Plan Review Details - Permit 19110246
Plan Review Stops For Permit 19110246
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-11-15 Cont ID  
Sent By jwitmer Date 2019-11-15 Time 11:20 Rev Time 0.00
Received By jwitmer Date 2019-11-15 Time 10:14 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-11-08 Cont ID  
Sent By fgiaquin Date 2019-11-08 Time 20:39 Rev Time 0.00
Received By fgiaquin Date 2019-11-08 Time 06:18 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2019-11-18 Cont ID  
Sent By pleduc Date 2019-11-18 Time   Rev Time 0.00
Received By pleduc Date 2019-11-18 Time 10:36 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-11-21 Cont ID  
Sent By shill Date 2019-11-21 Time 15:34 Rev Time 0.00
Received By shill Date 2019-11-20 Time 16:12 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-11-20 Cont ID  
Sent By cpuell Date 2019-11-20 Time 12:00 Rev Time 0.00
Received By cpuell Date 2019-11-05 Time 14:10 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2019-11-18 Cont ID  
Sent By gjohnson Date 2019-11-18 Time 12:29 Rev Time 0.00
Received By gjohnson Date 2019-11-15 Time 17:58 Sent To  
Notes
2019-11-18 12:30:26PLUMBING NOTES: PROVISO
 COMPLY PROIR TO FINAL INSPECTION.
  
 1. ALL WORK PER CITY CODES SUBJECT TO FIELD INSPECTOR,S
 APPROVAL.
  
 2. ALL PLUMBING WORK SHALL COMPLY WITH FBC PLUMBING 6TH
 EDITION 2017
  
 3. A BACK FLOW DEVISE IS REQUIRED ON THE WATER SERVISE
 FOR THE TRAILER. PER FBC PL 608.3 DUE TO THE HOLDING
 TANK
 SEPARATE PERMIT IS REQUIRED FOR BACKFLOW ASSEMBLIES PER
 WPB UTILITIES.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2019-11-21 Cont ID  
Sent By shill Date 2019-11-21 Time 15:34 Rev Time 0.00
Received By shill Date 2019-11-21 Time 15:34 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2019-11-21 Cont ID  
Sent By llouie Date 2019-11-21 Time   Rev Time 0.00
Received By llouie Date 2019-11-21 Time   Sent To  
Notes
2019-11-21 12:52:00ZONING APPROVED WITH THE FOLLOWING PROVISO:
  
 1.) TEMPORARY CONSTRUCTION TRAILER SHALL BE REMOVED
 WITHIN SEVEN (7) DAYS OF THE FINAL CONSTRUCTION
 INSPECTION BY THE CITY AND PRIOR TO THE ISSUANCE OF A
 CERTIFICATE OF OCCUPANCY. [ZLDR S.94-273(D)(74)]

Review Stop Z ZONING
Rev No 1 Status F Date 2019-11-20 Cont ID  
Sent By llouie Date 2019-11-20 Time   Rev Time  
Received By llouie Date 2019-11-20 Time   Sent To  
Notes
2019-11-20 11:06:49** FAILED **
  
 PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE
 COMMENTS IN WRITING AND/OR ON THE PLANS WHERE
 APPLICABLE:
  
 1.) SITE PLAN SHOWING THE LOCATION OF THE PROPOSED
 CONSTRUCTION TRAILER ON THE PROPERTY IS REQUIRED.
 SETBACK DISTANCE FROM THE PROPERTY LINE(S) MAY BE
 NECESSARY.
  
  
 NOTES:
  
 * TEMPORARY CONSTRUCTION TRAILER SHALL BE REMOVED
 WITHIN SEVEN (7) DAYS OF THE FINAL CONSTRUCTION
 INSPECTION BY THE CITY AND PRIOR TO THE ISSUANCE OF A
 CERTIFICATE OF OCCUPANCY. [ZLDR S.94-273(D)(74)]
  
 * ANY REVISIONS MAY RESULT IN ADDITIONAL COMMENTS.
  
 * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE
 QUESTIONS.
  
 * ZONE: RPD (IBIS)
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved