Plan Review Details - Permit 19111275
Plan Review Stops For Permit 19111275
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2019-12-02 Cont ID  
Sent By dbattles Date 2019-12-02 Time 07:40 Rev Time 0.00
Received By dbattles Date 2019-12-02 Time 07:40 Sent To  
Notes
***NONE***

Review Stop AIPP ART IN PUBLIC PLACES
Rev No 1 Status P Date 2021-01-21 Cont ID  
Sent By shill Date 2021-01-21 Time 17:25 Rev Time 0.00
Received By shill Date 2021-01-21 Time 17:25 Sent To  
Notes
2021-01-21 17:25:58OK PER EMAIL FROM S.WELTER DATED 1/21/21
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-12-02 Cont ID  
Sent By dbattles Date 2019-12-02 Time 07:40 Rev Time 0.00
Received By dbattles Date 2019-12-02 Time 07:40 Sent To  
Notes
2020-05-15 14:53:45PROVISOS:
 PROVIDE ELEVATION CERTIFICATE WHILE UNDER CONSTRUCTION.
 PROVIDE FORMBOARD SURVEY TO INSPECTOR PRIOR TO POURING
 FOUNDATION.
2019-12-02 07:44:07PROVISOS:
 1) SEE DEFERRED SUBMITTALS LIST ON SHEET LS-0
 2) AIPP COMPLIANCE REQUIRED; VERIFICATION REQUIRED
 PRIOR TO C.O.
 CONTACT WITHIN 90 DAYS OF PERMIT ISSUANCE.
 3) SHORING/RESHORE ENGINEERING IS REQUIRED TO BE
 SUBMITTED TO THE BUILDING DIVISION FOR REVIEW. THE
 ENGINEERING IS TO BE SUBMITTED, REVIEWED AND ISSUED
 PRIOR TO CONCRETE POUR.
 4) SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) ARE
 REQUIRED FOR:
 LIGHT POLES/SITE LIGHTING
 FIRE ALARM
 FIRE SPRINKLER
 LOW VOLTAGE
 ACCESS
 LANDSCAPING
 IRRIGATION
 PARKING LOT
 ALL OTHER ITEMS OTHER THAN BMEP
 5) CONSTRUCTION HOURS - 7AM TO 7PM MON-FRI, 8AM TO 8PM
 SAT-SUN
 6) FLOORING SUBMITTAL WITH SOUND IIC, STC AND FIRE
 RATINGS.
 7) SUBMITTAL FOR VEHICLE BARRIER SYSTEM
 8) SUBMITTAL FOR HAND RAILS AND GUARD RAILS
 9) ROOFING PRODUCT APPROVALS AND ENGINEERING AT TIME OF
 SUB-PERMIT APPLICATION.
 10) ROOF TRUSS SHOP DRAWINGS TO INSPECTOR PRIOR TO
 INSTALL.
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-12-03 Cont ID  
Sent By jleahy Date 2019-12-03 Time 10:21 Rev Time 0.00
Received By jleahy Date 2019-12-02 Time 08:43 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2019-12-02 Cont ID  
Sent By rrossano Date 2019-12-02 Time   Rev Time  
Received By rrossano Date 2019-12-02 Time   Sent To  
Notes
2019-12-02 07:50:38PLANS REVIEWED UNDER FORMAL ENGINEERING SUBMITTAL
 E19060017.

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2019-12-03 Cont ID  
Sent By pleduc Date 2019-12-03 Time   Rev Time 0.00
Received By pleduc Date 2019-12-03 Time 09:40 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2019-12-03 Time   Rev Time 0.00
Received By lmarchan Date 2019-11-26 Time 10:04 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status P Date 2019-12-04 Cont ID  
Sent By lmarchan Date 2019-12-04 Time 11:24 Rev Time 0.00
Received By lmarchan Date 2019-11-26 Time 10:04 Sent To  
Notes
2019-12-03 15:02:50RECEIPT 2019-1204-156 - $1,006,824.56 - PAID
2019-11-26 10:04:3411/26/19 SENT TO IMPACT FEE OFFICE FOR REVIEW. LEM

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2019-12-03 Cont ID  
Sent By ccole Date 2019-12-03 Time 11:14 Rev Time 0.00
Received By ccole Date 2019-12-03 Time 11:03 Sent To  
Notes
***NONE***

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 1 Status P Date 2020-05-15 Cont ID  
Sent By dbattles Date 2020-05-15 Time 14:45 Rev Time 0.00
Received By dbattles Date 2020-05-15 Time 14:45 Sent To  
Notes
2020-05-15 14:43:19107.3.5.3.1 FBC [AMENDED]PROVIDE BASE FLOOD
 ELEVATION(B.F.E.) CERTIFICATE WITH DESIGN FLOOD
 ELEVATIONS TO INCLUDE ANY MECHANICAL EQUIPMENT AS
 APPLICABLE. ALL ELEVATION CERTIFICATES CERTIFIED
 OCTOBER 5, 2017 AND LATER ARE TO UTILIZE NAVD88 AND
 INCLUDE A CONVERSION TO NGVD29.
  
 DYLAN BATTLES
 561-805-6718
 [email protected]
  
 THE CITY OF WEST PALM BEACH
 BUILDING PLANS EXAMINER PX4191

Review Stop P PLUMBING
Rev No 1 Status P Date 2019-12-03 Cont ID  
Sent By gjohnson Date 2019-12-03 Time 09:59 Rev Time 0.00
Received By gjohnson Date 2019-12-03 Time 09:59 Sent To  
Notes
***NONE***

Review Stop P-GREASE GREASE INTERCEPTOR/TRAP REVIEW
Rev No 1 Status P Date 2019-12-23 Cont ID  
Sent By gjohnson Date 2019-12-23 Time 09:05 Rev Time 0.00
Received By gjohnson Date 2019-12-23 Time 09:05 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status N Date 2019-12-02 Cont ID  
Sent By dbattles Date 2019-12-02 Time 07:41 Rev Time 0.00
Received By dbattles Date 2019-12-02 Time 07:41 Sent To  
Notes
2019-12-02 07:42:52PROVIDE PRODUCT APPROVALS WITH SUB PERMIT APPLICATION.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2019-12-02 Cont ID  
Sent By dbattles Date 2019-12-02 Time 07:41 Rev Time 0.00
Received By dbattles Date 2019-12-02 Time 07:41 Sent To  
Notes
***NONE***

Review Stop THRESHOLD THRESHOLD INSPECTOR DOCUMENTS
Rev No 1 Status P Date 2019-12-02 Cont ID  
Sent By dbattles Date 2019-12-02 Time 07:40 Rev Time 0.00
Received By dbattles Date 2019-12-02 Time 07:40 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2019-12-03 Cont ID  
Sent By hmtribou Date 2019-12-03 Time 09:10 Rev Time 0.00
Received By hmtribou Date 2019-12-03 Time 09:10 Sent To I
Notes
2019-12-03 09:10:48RESO. 86-19
 PROJECT NAME: THE DISTRICT FLATS
  
 ZONING CONTACT: HEATHER M. DANFORTH
  (561) 822-1562
  [email protected]
  
  
  
 GENERAL COMMENTS
  
 --SEPARATE PERMITS ARE REQUIRED FOR FENCE/SITE
 WALLS/NETTING; DUMPSTER ENCLOSURES; SIGNAGE; LANDSCAPE;
 PARKING; BIKE RACKS/ HARDSCAPE; ARTIFICIAL TURF, ART
 WALL IN ART PARK AND SITE LIGHTING.
  
 -- PRIOR TO THE FIRST BUILDING INSPECTION PROVIDE
 NOTICE FOR CRANES AND FACILITY, AND IF APPLICABLE,
 DETERMINATION BY FEDERAL AVIATION ADMINISTRATION
 OBSTRUCTION EVALUATION/ AIRPORT AIRSPACE ANALYSIS
  
 -- REQUEST FOR AMENDMENT RECEIVED: PRIOR TO ISSUANCE OF
 TEMPORARY CERTIFICATE OF OCCUPANCY OR CERTIFICATE OF
 OCCUPANCY, WHICHEVER IS FIRST; ALL RESIDENTIAL MUST
 HAVE WINDOWS SHALL MEET A SOUND TRANSITION
 CLASSIFICATION OF 45 OR GREATER BY BEING FIELD TESTED
 AND CERTIFIED.
  
 -- PRIOR TO ISSUANCE OF TEMPORARY CERTIFICATE OF
 OCCUPANCY OR CERTIFICATE OF OCCUPANCY, WHICHEVER IS
 FIRST; PROPOSED DOCUMENT TO NOTIFY LESSEES OF
 SURROUNDING FUNCTIONING INDUSTRIAL AREA WITH AND
 AFFIDAVIT FOR LESSEES TO SIGN OF ACKNOWLEDGEMENT OF
 POTENTIAL ODOR, NOISE, VIBRATIONS AND GLARE SHALL BE
 PROVIDED TO CITY?S PLANNING DIVISION AND APPROVED FOR
 COMPLIANCE.
  
 -- PRIOR TO THE ISSUANCE OF CERTIFICATE OF OCCUPANCY
 PHASE 1 (POD A) SHALL BE REPLATTED AND ALL EASEMENTS
 SHALL BE RECORDED.
  
 --PRIOR TO CERTIFICATE OF OCCUPANCY, COMMITMENT FOR
 WORKFORCE HOUSING SHALL BE RECORDED AS DEED RESTRICTION
 OR OTHER ACCEPTABLE AGREEMENT.
  
 --PRIOR TO CERTIFICATE OF OCCUPANCY, ALL APPROVED
 RIGHT-OF-WAY IMPROVEMENTS MUST BE COMPLETE--PROVIDE
 LOCATION FOR TRANSIT INFORMATION, MAPS, SCHEDULES/
 TIMETABLES, BROCHURES, FOR TRANSIT SERVICE TO REDUCE
 PARKING SPACE NEEDS.
  
 -- PRIOR TO CERTIFICATE OF OCCUPANCY, A MAINTENANCE
 AGREEMENT FOR ALL RIGHT-OF-WAY IMPROVEMENTS MUST BE
 APPROVED BY COMMISSION AND RECORDED.
  
 -- PRIOR TO CERTIFICATE OF OCCUPANCY, A MINOR SITE PLAN
 AMENDMENT MUST BE APPROVED TO CAPTURE SQUARE FOOTAGE
 AND SITE PLAN CHANGES INCLUDING SIDEWALKS AND BUFFERS.
  
 -- THIS PROJECT REQUIRES FOR THE PUBLIC ART ASSESSMENT
 (SEC. 98-129 OF CHAPTER 28 OF THE CITY OF WEST PALM
 BEACH CODE OF ORDINANCES). PLEASE CONTACT SYBILLE
 WALTER AT 561-822-1521.
  
 --PRIOR TO THE CERTIFICATE OF OCCUPANCY, ?ART
 SCULPTURE? SHALL BE APPROVED BY ART IN PUBLIC PLACES
 AND INSTALLED.
  
 --PRIOR TO THE CERTIFICATE OF OCCUPANCY, ?ART WALL?
 SHALL BE APPROVED AND INSTALLED.
  
 -- PRIOR TO CERTIFICATE OF OCCUPANCY, ALL BUILDING
 PAINTINGS SHALL BE APPROVED AND INSTALLED. PLEASE NOTE
 ALL PAINTINGS ARE PART OF THE COMMERCIAL PLANNED
 DEVELOPMENT APPROVAL AND SHALL NOT BE COUNTED TOWARD
 THE ART IN PUBLIC PLACES REQUIREMENT.
  