Plan Review Details - Permit 20020134
Plan Review Stops For Permit 20020134
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status P Date 2020-02-24 Cont ID  
Sent By pvalenti Date 2020-02-24 Time 06:50 Rev Time 0.00
Received By pvalenti Date 2020-02-24 Time 06:50 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2020-02-10 Cont ID  
Sent By pvalenti Date 2020-02-10 Time 10:44 Rev Time 0.00
Received By pvalenti Date 2020-02-10 Time 10:44 Sent To  
Notes
2020-02-10 10:45:19***CORRECTIONS***
 PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
 FBC M = FBC MECHANICAL
  
 ASBESTOS COMMENTS:
  
 FAILED PLAN REVIEW, COMMERCIAL:
  
 PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
 THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO
 [email protected]. THE INFORMATION SHOULD BE IN PDF
 FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE INCLUDE
 THE PERMIT NUMBER AND ?ASBESTOS? IN THE SUBJECT LINE.
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-02-26 Cont ID  
Sent By pvalenti Date 2020-02-26 Time 15:37 Rev Time 0.00
Received By pvalenti Date 2020-02-26 Time 15:37 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-02-10 Cont ID  
Sent By pvalenti Date 2020-02-10 Time 10:45 Rev Time 0.00
Received By pvalenti Date 2020-02-10 Time 10:45 Sent To  
Notes
2020-02-10 11:02:42***CORRECTIONS***
 PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
 FBC M = FBC MECHANICAL
  
 BUILDING REVIEW DENIED:
  
 1) FBC B/WPB AMENDMENTS 107.1, THE SUBMITTED PLANS NEED
 TO BE SIGNED AND SEALED BY THE DESIGN PROFESSIONAL.
  
 2) FBC B 107.2.1, PROVIDE ENGINEER APPROVED DETAILS ON
 TEMPORARY SUPPORT, AS IT APPEARS THAT STRUCTURAL
 BEARING COLUMNS AND WALLS ARE TO BE REMOVED.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2020-02-24 Cont ID  
Sent By jleahy Date 2020-02-24 Time 08:00 Rev Time 0.00
Received By jleahy Date 2020-02-24 Time 08:00 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2020-02-21 Cont ID  
Sent By jleahy Date 2020-02-21 Time 09:43 Rev Time 0.00
Received By jleahy Date 2020-02-21 Time 09:43 Sent To P
Notes
2020-02-21 09:44:23NEED TO SUBMIT AN ELECTRICAL PERMIT JLEAHY

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2020-03-02 Cont ID  
Sent By pleduc Date 2020-03-02 Time   Rev Time 0.00
Received By pleduc Date 2020-03-02 Time 15:02 Sent To P
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2020-02-12 Cont ID  
Sent By pleduc Date 2020-02-12 Time   Rev Time 0.00
Received By pleduc Date 2020-02-12 Time 13:52 Sent To E
Notes
2020-02-12 13:58:28THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 1) THERE IS INSUFFICIENT INDORMATION PROVIDED TO
 DETERMINE THE ACTAUL SCOPE OF WORK AND EXACTLY WHAT IS
 BEING DONE.
  
 THE APPLICATION SHEET INDICATES "REMOVE INTERIOR WALL
 AND TILE FLOOR"
  
 THE SHEET EXG100 IS AN OPEN FLOOR PLAN WITH NUMEROUS
 DOTTED LINES AND FEW COMMENTS BUT NONE WITH REMOVE WALL
 NOR TILE FLOOR.
  
 THE SHEET A100 INDICATES COMPLEX INTERIOR DESIGN WITH
 NO CLEAR INDICATION OF ANY WALL REMOVAL NOT TILE WORK
  
 PLEASE REVIEW AND PROVIDE SEPECIFIC DETAILS OF THE
 SCOPE OF WORK AND EXACTLY WHERE THE WORK IS LOCATED AND
 EXACTLY WHAT IS PROPOSED.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-03-05 Cont ID  
Sent By tklarge Date 2020-03-05 Time 05:04 Rev Time 0.00
Received By tklarge Date 2020-02-25 Time 13:30 Sent To  
Notes
2020-02-26 13:30:17RESUB ROUTED TO PVALENTI

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-02-25 Cont ID  
Sent By tklarge Date 2020-02-25 Time 05:32 Rev Time 0.00
Received By tklarge Date 2020-02-05 Time 13:37 Sent To  
Notes
2020-02-07 13:37:24GIVEN TO PVALENTI

Review Stop P PLUMBING
Rev No 2 Status P Date 2020-03-05 Cont ID  
Sent By tklarge Date 2020-03-05 Time 05:04 Rev Time 0.00
Received By tklarge Date 2020-03-05 Time 04:55 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-02-25 Cont ID  
Sent By tklarge Date 2020-02-25 Time 05:32 Rev Time 0.00
Received By tklarge Date 2020-02-25 Time 05:13 Sent To  
Notes
2020-02-25 05:23:26 
 1) THERE IS INSUFFICIENT INFORMATION PROVIDED TO
 DETERMINE THE ACTUAL SCOPE OF WORK AND EXACTLY WHAT IS
 BEING DONE.WPB AMEND. TO FBC SEC. 107.2.1.
 2) SHT. EXG100 SHOWS FOUR TOILET ROOMS. INDICATE ON THE
 PLANS IF THE FIXTURES ARE BEING REMOVED FROM THESE
 TOILET ROOMS AND HOW REQUIRED SANITARY FACILITIES ARE
 BEING PROVIDED. WPB AMEND. TO FBC SEC. 107.2.1.
 3) SHT. A100 HAS BEEN SUBMITTED BUT IS A COMPLEX
 BUILDOUT. CLARIFY THE REASON OF THE SUBMITTAL OF THIS
 SHEET.WPB AMEND. TO FBC SEC. 107.2.1.
 4) PLEASE REVIEW AND PROVIDE SEPECIFIC DETAILS OF THE
 SCOPE OF WORK AND EXACTLY WHERE THE WORK IS LOCATED AND
 EXACTLY WHAT IS PROPOSED.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  