Plan Review Details - Permit 19100555
Plan Review Stops For Permit 19100555
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-11-04 Cont ID  
Sent By rmcdouga Date 2019-10-30 Time 17:22 Rev Time 0.00
Received By rmcdouga Date 2019-10-30 Time 17:22 Sent To I
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-10-15 Cont ID  
Sent By rmcdouga Date 2019-10-15 Time 08:04 Rev Time 0.00
Received By rmcdouga Date 2019-10-15 Time 07:59 Sent To  
Notes
2019-10-15 08:07:41PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT SIGNED AND SEALED GENERATOR PAD AND ANCHORING
 DETAILS. THE ONES THAT WERE SUBMITED ARE COPIES.
 61G15-23.003 PROCEDURES FOR PHYSICALLY SIGNING AND
 SEALING PLANS, SPECIFICATIONS, REPORTS OR OTHER
 DOCUMENTS.
 ENGINEERING PLANS, SPECIFICATIONS, REPORTS OR OTHER
 DOCUMENTS WHICH MUST BE SIGNED, DATED AND SEALED IN
 ACCORDANCE WITH THE PROVISIONS OF SECTION 471.025,
 F.S., AND RULE 61G15-23.001, F.A.C. MUST BE PHYSICALLY
 SIGNED, DATED AND SEALED AS PROVIDED HEREIN BY THE
 PROFESSIONAL ENGINEER IN RESPONSIBLE CHARGE.
 (1) THE LICENSEE SHALL SIGN BY HAND AN ORIGINAL OF THE
 LICENSEE?S SIGNATURE ON EACH PAGE REQUIRED TO BE
 SEALED. A SCANNED, FACSIMILE, DIGITALLY CREATED OR
 COPIED IMAGE OF THE LICENSEE?S SIGNATURE SHALL NOT BE
 USED.
 (2) THE LICENSEE MUST THEN USE A WET SEAL, A DIGITALLY
 CREATED SEAL, OR AN EMBOSSING SEAL PLACED PARTIALLY
 OVERLAPPING THE LICENSEE?S SIGNATURE ON EACH PAGE
 REQUIRED TO BE SEALED. THE PLACEMENT OF THE SEAL SHALL
 NOT RENDER THE SIGNATURE ILLEGIBLE.
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-10-16 Cont ID  
Sent By jleahy Date 2019-10-16 Time 08:16 Rev Time 0.00
Received By jleahy Date 2019-10-16 Time 08:16 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status P Date 2019-10-17 Cont ID  
Sent By lcrespo Date 2019-10-17 Time 07:58 Rev Time 0.00
Received By lcrespo Date 2019-10-17 Time 07:58 Sent To  
Notes
2019-10-17 07:59:2510/17/19 REVIEWED FOR CODE COMPLIANCE (GAS)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-10-30 Cont ID  
Sent By rmcdouga Date 2019-11-04 Time 10:49 Rev Time 0.00
Received By rmcdouga Date 2019-10-29 Time 15:35 Sent To  
Notes
2019-10-30 15:36:01RESUB ROUTED TO RMCDOUGAL

Review Stop I INCOMING/PROCESSING
Rev No 1 Status P Date 2019-10-17 Cont ID  
Sent By lcrespo Date 2019-10-17 Time 07:58 Rev Time 0.00
Received By lcrespo Date 2019-10-10 Time 14:12 Sent To  
Notes
2019-10-10 14:12:34ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 1 Status P Date 2019-10-11 Cont ID  
Sent By rfalcone Date 2019-10-11 Time 13:32 Rev Time 0.00
Received By rfalcone Date 2019-10-11 Time 13:32 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved