Plan Review Stops For Permit 19120807 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2020-06-24 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-06-24 |
Time |
09:18 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-06-24 |
Time |
09:18 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2020-04-24 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-04-24 |
Time |
16:36 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-04-24 |
Time |
16:36 |
Sent To |
|
|
Notes |
2020-04-24 16:33:41 | GENERATOR ENCLOSURE | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected]. | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | 1) BOTTOM HAND RAIL EXTENSION ON DRAWING 5.3 NEEDS TO | | COMPLY WITH FBC 1014.6 HANDRAIL EXTENSIONS. "CONTINUE | | TO SLOPE FOR THE DEPTH OF ONE TREAD BEYOND THE BOTTOM | | RISER". | | 2) GENERATOR HOUSING TIE DOWN (ATTACHMENT TO SLAB) | | NEEDS TO BE A SITE SPECIFIC SIGNED AND SEALED DETAIL | | SHOWING ATTACHMENT TYPE, SIZE, AMOUNT ETC. AND THE WIND | | DESIGN CRITERIA USED FOR DESIGN - FROM AN ARCHITECT OR | | ENGINEER TO COMPLY WITH WIND PRESSURES PER FBC 1609 | | (180MPH) | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2020-02-18 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-02-18 |
Time |
12:49 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-02-18 |
Time |
09:51 |
Sent To |
|
|
Notes |
2020-02-18 10:59:28 | GENERATOR ENCLOSURE | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | | | CORRECTIONS NEEDED - | | 1) PLEASE SHOW STAIRWAY HANDRAIL EXTENSIONS AT TOP AND | | BOTTOM OF STAIRS TO COMPLY WITH FBC 1014.6 | | 2) PLEASE PROVIDE STATE APPROVED PRE MANUFACTURED | | BUILDING DRAWINGS APPROVED BY A THIRD PARTY REVIEW OR | | SIGNED AND SEALED DRAWINGS FOR THE ON SITE CONSTRUCTION | | OF THE ENCLOSURE FBC WPB AMENDMENTS 107.3 EXCEPTION (1) | | 3) PLEASE PROVIDE A SIGNED AND SEALED SOIL REPORT FBC | | 1803.1 | | 4) PLEASE PROVIDE SIGNED AND SEALED ANCHORING DETAILS | | FOR THE PRE FAB BUILDING AND STAIR - SHOW TYPE, SIZE | | AND LOCATION OF ANCHORS. FBC WPB AMENDMENTS 107 | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2020-06-30 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-06-30 |
Time |
14:33 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-06-30 |
Time |
12:02 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2020-04-28 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-04-28 |
Time |
14:46 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-04-28 |
Time |
07:46 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2020-02-26 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-02-26 |
Time |
16:49 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-02-24 |
Time |
15:31 |
Sent To |
|
|
Notes |
2020-02-26 07:49:43 | FLORIDA BUILDING CODE 2017 6TH EDITION | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | NFPA 70 2014 EDITION | | | | JAKE LEAHY BN, BU, PX | | ELECTRICAL PLANS EXAMINER II | | 561-805-6713 | | [email protected] | | | | 1) VALUE FOR THE WORK SHOWN DOES NOT INCLUDE THE | | GENSETS. PLEASE SUBMIT A VALUE WHICH INCLUDES THE | | GENERATORS AND OTHER CUSTOMER SUPPLIED EQUIPMENT. | | | | 109.3 BUILDING PERMIT VALUATIONS. IF, IN THE OPINION OF | | THE BUILDING OFFICIAL, THE CLAIMED VALUATION OF | | BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS, | | MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE | | UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE | | DENIED, UNLESS THE APPLICANT CAN SHOW DETAILED, | | QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED CONTRACTS | | (EXCLUDING LAND VALUE) TO MEET THE APPROVAL OF THE | | BUILDING OFFICIAL. FOR PERMITTING PURPOSES, VALUATION | | OF BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT | | VALUE TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, | | MECHANICAL, INTERIOR FINISH, RELATIVE SITE WORK, | | ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS, | | OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE. | | VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED | | DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES | | (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY | | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT | | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. | | | | 2) NEED AN ELECTRICAL PERMIT FOR THE ELECTRICAL WORK. |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2020-04-21 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2020-04-21 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2020-04-20 |
Time |
09:09 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2020-02-13 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2020-02-13 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2020-02-11 |
Time |
09:38 |
Sent To |
|
|
Notes |
2020-02-13 11:39:40 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | INSPECTION. | | | | THE REMOVAL OF THE GENERATOR REQUIRES AN EVALUATION OF | | THE FIRE SPRINKLER AND FIRE ALARM SYSTEMS. | | | | | | 1) MODIFICATIONS TO THE FIRE SPRINKLER AND FIRE ALARM | | SYSTEM MAY BE REQUIRED DUE TO CHANGES. | | | | | | | | 2) ANY WORK ON THE FS AND FA SHALL BE DONE UNDER | | SEPARATE PERMITS AND SHOP DRAWINGS | | | | | | | | PETER LEDUC | | FIRE MARSHAL | | 561-804-4709 | | [email protected] |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
3 |
Status |
P |
Date |
2020-06-22 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-06-22 |
Time |
16:43 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-06-19 |
Time |
16:27 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
F |
Date |
2020-04-30 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-04-30 |
Time |
11:56 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-04-30 |
Time |
08:34 |
Sent To |
|
|
Notes |
2020-04-30 11:56:21 | | | 2ND REVIEW FBC-2017 PLUMBING/GAS | | PERMIT #19120807 | | 4/30/2020 | | | | CODES IN EFFECT: | | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | 2017 | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION | | 2017 | | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | EDITION 2017 | | | | PLAN REVIEW RESULTS: DENIED. | | | | 1) SHEET 4, UNDERGROUND GAS PIPING: SHOW THE WHERE | | GENERATOR BRANCH LINE CONNECTS TO THE MAIN LINE- | | SECTION 107.2.1 WPB. | | | | 2) P1.1: MODIFY THE ISOMETRIC DRAWING TO INDICATE THE | | LENGTH OF THE UNDERGROUND PIPING RUN FROM THE POINT OF | | CONNECTION AT THE MAIN UNDERGROUND LINE TO THE NEW GAS | | METER AT THE ENCLOSURE. IDENTIFY THE TYPE AND SIZE OF | | UNDERGROUND GAS PIPING, BURIAL DEPTH AND HOW THE PIPE | | WILL BE PROTECTED FROM DAMAGE- SECTIONS 402.4 AND 404.1 | | FBC FG. | | | | 3) P1.1: I HAVE REVIEWED THE SUBMITTED SHOP DRAWINGS | | AND PRODUCT APPROVAL FOR THE GENERATOR ENCLOSURE, AND | | THE CLARKE GENERATOR SPECIFICATIONS SUBMITTAL WHICH | | INCLUDES THE OPTIBLEND DUEL FUEL SYSTEM SPECS. I DO NOT | | SEE IN ANY OF THESE DOCUMENTS AN INTERNAL GAS PIPING | | ISOMETRIC OR LAYOUT DRAWING FOR CONNECTING THE | | GENERATORS TO THE NEW EXTERIOR GAS LINE AND SERVICE. | | PAGE 29 OF THE GENERATOR SPECS INDICATES THE OPTIBLEND | | KITS ARE SHIPPED WITH EACH ASSEMBLY PACKAGE TOGETHER, | | BUT NO CONNECTION DETAILS PROVIDED TO THE GAS SUPPLY | | SYSTEM. PLEASE MODIFY THE EXISTING ISOMETRIC DRAWING | | ACCORDINGLY AND ALSO PROVIDE A GAS PIPING LAYOUT FOR | | INSIDE THE ENCLOSURE. SHOW LOCATIONS OF REGULATORS, | | SHUT OFF VALVES, UNIONS AND INLET PRESSURE REQUIRED AT | | THE OPTIBLEND KIT AND GENERATOR. PLEASE SEE GAS | | PRESSURE INFO ON PAGE 23 AND 29 OF THE SPEC- SECTIONS | | 107.2.1 WPB. A) PLEASE CLARIFY HOW THE 18,000 SCFH | | TOTAL GAS LOAD WAS DETERMINED. WHICH CONVERSION OR | | CALULATION METHOD WAS USED?- SECTION 107.2.1 WPB. | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | | | CHRISTOPHER L. COLE | | MECHANICAL/PLUMBING PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | | | |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
F |
Date |
2020-02-21 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2020-02-21 |
Time |
09:11 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2020-02-17 |
Time |
17:16 |
Sent To |
|
|
Notes |
2020-02-21 09:11:50 | | | GAS 1ST REVIEW**DENIED**19120807 | | | | | | 1)ON SHT. P1 YOU SO A NEW GAS METER BUT ALSO A GAS LINE | | TO CONNECT INTO THE BUILDINGS EXISTING. PLEASE CLARIFY. | | FBC 107.2.1. THE PLANS INDICATE AN EXISTING GAS METER. | | THE BTU LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED | | INTO THE TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE | | EXISTING SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE | | EXISTING SYSTEM MUST BE REDONE TO ENSURE A SAFE | | OPERATING SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM | | THAT SHOWS THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD | | OF EACH APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO | | EACH APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH | | OF PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE | | OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE | | EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE | | SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE | | REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES. | | FGC SECS. 401.4, 401.8, 402.1, 402.2, 402.3 | | | | | | 2)SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE | | LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC-FUEL | | GAS, SECS. 402.4.1, 402.4.2 SHOW THE TYPE OF PIPE | | MATERIAL BEING INSTALLED, ALL PIPE SIZES, AND THE | | CORRESPONDING EHD NUMBER OF THE | | | | | | | | | | | | 3)SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE, | | TERMINATION POINT, HEIGHT ABOVE THE ROOF AND ANCHORING | | DETAILS OF THE GAS VENT(S) PER 2017 FBC-FUEL GAS SECS. | | 502 THRU 505 | | | | | | | | | | | | 4) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / | | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY | | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND | | FBC-2017 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2017 | | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED | | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS | | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIMES | | | | | | | | | | | | 5)SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES | | USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE | | PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM | | THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE | | DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL | | GAS SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1) | | THRU 402.4 (37)E OF INSPECTION. FGC SEC.305.1 | | | | | | | | | | | | 6) SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS. | | A LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY | | AHEAD OF EACH MP REGULATOR. 2017 FBC-FUEL GAS | | SEC.409.4, FBC-RESIDENTIAL SEC. G 2420.4. | | | | | | 7) SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE | | PRESSURE REGULATORS. REGULATORS INSTALLED ON THE | | EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR | | INSTALLATION. 2017 FGC SEC.410.1 | | | | | | 8) SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE | | APPLIANCE. COMPLY WITH 2017 FBC-FUEL GAS SEC. 402.4.1 | | | | | | | | | | | | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS | | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE | | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. | | | | | | | | | | | | TIM HUNT | | | | | | PLUMBING PLAN REVIEW | | | | | | CITY OF WEST PALM BEACH (CGA SOLUTIONS) | | | | | | 561-248-2703 | | | | | | [email protected] | | | | | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2020-07-17 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2020-07-17 |
Time |
16:27 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2020-07-07 |
Time |
15:32 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2020-06-30 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-06-30 |
Time |
14:33 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-06-15 |
Time |
13:45 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2020-05-01 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2020-05-01 |
Time |
08:48 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2020-04-17 |
Time |
10:45 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2020-02-26 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-02-26 |
Time |
16:49 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-02-04 |
Time |
08:05 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2020-06-23 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-06-23 |
Time |
10:21 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-06-19 |
Time |
16:46 |
Sent To |
|
|
Notes |
2020-06-23 10:26:21 | HOLDS ON CO PLACED FOR UL FIELD EVALUATION REPORT, AND | | ACCEPTANCE TESTING REPORT PER NFPA 110. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2020-04-30 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-04-30 |
Time |
13:47 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-04-30 |
Time |
13:47 |
Sent To |
|
|
Notes |
2020-04-30 13:47:55 | 1ST REVIEW FBC-2017 MECHANICAL | | PERMIT #19120807 | | 4/20/2020 | | | | CODES IN EFFECT: | | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | 2017 | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION | | 2017 | | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | EDITION 2017 | | | | PLAN REVIEW RESULTS: DENIED. | | | | 1) DESIGN CRITERIA: PROVIDE A LIST OF CODES AND | | STANDARDS USED IN THE DESIGN OF THE EPSS (EMERGENCY | | POWER SUPPLY SYSTEM)- SECTION 107.2.1 WPB. | | | | 2) PLEASE INDICATE HOW COMPLIANCE IS BEING MET WITH | | RULE 58A-5.036, F.A.C., EMERGENCY ENVIRONMENTAL CONTROL | | FOR ASSISTED LIVING FACILITIES. PROVIDE A LIST OF HVAC | | SYSTEMS TO BE SUPPPORTED BY THE EPSS. | | | | 3) REFER TO SECTION 4.1 NFPA 110 AND INDICATE THE LEVEL | | OF THE EPSS- 1 OR 2, AND SHOW COMPLIANCE WITH 4.4 ITEMS | | 1, 2, & 3. | | | | 4) REFER TO PAGE 6 OF THE SHOP DRAWINGS FOR THE | | GENERATOR ENCLOSURE WO#46720- 11/27/2019. IT APPEARS | | THE LOUVER/DAMPER LIST OF PRODUCTS AT THE BOTTOM LEFT | | OF THE PAGE IS CUT OFF. VERIFY THAT ALL AIR INTAKE AND | | EXHAUST LOUVERS ARE AMCA 550 RATED IN ACCORDANCE WITH | | SECTION 401.5 AND 501.3.2 FBC M. | | | | 5) MOTORIZED DAMPERS ARE INDICATED IN THE SPECIAL | | INSTRUCTIONS LIST. PLEASE PROVIDE THE SEQUENCE OF | | OPERATION FOR THE EXHAUST VENTILATION SYSTEM- SECTION | | 510.3 AND 510.6.5 FBC M. VERIFY THE DAMPERS ARE IN | | COMPLIANCE WITH SECTION 7.7.5 NFPA 110. | | | | 6) REFER TO SECTION 7.7.4.1 NFPA 110 AND PROVIDE THE | | STATIC RESTRICTION AT THE RADIATOR DISCHARGE | | OUTLET.VERIFY THE LOUVERS WILL NOT RESTRICT AIRFLOW. | | | | 7) PROVIDE ENGINE EXHAUST PIPING SPECIFICATIONS AND | | BACKPRESSURE CALCULATIONS- SECTION 7.10.1 NFPA 110 AND | | SECTION 107.2.1 WPB. | | | | 8) PROVIDE THE UL CERTIFICATES FOR THE GENERATOR AND | | THE FUEL TANK- SECTIONS 304.1 AND 915.1 FBC M. | | | | 9) REFER TO SECTIONS 7.13.1 THROUGH 17.13.4.1.6 NFPA | | 110 AND PROVIDE AN ACCEPTANCE TESTING PROCEDURE | | OUTLINE. PLEASE NOTE ITEMS #1-4 SECTION 7.13.4.6 SHALL | | BE MADE AVAILABLE TO THE WPB BUILDING DEPARTMENT FOR | | FINAL APPROVAL. | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | | | CHRISTOPHER L. COLE | | MECHANICAL/PLUMBING PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
N |
Date |
2020-06-24 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-06-22 |
Time |
16:44 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-06-19 |
Time |
16:27 |
Sent To |
|
|
Notes |
2020-06-22 16:50:34 | PER THE EOR, CONDENSATION FROM EXHAUST SYSTEMS IS A | | SELF-CONTAINED SEALED SYSTEM THAT IS OPENED ONLY FOR | | INSPECTION AND REPAIRS, AND THEN DRAINED BY HAND IS | | NECESSARY. | | MECHNAICAL INSPECTOR WILL VERIFY IN FIELD. | | CCOLE- 6/24/2020 | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
F |
Date |
2020-04-30 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-04-30 |
Time |
12:03 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-04-30 |
Time |
12:03 |
Sent To |
|
|
Notes |
2020-04-30 12:08:54 | 1ST REVIEW FBC-2017 PLUMBING | | PERMIT #19120807 | | 4/30/2020 | | | | CODES IN EFFECT: | | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | 2017 | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION | | 2017 | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | EDITION 2017 | | | | PLAN REVIEW RESULTS: DENIED. | | | | 1) REFER TO SECTION 7.10.3.1 NFPA 110 AND VERIFY THE | | GENERATOR EXHAUST PIPES ARE SELF-DRAINING, OR PROVIDE A | | CONDENSATE TRAP AND DRAIN VALVE. | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD | | SHEETS FROM THE PLAN SETS, | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2020-02-21 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2020-02-21 |
Time |
09:11 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2020-02-17 |
Time |
17:16 |
Sent To |
|
|
Notes |
2020-02-21 09:12:15 | SEE GAS REVIEW | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
P |
Date |
2020-06-24 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-06-24 |
Time |
09:18 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-06-24 |
Time |
09:18 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2020-04-24 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-04-24 |
Time |
16:36 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-04-24 |
Time |
16:36 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2020-02-18 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-02-18 |
Time |
12:50 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-02-18 |
Time |
12:50 |
Sent To |
|
|
Notes |
2020-02-18 12:51:47 | ALL DRAWINGS OK - - ADDED DRAWINGS WILL NEED TO BE | | VERIFIED. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
4 |
Status |
P |
Date |
2020-07-17 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2020-07-17 |
Time |
16:22 |
Rev Time |
0.25 |
Received By |
eschneid |
Date |
2020-07-17 |
Time |
15:59 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
F |
Date |
2020-06-25 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2020-06-25 |
Time |
13:24 |
Rev Time |
0.25 |
Received By |
eschneid |
Date |
2020-06-25 |
Time |
11:16 |
Sent To |
|
|
Notes |
2020-06-25 13:20:06 | FAILED | | | | 1) REPEAT COMMENT: THE PROPOSED DUCK BANK, WHERE IT | | MEETS THE NORTH SIDE OF THE COOLING TOWER ENCLOSURE, | | APPEARS TO DIRECTLY CONFLICT WITH AN EXISTING SABAL | | PALM TREE. PLEASE REVIEW THE PLACEMENT OF THE DUCT BANK | | TO AVOID THE TREE AND PROVIDE DRAWINGS TO VERIFY THAT | | IT DOES NOT INTERFERE WITH THE EXISTING TREE. ---- NO | | RESPONSE PROVIDED OR CHANGES MADE. | | | | 2) REPEAT COMMENT: ZONING WILL NOT APPROVE THIS PERMIT | | UNTIL A TREE ALTERATION PERMIT HAS BEEN SUBMITTED TO | | THE PLANNING DIVISION AND APPROVED BY THE CITY'S | | LANDSCAPE PLANNER. THIS IS REQUIRED SINCE THE PLANS | | CALL FOR TREES TO BE REMOVED AT THE GENERATOR LOCATION. | | NOTE: THE LATEST PROPOSAL IS TO DESTROY THE TREES. | | PLANNING STAFF IS NOT APPROVING THIS OPTION. THE TREES | | WILL NEED TO BE RELOCATED OR THE GENERATOR INSTALLED IN | | A LOCATION THAT DOES NOT IMPACT THE TREES. | | | | 3) THE FENCE RELOCATION IS APPROVED AS PART OF THIS | | PERMIT AND DOES NOT REQUIRE A SEPARATE FENCE PERMIT. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | [email protected] | | | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
F |
Date |
2020-04-30 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2020-04-30 |
Time |
16:05 |
Rev Time |
0.50 |
Received By |
eschneid |
Date |
2020-04-30 |
Time |
15:46 |
Sent To |
|
|
Notes |
2020-04-30 16:50:49 | FAILED | | | | 1) THE CIVIL PLAN NEEDS TO SHOW THE FULL EXTENT OF THE | | GENERATOR PAD, INCLUDING DIMENSIONS, IN ITS CORRECT | | LOCATION. | | | | 2) THE PROPOSED DUCK BANK, WHERE IT MEETS THE NORTH | | SIDE OF THE COOLING TOWER ENCLOSURE, APPEARS TO | | DIRECTLY CONFLICT WITH AN EXISTING SABAL PALM TREE. | | PLEASE REVIEW THE PLACEMENT OF THE DUCT BANK TO AVOID | | THE TREE AND PROVIDE DRAWINGS TO VERIFY THAT IT DOES | | NOT INTERFERE WITH THE EXISTING TREE. | | | | 3) ZONING WILL NOT APPROVE THIS PERMIT UNTIL A TREE | | ALTERATION PERMIT HAS BEEN SUBMITTED TO THE PLANNING | | DIVISION AND APPROVED BY THE CITY'S LANDSCAPE PLANNER. | | THIS IS REQUIRED SINCE THE PLANS CALL FOR TREES TO BE | | REMOVED AT THE GENERATOR LOCATION. | | | | 4) THE FENCE RELOCATION IS APPROVED AS PART OF THIS | | PERMIT AND DOES NOT REQUIRE A SEPARATE FENCE PERMIT. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | [email protected] |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2020-02-14 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2020-02-14 |
Time |
14:09 |
Rev Time |
0.25 |
Received By |
eschneid |
Date |
2020-02-14 |
Time |
14:09 |
Sent To |
|
|
Notes |
2020-02-14 14:10:25 | FAILED | | | | THE GENERATOR LOCATION DOES NOT HAVE SITE PLAN | | APPROVAL. ZONING WILL NOT REVIEW THE PERMIT UNTIL THE | | SITE PLAN APPROVAL HAS BEEN GRANTED. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | [email protected] |
|
|