Plan Review Details - Permit 20010068
Plan Review Stops For Permit 20010068
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2020-01-23 Cont ID  
Sent By rrossano Date 2020-01-23 Time   Rev Time  
Received By rrossano Date 2020-01-23 Time   Sent To I
Notes
2020-01-17 07:12:42PASSED WITH PROVISOS:
  
 1 - CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB
 CONSTRUCTION STANDARD DETAIL GC-6 (WHEN DISTANCE
 BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER),
 OR STANDARD DETAIL GC-7 (WHEN DISTANCE BETWEEN CURB OR
 EDGE OF PAVEMENT IS LESS THAN 10 FT.) SEE CITY STANDARD
 DETAILS AT LINK BELOW:
  
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 2 - CALL FOR LOCATES, DIAL 811 BEFORE YOU DIG. FOR MORE
 INFO ON "CALL BEFORE YOU DIG", GO TO
 HTTP://WWW.SUNSHINE811.COM (REF: UNDERGROUND FACILITY
 DAMAGE PREVENTION AND SAFETY ACT, FLORIDA STATUTE,
 CHAPTER 556.)
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR WPB, FL 33401 (MAILING
 ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1098
 FAX: (561) 494-1116 MOBILE: (561) 246-9525
 EMAIL: [email protected] WWW.WPB.ORG/ENGINEERING

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2020-01-15 Cont ID  
Sent By fmittner Date 2020-01-15 Time 10:36 Rev Time 0.00
Received By fmittner Date 2020-01-15 Time 10:34 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-01-24 Cont ID  
Sent By jslaught Date 2020-01-24 Time 14:52 Rev Time 0.00
Received By jslaught Date 2020-01-03 Time 12:56 Sent To  
Notes
2020-01-17 09:22:59TO ENG
2020-01-16 09:55:01TO ENGINEERING
  
2020-01-06 12:56:53ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 1 Status P Date 2020-01-15 Cont ID  
Sent By rfalcone Date 2020-01-08 Time 16:03 Rev Time 0.00
Received By fmittner Date 2020-01-08 Time 16:03 Sent To HIST
Notes
2020-01-08 16:06:071/8/20 FAILED.
  
 AN ADDITIONAL DRIVEWAY ALONG LAKE AVENUE IS NOT
 PERMITTED. PURUSANT ZLDR SEC. 94-312(C)(3)(III), TWO
 DRIVEWAYS EACH WITH A WIDTH OF NO GREATER THAN TEN FEET
 AT THE PROPERTY LINE OR WHERE THE DRIVEWAY ADJOINS THE
 APRON IF THE APRON IS NOT LOCATED WHOLLY WITHIN THE
 RIGHT-OF-WAY, PROVIDED THAT THE DRIVEWAYS SHALL BE ON
 TWO DIFFERENT STREET FRONTAGES OR ON ONE STREET
 FRONTAGE AND THE ALLEY.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO
 CONTACT ME.
  
 RACHEL FALCONE, ASSOCIATE PLANNER
 DEVELOPMENT SERVICES DEPARTMENT
 E-MAIL: [email protected]
 TEL: (561) 822-1442


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved