | | CONTENT TEST TAS 126 (2 COPIES) AS REQUIRED BY NOTE #14 | | ON PAGE 3 OF 67 OF FL16443-R17 FOR RECOVER | | INSTALLATIONS. NOTE: THIS NOTE STATES THAT FOR RECOVER | | INSTALLATIONS, THE EXISTING ROOF SHALL BE EXAMINED IN | | ACCORDANCE WITH FBC 1521. | | THE REQUIRED TESTS ARE TO VERIFY THAT EXISTING ROOF IS | | ADEQUATE FOR RECOVER INSTALLATION. | | | | RESPONSE: | | NEED FIELD UPLIFT TESTING TAS 105 AND MOISTURE CONTENT | | TEST TAS 126. THESE TESTS NEED TO BE DONE BY AN | | APPROVED TESTING AGENCY AND ALL TEST REPORTS, INCLUDING | | CALCULATIONS SHALL BE SIGNED BY A REGISTERED DESIGN | | PROFESSIONAL. SEE SCOPE ON TESTING APPLICATION | | STANDARDS 105 AND 126 RESPECTIVELY. TESTING SUBMITTED | | IS NOT DONE BY AN APPROVED TESTING AGENCY AND IS NOT | | SIGNED BY REGISTERED DESIGN PROFESSIONAL. | | SEC. 107.2.1 CITY AMENDMENTS. | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2020-03-02 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2020-03-02 |
Time |
15:12 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2020-03-02 |
Time |
14:35 |
Sent To |
|
|
Notes |
2020-03-02 14:36:52 | ROOF RECOVER THIRD BUILDING REVIEW CHECKLIST. | | CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS. | | | | 1- OK. | | | | ORIGINAL COMMENT: | | 2- NEED FIELD UPLIFT TESTING TAS 105 AND MOISTURE | | CONTENT TEST TAS 126 (2 COPIES) AS REQUIRED BY NOTE #14 | | ON PAGE 3 OF 67 OF FL16443-R17 FOR RECOVER | | INSTALLATIONS. NOTE: THIS NOTE STATES THAT FOR RECOVER | | INSTALLATIONS, THE EXISTING ROOF SHALL BE EXAMINED IN | | ACCORDANCE WITH FBC 1521. | | THE REQUIRED TESTS ARE TO VERIFY THAT EXISTING ROOF IS | | ADEQUATE FOR RECOVER INSTALLATION. | | | | RESPONSE: | | REPEAT COMMENT. NOT ADDRESSED. | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2020-02-26 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2020-02-26 |
Time |
16:03 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2020-02-26 |
Time |
15:16 |
Sent To |
|
|
Notes |
2020-02-26 15:19:26 | ROOF RECOVER SECOND BUILDING REVIEW CHECKLIST. | | CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS. | | | | 1- MAXIMUM DESIGN PRESSURES FOR SELECTED ASSEMBLY SC-95 | | FROM FLORIDA PRODUCT APPROVAL FL16443-R17 DOESN'T MEET | | THE DESIGN PRESSURE FOR ALL ROOF ZONES. SEC. 1609.1 | | FBC-BUILDING. | | NEED TO PROVIDE SIGNED AND SEALED RAS 117 CALCULATIONS | | (2 COPIES) AS REQUIRED BY NOTE#9 ON PAGE 2 OF 67 OF | | PRODUCT APPROVAL SUBMITTED. | | | | RESPONSE: | | RAS 117 CALCULATIONS SUBMITTED NEED TO BE REVISED. | | ENGINEER STATED THAT CONCRETE FASTENERS NEED TO HAVE | | MIN. 1 INCH EMBEDMENT. ACCORDING TO NOTE #2 ON PAGE 2 | | OF 67 OF FLORIDA PRODUCT APPROVAL FL16443-R17 | | SUBMITTED, THE MINIMUM EMBEDMENT REQUIRED IS 1.25 | | INCHES. ENGINEER TO REVISE SPECIFICATIONS OR PROVIDE | | COMPLETE ENGINEERING SHOWING THAT THE 1 INCHE EMBEDMENT | | IS ADEQUATE. SEC. 107.2.1.2 CITY AMENDMENTS. | | | | 2- NEED FIELD UPLIFT TESTING TAS 105 AND MOISTURE | | CONTENT TEST TAS 126 (2 COPIES) AS REQUIRED BY NOTE #14 | | ON PAGE 3 OF 67 OF FL16443-R17 FOR RECOVER | | INSTALLATIONS. NOTE: THIS NOTE STATES THAT FOR RECOVER | | INSTALLATIONS, THE EXISTING ROOF SHALL BE EXAMINED IN | | ACCORDANCE WITH FBC 1521. | | THE REQUIRED TESTS ARE TO VERIFY THAT EXISTING ROOF IS | | ADEQUATE FOR RECOVER INSTALLATION. | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2020-02-12 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2020-02-12 |
Time |
10:52 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2020-02-11 |
Time |
17:52 |
Sent To |
|
|
Notes |
2020-02-12 10:53:22 | ROOF RECOVER BUILDING REVIEW COMMENTS | | CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS. | | | | 1- MAXIMUM DESIGN PRESSURES FOR SELECTED ASSEMBLY SC-95 | | FROM FLORIDA PRODUCT APPROVAL FL16443-R17 DOESN'T MEET | | THE DESIGN PRESSURE FOR ALL ROOFF ZONES. SEC. 1609.1 | | FBC-BUILDING. | | NEED TO PROVIDE SIGNED AND SEALED RAS 117 CALCULATIONS | | (2 COPIES) AS REQUIRED BY NOTE#9 ON PAGE 2 OF 67 OF | | PRODUCT APPROVAL SUBMITTED. | | | | 2- NEED FIELD UPLIFT TESTING TAS 124 (2 COPIES) AS | | REQUIRED BY NOTE #12 ON PAGE 3 OF 67 OF FL16443-R17 | | FOR BONDED INSULATION OR MEMBRANE OVER EXISTING | | SUBSTRATES IN A RECOVER INSTALLATION. | | FAC 61G20-3.001SEC. 1609.1 FBC-BUILDING. | | | | 3- NEED FIELD UPLIFT TESTING TAS 105 AND MOISTURE | | CONTENT TEST TAS 126 (2 COPIES) AS REQUIRED BY NOTE #14 | | ON PAGE 3 OF 67 OF FL16443-R17 FOR RECOVER | | INSTALLATIONS. NOTE: THIS NOTE STATES THAT FOR RECOVER | | INSTALLATIONS, THE EXISTING ROOF SHALL BE EXAMINED IN | | ACCORDANCE WITH FBC 1521. | | THE REQUIRED TESTS ARE TO VERIFY THAT EXISTING ROOF IS | | ADEQUATE FOR RECOVER INSTALLATION. | | | | 4-THERE ARE SEVERAL BUILDINGS AND ROOF AREAS IN THIS | | PROPERTY. PROVIDE SKETCH (2 COPIES) SHOWING THE ROOF | | AREA WHERE WORK IS GOING TO TAKE PLACE. SEC. 107.2.1 | | CITY AMENDMENTS. | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2020-04-01 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2020-04-01 |
Time |
14:36 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2020-04-01 |
Time |
12:57 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2020-03-16 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2020-03-16 |
Time |
16:10 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2020-03-13 |
Time |
13:02 |
Sent To |
I |
|
Notes |
2020-03-16 13:02:15 | RESUB ROUTED TO JGOMEZ |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2020-03-02 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2020-03-02 |
Time |
15:14 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2020-02-28 |
Time |
13:32 |
Sent To |
I |
|
Notes |
2020-03-02 13:32:16 | RESUB ROUTED TO JGOMEZ |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2020-02-26 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2020-02-26 |
Time |
16:03 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2020-02-25 |
Time |
13:23 |
Sent To |
|
|
Notes |
2020-02-26 13:23:58 | RESUB ROUTED TO JGOMEZ |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2020-02-12 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2020-02-12 |
Time |
10:54 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2020-02-11 |
Time |
12:29 |
Sent To |
|
|
Notes |
|
|