Plan Review Details - Permit 19100924
Plan Review Stops For Permit 19100924
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2019-11-20 Cont ID  
Sent By jleahy Date 2019-11-20 Time 15:48 Rev Time 0.00
Received By jleahy Date 2019-11-20 Time 11:53 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2019-10-28 Cont ID  
Sent By fgiaquin Date 2019-10-28 Time 07:21 Rev Time 0.00
Received By fgiaquin Date 2019-10-28 Time 06:34 Sent To I
Notes
2019-10-28 07:21:03ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1. VALUE LOW FOR AMOUNT OF WORK SHOWN.
  
 CITY ORDINANCE AND FBC 109.3 BUILDING PERMIT
 VALUATIONS. IF, IN THE OPINION OF THE BUILDING
 OFFICIAL, THE CLAIMED VALUATION OF BUILDING,
 ALTERATION, STRUCTURE, ELECTRICAL, GAS, MECHANICAL OR
 PLUMBING SYSTEMS APPEARS TO BE UNDERESTIMATED ON THE
 APPLICATION, THE PERMIT SHALL BE DENIED, UNLESS THE
 APPLICANT CAN SHOW DETAILED, QUANTITY ESTIMATES, AND/OR
 BONA FIDE SIGNED CONTRACTS (EXCLUDING LAND VALUE) TO
 MEET THE APPROVAL OF THE BUILDING OFFICIAL. FOR
 PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS
 SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.
  
 2. PROVIDE LOAD STUDY AND LOAD CALCULATION IN
 ACCORDANCE WITH NEC 220.87 TO INCLUDE ALL LOADS, BOTH
 NEW AND EXISTING.
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE
 PREVIOUSLY REVIEWED SHEETS.
 CODES IN EFFECT:
  
 IF THE RESUBMITTAL IS NOT PREPARED BY A DESIGN
 PROFESSIONAL (ARCHITECT OR ENGINEER), AND THE PAGES ARE
 11X17 OR SMALLER, YOU MAY RESUBMIT, ALONG WITH A
 COMPLETED RESUBMITTAL FORM, VIA EMAIL TO
 [email protected]. THE EMAIL SHOULD INCLUDE THE PERMIT
 NUMBER AND "RESUBMITTAL" IN THE SUBJECT LINE. THE
 RESUBMITTAL FORM CAN BE FOUND AT THIS WEBSITE:
  
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
  
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE 2017 6TH ED.
 FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 V/R,
  
 FRANK GIAQUINTO III
 ELECTRICAL INSPECTOR
 ELECTRICAL PLANS EXAMINER
 CITY OF WEST PALM BEACH
 [email protected]
 CELL: 561-657-1653
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-11-20 Cont ID  
Sent By jleahy Date 2019-11-20 Time 15:48 Rev Time 0.00
Received By jleahy Date 2019-11-07 Time 10:58 Sent To E
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-10-28 Cont ID  
Sent By fgiaquin Date 2019-10-28 Time 07:21 Rev Time 0.00
Received By fgiaquin Date 2019-10-17 Time 13:19 Sent To  
Notes
2019-10-18 13:19:13ROUTED TO MECHANICAL INBOX

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2019-11-20 Cont ID  
Sent By ccole Date 2019-11-20 Time 11:18 Rev Time 0.00
Received By ccole Date 2019-11-20 Time 10:16 Sent To E
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2019-10-23 Cont ID  
Sent By ccole Date 2019-10-23 Time 07:55 Rev Time 0.00
Received By ccole Date 2019-10-22 Time 17:04 Sent To E
Notes
2019-10-23 08:38:081ST REVIEW FBC-2017 MECHANICAL
 PERMIT #19100924
 10/23/19
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SHEET M-401: PROVIDE EQUIPMENT SCHEDULES FOR THE NEW
 AHU- 7-1, 7-2, & 7-3- SECTION 107.2.1 WPB.
  
 2) PROVIDE A CONDENSATE DISPOSAL PLAN FOR THE NEW FAN
 COIL UNITS- SECTION 307.2.1 FBC M.
  
 3) SHOW ALL REQUIRED CHANGES TO THE REFRIGERANT LEAK
 DETECTION AND EMERGENCY VENTILATION SYSTEMS TO
 ACCOMODATE THE NEW R134A CHILLERS- SEE SECTION 1105 FBC
 M.
  
 4) A RIGHT OF WAY PERMIT MAY BE REQUIRED TO SET UP THE
 CRANE UP AT THE NW CORNER OF THE BUILDING. PLEASE
 CONTACT THE CITY OF WEST PALM BEACH ENGIJNEERING
 DEPARTMENT (561) 494-1128.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved