Plan Review Details - Permit 20010847
Plan Review Stops For Permit 20010847
Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2020-02-21 Cont ID  
Sent By rrossano Date 2020-02-21 Time   Rev Time 0.00
Received By rrossano Date 2020-02-21 Time   Sent To I
Notes
2020-02-21 07:15:45PASSED WITH PROVISOS:
  
 1 - THE PAVER DRIVEWAY AGREEMENT IS A REQUIREMENT IF
 PAVERS ARE USED IN THE RIGHT OF WAY PORTION OF THE
 DRIVEWAY. EMAIL [email protected] TO REQUEST AN EMAILED
 PDF COPY OF THE AGREEMENT. THE AGREEMENT MUST BE
 RECORDED AT PALM BEACH COUNTY COURTHOUSE - RECORDING
 DEPT. 4.25. A RECORDED COPY OF THIS DOCUMENT SHOULD BE
 FAXED TO (561) 494-1116. ATTENTION: DRIVEWAY REVIEWER.
 DOCUMENT NEEDS TO BE RECORDED PRIOR TO FINAL SIGN OFF.
  
 2 - THERE ARE WATER AND SEWER LINES IN THE VICINITY OF
 THIS PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE
 STATUTES, YOU MUST CALL 811 FOR UTILITY LOCATES AT
 LEAST TWO FULL BUSINESS DAYS IN ADVANCE OF ANY
 CONSTRUCTION OR DEMOLITION WORK. MORE INFORMATION CAN
 BE FOUND HERE: HTTP://WWW.SUNSHINE811.COM/
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR WPB, FL 33401 (MAILING
 ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1098
 FAX: (561) 494-1116 MOBILE: (561) 246-9525
 EMAIL: [email protected] WWW.WPB.ORG/ENGINEERING
  
  
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2020-01-31 Cont ID  
Sent By rrossano Date 2020-01-31 Time   Rev Time  
Received By rrossano Date 2020-01-31 Time   Sent To I
Notes
2020-01-31 07:56:58PLEASE ADDRESS ZONING COMMENTS.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-02-21 Cont ID  
Sent By spalmer Date 2020-02-21 Time 18:13 Rev Time 0.00
Received By spalmer Date 2020-02-04 Time 13:40 Sent To  
Notes
2020-02-19 18:17:21RESUB ROUTED TO ENGINEERING INBOX
2020-02-05 13:40:33RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-02-03 Cont ID  
Sent By ccarvaja Date 2020-02-03 Time 09:07 Rev Time 0.00
Received By ccarvaja Date 2020-01-22 Time 14:20 Sent To Z
Notes
2020-01-30 07:31:01ROUTED TO ENGINEERING BOX

Review Stop Z ZONING
Rev No 2 Status P Date 2020-02-19 Cont ID  
Sent By rfalcone Date 2020-02-19 Time 09:38 Rev Time 0.00
Received By rfalcone Date 2020-02-19 Time 09:38 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2020-01-29 Cont ID  
Sent By ccarvaja Date 2020-02-03 Time 09:07 Rev Time 0.00
Received By rfalcone Date 2020-01-29 Time 10:13 Sent To I
Notes
2020-01-29 10:14:551/29/20 FAILED.
  
 PLEASE INCLUDE THE DIMENSIONS OF THE PROPOSED DRIVEWAY
 AND WALKWAY ON THE SURVEY. KEEP IN MIND THE LANDSCAPING
 REQUIREMENTS FOR THE FRONT YARD.
  
 ZLDR SEC. 94-483(A), LOCATION AND SURFACE. REQUIRED
 OFF-STREET PARKING SPACES FOR LESS THAN THREE
 RESIDENTIAL DWELLING UNITS SHALL BE PROVIDED ON THE
 PROPERTY ON WHICH THE UNITS ARE LOCATED. REQUIRED
 PARKING MAY BE LOCATED IN A FRONT YARD; HOWEVER, THE
 LESSER OF 1,000 SQUARE FEET OR 75 PERCENT OF THE FRONT
 YARD AREA SHALL BE LANDSCAPED WITH LIVING PLANT
 MATERIAL (SUCH AS GRASS, GROUND COVER, SHRUBS, HEDGES,
 VINES OR TREES).
  
 IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO
 CONTACT ME.
  
 RACHEL FALCONE, ASSOCIATE PLANNER
 DEVELOPMENT SERVICES DEPARTMENT
 E-MAIL: [email protected]
 TEL: (561) 822-1442
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved