Plan Review Details - Permit 19110991
Plan Review Stops For Permit 19110991
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-12-11 Cont ID  
Sent By dbattles Date 2019-12-11 Time 13:20 Rev Time 0.00
Received By dbattles Date 2019-12-11 Time 10:41 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-12-10 Cont ID  
Sent By jpearson Date 2019-12-10 Time 11:07 Rev Time 0.00
Received By jpearson Date 2019-12-10 Time 11:07 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2019-11-26 Cont ID  
Sent By lcrespo Date 2019-11-26 Time 07:29 Rev Time 0.00
Received By lcrespo Date 2019-11-26 Time 07:29 Sent To  
Notes
2019-11-26 07:29:28GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN
 THIS SUBMITTAL PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN
 PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND PLANS
 WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE
 RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT
 REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER
 THE WPB AMENDMENTS TO FBC SEC. 107.2.1.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-12-13 Cont ID  
Sent By cmontell Date 2019-12-13 Time 12:05 Rev Time 0.00
Received By cmontell Date 2019-12-13 Time 12:05 Sent To  
Notes
2019-12-13 08:21:03TO CM DESK
  
2019-11-21 11:26:45R38

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2019-12-13 Cont ID  
Sent By cmontell Date 2019-12-13 Time 12:05 Rev Time 0.00
Received By cmontell Date 2019-12-13 Time 12:05 Sent To I
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2019-11-26 Cont ID  
Sent By lcrespo Date 2019-11-26 Time 07:28 Rev Time 0.00
Received By lcrespo Date 2019-11-26 Time 07:00 Sent To  
Notes
2019-11-26 07:30:2311/26/19 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 6:30 AM 7:30 / 2:00 PM TO 5:00 PM
 [email protected]
 561-701-6437
  