Plan Review Details - Permit 19120811
Plan Review Stops For Permit 19120811
Review Stop G GAS REVIEW
Rev No 3 Status P Date 2020-01-17 Cont ID  
Sent By tklarge Date 2020-01-17 Time 14:48 Rev Time 0.00
Received By tklarge Date 2020-01-17 Time 14:43 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2020-01-09 Cont ID  
Sent By tklarge Date 2020-01-09 Time 08:13 Rev Time 0.00
Received By tklarge Date 2020-01-09 Time 06:12 Sent To  
Notes
2020-01-09 08:08:341) SUBMIT TWO COPIES OF A HOUSE PLAN / FLOOR PLAN
 SHOWING THE LOCATION OF THE TANKLESS WATER HEATER AND
 THE LOCATION AND DISTANCE OF ANY OPERABLE DOORS OR
 WINDOWS IN RELATION TO THE TANKLESS WATER HEATER. THE
 LOCATION OF THE TANKLESS WATER HEATER SHALL COMPLY WITH
 THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. THE HOUSE
 PLAN / FLOOR PLAN CAN BE HAND DRAWN. WPB AMEND. TO FBC
 SEC. 107.2.1. 2ND REQUEST.
 2) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL
 GAS SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1)
 THRU 402.4 (37) OR 2017 FBC-RES. SEC. G2413.3, G2412.8,
 G2413.1, G2413.2, & G2413.3. 2ND REQUEST.
 3) THERE ARE FOUR COPIES OF THE GAS PLAN AND SIX COPIES
 OF THE WATER HEATER SPECS. SUBMIT TWO COPIES OF EACH
 REQUIRED DOCUMENT AND REMOVE THE EXTRA COPIES.WPB
 AMEND. TO FBC SEC. 107.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2019-12-23 Cont ID  
Sent By tklarge Date 2019-12-23 Time 05:36 Rev Time 0.00
Received By tklarge Date 2019-12-23 Time 05:10 Sent To  
Notes
2019-12-23 05:36:411) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM
 ON THE PLAN PER 2017 FBC-FUEL GAS SEC.402.1, 402.4.3
 THRU 402.6 OR 2017 FBC RES. SEC. G2413.2, G2413.4.3.
 2) INDICATE ON THE PLAN IF THE TANKLESS WATER HEATERS
 ARE THE ONLY GAS APPLIANCES ON THIS SYSTEM. IF NOT,
 SUBMIT A COMPLETE GAS RISER SHOWING ALL PIPE SIZES,
 TYPE OF PIPE, THE DEVELOPED LENGTH TO THE FURTHEST GAS
 OUTLET, THE BTU LOAD OF EACH APPLIANCE, THE PSI OF THE
 SYSTEM, THE TYPE OF GAS AND THE TOTAL BTU LOAD ON THE
 SYSTEM. THESE REQUIREMENTS ALSO APPLY TO A NEW GAS
 SYSTEM.
 3) SUBMIT TWO COPIES OF A HOUSE PLAN / FLOOR PLAN
 SHOWING THE LOCATION OF THE TANKLESS WATER HEATER AND
 THE LOCATION AND DISTANCE OF ANY OPERABLE DOORS OR
 WINDOWS IN RELATION TO THE TANKLESS WATER HEATER. THE
 LOCATION OF THE TANKLESS WATER HEATER SHALL COMPLY WITH
 THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. THE HOUSE
 PLAN / FLOOR PLAN CAN BE HAND DRAWN. WPB AMEND. TO FBC
 SEC. 107.2.1.
 4) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL
 GAS SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1)
 THRU 402.4 (37) OR 2017 FBC-RES. SEC. G2413.3, G2412.8,
 G2413.1, G2413.2, & G2413.3.
 5) CITY RECORDS SHOW AN EXISTING GAS SYSTEM FOR THIS
 ADDRESS. THE BTU LOAD OF THE EXISTING GAS SYSTEM MUST
 BE ADDED INTO THE TOTAL BTU LOAD ON THE SYSTEM TO
 ENSURE THE EXISTING SYSTEM IS PROPERLY SIZED. IF
 UNDERSIZED, THE EXISTING SYSTEM MUST BE REDONE TO
 ENSURE A SAFE OPERATING SYSTEM. SUBMIT A GAS PIPING
 RISER DIAGRAM THAT SHOWS THE TYPE OF EXISTING
 APPLIANCE, THE BTU LOAD OF EACH APPLIANCE, THE PIPE
 SIZE AND TYPE OF PIPE TO EACH APPLIANCE, AND THE
 DISTANCE OF THE LONGEST LENGTH OF PIPING FROM THE POINT
 OF DELIVERY TO THE MOST REMOTE OUTLET AND THE LOAD OF
 THE SECTION. NOTE: IF THE EXISTING SYSTEM IS LESS THAN
 A 2 PSI SYSTEM AND THE SYSTEM PRESSURE IS INCREASED TO
 2 PSI, A LINE PRESSURE REGULATOR IS REQUIRED AT ALL THE
 EXISTING APPLIANCES. FGC SECS. 401.4, 401.8, 402.1,
 402.2, 402.3 OR FBCR SECS.G2412.4, G2412.8, G2413.1,
 G2413.2, G2413.3.
 6) SHOW THE TYPE OF PIPE INSTALLED ABOVEGROUND TO THE
 WATER HEATERS AND SHOW ALL PIPE SIZES. WPB AMEND. TO
 FBC SEC. 107.2.1.
 7) THE SUBMITTED SPECS FOR THE WATER HEATERS SHOW THE
 MAXIMUM OPERATING PRESSURE OF 10.5 IN OF WATER COLUMN.
 IF THE GAS SYSTEM PRESSURE IS 12 INCHES OF WATER
 COLUMN, A REGULATOR MAY BE REQUIRED AT THE WATER HEATER
 UNITS.
  
 NOTE: A SEPARATE PERMIT WILL BE REQUIRED FOR ANY
 ASSOCIATED ELECTRIC WORK.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2020-01-17 Cont ID  
Sent By tklarge Date 2020-01-17 Time 14:48 Rev Time 0.00
Received By tklarge Date 2020-01-16 Time 16:38 Sent To  
Notes
2020-01-16 16:38:45RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-01-09 Cont ID  
Sent By tklarge Date 2020-01-09 Time 08:13 Rev Time 0.00
Received By tklarge Date 2020-01-08 Time 13:57 Sent To  
Notes
2020-01-08 13:57:29RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-12-23 Cont ID  
Sent By tklarge Date 2019-12-23 Time 05:36 Rev Time 0.00
Received By tklarge Date 2019-12-18 Time 14:17 Sent To I
Notes
2019-12-19 14:17:36PLUMB<5K

Review Stop P PLUMBING
Rev No 3 Status P Date 2020-01-17 Cont ID  
Sent By tklarge Date 2020-01-17 Time 14:48 Rev Time 0.00
Received By tklarge Date 2020-01-17 Time 14:48 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2020-01-09 Cont ID  
Sent By tklarge Date 2020-01-09 Time 08:13 Rev Time 0.00
Received By tklarge Date 2020-01-09 Time 08:13 Sent To  
Notes
2020-01-09 08:13:47SEE GAS COMMENTS.

Review Stop P PLUMBING
Rev No 1 Status F Date 2019-12-23 Cont ID  
Sent By tklarge Date 2019-12-23 Time 05:37 Rev Time 0.00
Received By tklarge Date 2019-12-23 Time 05:10 Sent To  
Notes
2019-12-23 05:37:55SEE GAS COMMENTS.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved