Review Stop AIPP ART IN PUBLIC PLACES
Rev No 1 Status N Date 2020-12-09 Cont ID  
Sent By shill Date 2020-12-09 Time 10:24 Rev Time 0.00
Received By shill Date 2020-12-09 Time 10:24 Sent To  
Notes
2020-12-09 10:24:54EXEMPT PER EMAIL FROM SYBILLE WELTER DATED 12/8/20
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-12-12 Cont ID  
Sent By dbattles Date 2019-12-12 Time 15:31 Rev Time 0.00
Received By dbattles Date 2019-12-10 Time 12:49 Sent To  
Notes
2019-12-12 15:33:58REVIEW AND COMMENTS WERE DONE UNDER PERMIT # 18120436
2019-12-12 15:31:56PROVISOS:
 1) AIPP COMPLIANCE REQUIRED; VERIFICATION REQUIRED
 PRIOR TO C.O.
 CONTACT WITHIN 90 DAYS OF PERMIT ISSUANCE.
  
 2) ENGINEERED FLOOD PROVING DESIGN FOR BUILDING A
 ADDITION ONLY.
  
 3) CONSTRUCTION HOURS - 7AM TO 7PM MON-FRI, 8AM TO 8PM
 SAT-SUN
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-12-04 Cont ID  
Sent By jpearson Date 2019-12-04 Time 10:47 Rev Time 0.00
Received By jpearson Date 2019-12-04 Time 10:47 Sent To  
Notes
2019-12-04 10:47:20REVIEWS COMPLETED UNDER APPLICATION 18120436

Review Stop ENG ENGINEERING CSD
Rev No 1 Status N Date 2019-12-03 Cont ID  
Sent By rrossano Date 2019-12-03 Time   Rev Time  
Received By   Date 2019-12-03 Time   Sent To I
Notes
2019-12-03 15:33:42SUBMITTAL WAS REVIEWED UNDER FORMAL ENGINEERING
 SUBMITTAL E18110019.

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2019-12-12 Cont ID  
Sent By pleduc Date 2019-12-12 Time   Rev Time 0.00
Received By pleduc Date 2019-12-12 Time 10:31 Sent To  
Notes
2019-12-12 10:33:06?REVIEWS COMPLETED UNDER APPLICATION 18120436.?
  
  
 THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
  
  
  
 1) SHEET FP 001 - THERE ARE INDICATIONS OF FIRE
 SPRINKLER WORK. THERE ARE NO INDICATIONS THAT THE WORK
 SHALL BE DONE UNDER SEPARATE PERMIT AND SHOP DRAWINGS
 BY CERTIFIED FIRE SPRINKLER CONTRACTORS.
  
 ALL FIRE SPRINKLER WORK SHALL BE DONE UNDER SEPARATE
 PERMIT AND SHOP DRAWINGS.
  
  
  
 2) SHEET FP 101 A - THERE ARE INDICATIONS OF FIRE
 SPRINKLER WORK IN THE SOUTH, ADULT SECTION. THERE ARE
 NO INDICATIONS OF WORK IN THE NORTH, CHILD SECTION.
  
 ALL FIRE SPRINKLER WORK SHALL BE DONE UNDER SEPARATE
 PERMIT AND SHOP DRAWINGS.
  
  
  
 3) SHEET E 001 - THERE ARE NO INDICATIONS OF FIRE ALARM
 DEVICES, EQUIPMENT, OR WORK OF THE FIRE ALARM SYSTEM.
  
 ANY WORK ON THE FIRE ALARM, DEMO AND/OR NEW
 INSTALLTIONS SHALL BE DONE UNDER SEPARATE PERMIT AND
 SHOP DRAWING BY CERTIFIED FIRE ALARM CONTRACTORS.
  
  
 4) SHEET A 575 - THERE ARE INDICATIONS OF CARD READERS
 AND CONTROLLED EGRESS WITHIN THE DOOR SCHEDULE.
  
 ALL INSTALL INVOLVING EGRESS SHALL COMPLY WITH NFPA
 101, CHAPTER 7, MEANS OF EGRESS AS APPLICABLE.
  
 ANY WORK OF CARD READERS AND/OR CONTROLLED EGRESS SHALL
 BE DONE UNDER PERMIT AND SEPARATE SHOP DRAWINGS.
  
  
  
 5) SHEET G 100 - THERE ARE NO INDICATIONS UNDER DEMO
 AND/OR OTHER APPLICABLE AREAS REGARDING THE LIFE SAFETY
 SYSTEM BEING MAINTAINED.
  
 COMPLIED - NOTE ADDED
  
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-01-08 Cont ID  
Sent By skennedy Date 2020-01-08 Time 15:18 Rev Time 0.00
Received By skennedy Date 2020-01-08 Time 15:18 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status P Date 2020-01-08 Cont ID  
Sent By lmarchan Date 2020-01-08 Time 15:26 Rev Time 0.00
Received By lmarchan Date 2019-12-02 Time 10:42 Sent To  
Notes
2020-01-08 15:27:00RECEIPT 2020-0102-209 - $49,186.44 - PAID
  
2019-12-02 10:45:3012/2/19 SENT TO IMPACT FEE OFFICE FOR REVIEW. LEM

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2020-01-08 Cont ID  
Sent By skennedy Date 2020-01-08 Time 15:17 Rev Time 0.00
Received By skennedy Date 2020-01-08 Time 15:17 Sent To  
Notes
2020-01-08 15:17:53SEE 18120463

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 1 Status N Date 2019-12-16 Cont ID  
Sent By dbattles Date 2019-12-12 Time 15:32 Rev Time 0.00
Received By dbattles Date 2019-12-12 Time 15:32 Sent To  
Notes
2021-12-06 11:19:14THIS PROJECT HAS BEEN DETERMINED TO NOT REQUIRE
 SUBSTANTIAL IMPROVEMENT.
 FLOOD PROOFING AND FLOOD GATE WERE DONE TO REQUIREMENTS
 AS IF THEY WERE SUBSTANTIALLY IMPROVING.
  
 $16,424,316.00 MARKET VALUE STRUCTURE ONLY
 $2,400,000.00 COST OF IMPROVMENT
  
 RATIO=15%
  
  
2019-12-12 15:37:28OK - PRE-CONSTRUCTION ELEVATION CERTIFICATE ADDED TP
 PROJECTDOX SUPPORTING DOCUMENTS.
  
  
 THE BASE FLOOD ELEVATION(BFE) WILL BE 12' NAVD.
 DESIGN FLOOD ELEVATION WILL BE 14' NAVD SINCE WE HAVE A
 2' FREEBOARD.
  
 PROVISO:
 1) PROVIDE ENGINEERED FLOODPROOFING AS SUBMITTAL TO
 PERMIT 19110637
 THE FLOOD PROOFING WILL ONLY NEED TO EXTEND TO 14'
 NAVD.
 2) ENGINEER TO PROVIDE FLOODPROOFING CERTIFICATE FOR
 THE DEISGN PROVIDED.
 3) PROVIDE FINAL ELAVATION CERTIFICATE UPON COMPLETION
 OF CONSTRUCTION.
  

Review Stop P PLUMBING
Rev No 1 Status P Date 2020-01-08 Cont ID  
Sent By skennedy Date 2020-01-08 Time 15:18 Rev Time 0.00
Received By skennedy Date 2020-01-08 Time 15:18 Sent To  
Notes
2020-01-08 15:18:14SEE 18120463

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status N Date 2019-12-12 Cont ID  
Sent By dbattles Date 2019-12-12 Time 15:47 Rev Time 0.00
Received By dbattles Date 2019-12-12 Time 15:40 Sent To  
Notes
2019-12-12 15:47:49PROVIDE PRODUCT APPROVALS WITH ROOFING SUB PERMIT
 APPLICATION.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2019-12-12 Cont ID  
Sent By dbattles Date 2019-12-12 Time 15:34 Rev Time 0.00
Received By dbattles Date 2019-12-12 Time 15:34 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2020-01-08 Cont ID  
Sent By eschneid Date 2020-01-08 Time 14:35 Rev Time 0.00
Received By eschneid Date 2020-01-08 Time 13:35 Sent To  
Notes
2020-01-08 14:35:43PASSED W/PROVISOS
  
 1) PRIOR TO COMMENCEMENT OF THE DEMOLITION SHOWN ON
 SHEET C100, SUBMIT A REVISED SHEET SHOWING THE
 DEMOLITION TO ACCOMMODATE THE PLANS APPROVED AS PART OF
 RESOLUTION NO. 297-19.
  
 2) SHEETS C400, C401 AND C402 ARE NOT APPROVED AS THEY
 ARE NOT THE VERSION APPROVED BY RESOLUTION NO. 297-19.
 CORRECT PLANS NEED TO BE SUBMITTED WITH THE ENGINEERING
 PERMIT.
  
 3) SEPARATE PERMITS WITH PLANS REQUIRED FOR:
  
 A. BICYCLE RACK
 B. PARKING LOT STRIPING
 C. CONSTRUCTION SITE SIGN
 D. NEW FUEL OIL TANK SCREEN WALL
 E. LANDSCAPE
 F. SITE LIGHTING
 G. IRRIGATION
  
 4) PLEASE REMEMBER IN ACCORDANCE WITH RESOLUTION NO.
 297-19:
  
 THE OVERALL JFK NORTH SITE LANDSCAPE MUST BE INSTALLED
 PRIOR TO WHICHEVER OF THE FOLLOWING EVENTS FIRST OCCUR:
  
 A. OCTOBER 31, 2020.
 B. THE FINAL (104) INSPECTION FOR THE BEHAVIORAL HEALTH
 FACILITY ADDITIONS.
 C. SIX (6) MONTHS FOLLOWING THE CITY APPROVAL OF A
 SUBDIVISION OR PLAT OF THE JFK MEDICAL CENTER NORTH
 CAMPUS CSPD.
  
 CONTACT ERIC SCHNEIDER @ (561) 312-8219
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved