Plan Review Details - Permit 20010929
Plan Review Stops For Permit 20010929
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2020-01-31 Cont ID  
Sent By rrossano Date 2020-01-31 Time   Rev Time  
Received By rrossano Date 2020-01-31 Time   Sent To I
Notes
2020-01-31 08:02:12PASSED WITH PROVISOS:
  
 1 - THE PAVER DRIVEWAY AGREEMENT IS A REQUIREMENT IF
 PAVERS ARE USED IN THE RIGHT OF WAY PORTION OF THE
 DRIVEWAY, WHICH CAN BE OBTAINED HERE: HTTP://WPB.ORG/DE
 PARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLI
 CATIONS. THE AGREEMENT MUST BE RECORDED AT PALM BEACH
 COUNTY COURTHOUSE - RECORDING DEPT. 4.25. A RECORDED
 COPY OF THIS DOCUMENT SHOULD BE FAXED TO (561)
 494-1116. ATTENTION: DRIVEWAY REVIEWER. DOCUMENT NEEDS
 TO BE RECORDED PRIOR TO FINAL SIGN OFF.
  
 2 - CALL FOR LOCATES, DIAL 811 BEFORE YOU DIG. FOR MORE
 INFO ON "CALL BEFORE YOU DIG", GO TO
 HTTP://WWW.SUNSHINE811.COM (REF: UNDERGROUND FACILITY
 DAMAGE PREVENTION AND SAFETY ACT, FLORIDA STATUTE,
 CHAPTER 556.)
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR WPB, FL 33401 (MAILING
 ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1098
 FAX: (561) 494-1116 MOBILE: (561) 246-9525
 EMAIL: [email protected] WWW.WPB.ORG/ENGINEERING
  
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-02-03 Cont ID  
Sent By ccarvaja Date 2020-02-03 Time 08:08 Rev Time 0.00
Received By ccarvaja Date 2020-01-23 Time 13:09 Sent To  
Notes
2020-01-30 07:33:07ROUTED TO ENGINEERING BOX
2020-01-27 13:09:37ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 1 Status P Date 2020-01-29 Cont ID  
Sent By rfalcone Date 2020-01-29 Time 10:00 Rev Time 0.00
Received By rfalcone Date 2020-01-29 Time 10:00 Sent To I
Notes
***NONE***