|
 |
 |
 |
 |
 |
Plan Review Details - Permit 19120616
Plan Review Stops For Permit 19120616 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2019-12-24 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2019-12-24 |
Time |
13:25 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2019-12-24 |
Time |
13:25 |
Sent To |
|
|
Notes |
2019-12-24 13:33:23 | ***CORRECTIONS*** | | PETER E VALENTI | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6673 | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | FBC R = FBC RESIDENTIAL | | FBC M = FBC MECHANICAL | | | | BUILDING APPROVED WITH PROVISO: | | | | WHEN SUBMITTING THE FINISHED CONSTRUCTION: | | 1. IN SECTION A-3 OF ELEVATION CERTIFICATE INCLUDE THE | | ADDRESS. | | 2. IN SECTION B-5 OF ELEVATION CERTIFICATE CORRECT THE | | SUFFIX. IT APPEARS THAT THE SUFFIX SHOULD BE "F". |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2019-12-18 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2019-12-18 |
Time |
10:09 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2019-12-18 |
Time |
10:09 |
Sent To |
|
|
Notes |
2019-12-18 10:29:55 | *** CORRECTIONS *** | | PETER E VALENTI | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6673 | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | FBC R = FBC RESIDENTIAL | | FBC M = FBC MECHANICAL | | | | BUILDING REVIEW DENIED: | | | | THE FOLLOWING SECTIONS OF THE SUBMITTED, BUILDING UNDER | | CONSTRUCTION, ELEVATION CERTIFICATE NEED CORRECTIONS: | | | | A3, THE PROPERTY DESCRIPTION NEEDS TO INCLUDE THE | | ADDRESS EVEN THOUGH THIS INFORMATION WAS PROVIDED IN | | SECTION A2. | | B5, THE LETTER "H" WAS ENTERED IN THE SUFFIX | | SECTION.THE SUFFIX SHOULD BE "F". | | | | | | | | NOTE: WHEN SUBMITTING THE FINISHED CONSTRUCTION | | ELEVATION CERTIFICATE, THE FLOOD VENT INFORMATION WILL | | NEED TO BE ENTERED IN SECTION A9. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2019-12-18 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2019-12-18 |
Time |
10:09 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2019-12-16 |
Time |
15:20 |
Sent To |
|
|
Notes |
2019-12-17 15:20:53 | REVISION ROUTED TO PVALENTI |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |