Plan Review Details - Permit 19121047
Plan Review Stops For Permit 19121047
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-02-18 Cont ID  
Sent By rmcdouga Date 2020-02-18 Time 15:06 Rev Time 0.00
Received By rmcdouga Date 2020-02-18 Time 14:35 Sent To E
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-01-03 Cont ID  
Sent By rmcdouga Date 2020-01-03 Time 17:51 Rev Time 0.00
Received By rmcdouga Date 2020-01-03 Time 14:38 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2020-02-20 Cont ID  
Sent By jleahy Date 2020-02-20 Time 13:32 Rev Time 0.00
Received By jleahy Date 2020-02-20 Time 13:32 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-01-02 Cont ID  
Sent By jleahy Date 2020-01-02 Time 10:55 Rev Time 0.00
Received By jleahy Date 2020-01-02 Time 10:55 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2020-01-02 Cont ID  
Sent By lcrespo Date 2020-01-02 Time 18:53 Rev Time 0.00
Received By lcrespo Date 2020-01-02 Time 18:53 Sent To  
Notes
2020-01-02 18:54:07GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN
 THIS SUBMITTAL PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN
 PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND PLANS
 WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE
 RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT
 REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER
 THE WPB AMENDMENTS TO FBC SEC. 107.2.1.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-02-24 Cont ID  
Sent By lcrespo Date 2020-02-24 Time 16:58 Rev Time 0.00
Received By lcrespo Date 2020-02-11 Time 13:54 Sent To  
Notes
2020-02-12 13:54:56RESUB ROUTEDTO JLEAHY

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-01-03 Cont ID  
Sent By rmcdouga Date 2020-01-03 Time 17:51 Rev Time 0.00
Received By rmcdouga Date 2019-12-27 Time 15:09 Sent To I
Notes
2019-12-27 15:09:47ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2020-02-24 Cont ID  
Sent By lcrespo Date 2020-02-24 Time 16:58 Rev Time 0.00
Received By lcrespo Date 2020-02-24 Time 16:42 Sent To  
Notes
2020-02-24 16:58:4702/24/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 6:30 AM 7:30 / 2:00 PM TO 5:00 PM
 [email protected]
 561-701-6437
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-01-02 Cont ID  
Sent By lcrespo Date 2020-01-02 Time 18:52 Rev Time 0.00
Received By lcrespo Date 2020-01-02 Time 11:23 Sent To  
Notes
2020-01-02 18:55:0901/02/2020 1ST POOL REVIEW **DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. POOL GAS HEATER DOES NOT HAVE THE MODEL OR SIZE,
 PLEASE PROVIDE ON SHEET 1 OR HIGHLIGHT ON SPECS PER THE
 WPB AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
 2. THE POOL HEATER SHALL HAVE A MINIMUM THERMAL
 EFFICIENCY OF 82% PER THE 2017 FBC-ENERGY SEC.
 R403.10.4.
 3. THERE IS A COLLECTOR TANK ON A RESIDENTIAL POOL,
 PLEASE CLARIFY THE REASON FOR THE INSTALLATION OF THIS
 APERTURE ON THIS SYSTEM PER THE WPB AMENDMENTS TO THE
 FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
 4. MAIN DRAIN SYSTEM AND SERVICE OVERFLOW SYSTEMS WITH
 DISCHARGE TO COLLECTOR TANKS SHALL BE SIZED A MAXIMUM
 3' PER SECOND AND IT IS SHOWING 3.9' PER SECOND AS IT
 NEEDS TO MEET THE SAME CRITERIA OF THE CODE PER THE
 2017 FBC SEC. 454.1.6.5.8 SWIMMING POOLS AND BATHING
 PLACES (PUBLIC AND PRIVATE) .
 5. DOES THE COLLECTOR TANK HAVE A DRAINING SYSTEM AND
 HOW IS THE COLLECTOR TANK GOING TO BE CLEAN OR
 SERVICED, PLEASE CLARIFY PER THE WPB AMENDMENTS TO THE
 FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS?
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  
  

Review Stop Z ZONING
Rev No 1 Status P Date 2019-12-30 Cont ID  
Sent By rfalcone Date 2019-12-30 Time 14:15 Rev Time 0.00
Received By rfalcone Date 2019-12-30 Time 14:15 Sent To  
Notes
***NONE***