Plan Review Details - Permit 19100525
Plan Review Stops For Permit 19100525
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2023-02-22 Cont ID  
Sent By rmcphers Date 2023-02-22 Time 08:45 Rev Time 0.00
Received By rmcphers Date 2023-02-22 Time 08:45 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2022-11-28 Cont ID  
Sent By rmcphers Date 2022-11-28 Time 08:19 Rev Time 0.00
Received By rmcphers Date 2022-11-28 Time 08:11 Sent To  
Notes
2022-11-28 08:19:11CANOPY
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
  
 CORRECTIONS NEEDED -
  
 1) DRAWING - SHEET 330A SHOWS THE BOTTOM OF THE CANOPY
 FRAMING AT 7 FOOT FROM THE RAISED AREA (STAGE, RAISED
 DINING) - NEEDS TO BE A MIN. OF 7 FOOT 6 INCHES - - FBC
 3105.3.1.1
 FABRIC AWNINGS AND FABRIC-COVERED FRAMES LOCATED OVER
 PUBLIC PROPERTY OR IN AREAS ACCESSIBLE TO THE GENERAL
 PUBLIC SHALL BE CONSTRUCTED SO THAT NO RIGID PART OF
 SUCH FABRIC AWNINGS OR FABRIC-COVERED FRAMES SHALL BE
 LESS THAN 7 FEET 6 INCHES (2286 MM) FROM THE GRADE
 DIRECTLY BELOW, AND NO PART OF THE CLOTH DROP SHALL BE
 LESS THAN 7 FEET (2134 MM).
  
 2) DRAWING SD-5 - SHOWS ASCE 7-10 USED FOR THE WIND
 DESIGN - ASCE 7-16 SHOULD BE USED FOR THE WIND DESIGN
 PER 2020 FBC CHAPTER 35
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-06-12 Cont ID  
Sent By rmcphers Date 2020-06-12 Time 07:43 Rev Time 0.00
Received By rmcphers Date 2020-06-11 Time 15:55 Sent To  
Notes
2020-06-12 07:53:30CANOPY
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) PLEASE PROVIDE SIGNED AND SEALED (DIGITALLY SIGNED
 AND SEALED TO BE USED IN ELECTRONIC PLAN REVIEW) CANOPY
 DETAILS TO COMPLY WITH FBC 3105.4
 2) PLEASE PROVIDE THE FLAME SPREAD CERTIFICATE TO
 COMPLY WITH FBC 3105.6
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2022-11-21 Cont ID  
Sent By pleduc Date 2022-11-21 Time   Rev Time 0.00
Received By pleduc Date 2022-11-21 Time 10:19 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2020-06-15 Cont ID  
Sent By pleduc Date 2020-06-15 Time   Rev Time 0.00
Received By pleduc Date 2020-06-15 Time 10:51 Sent To  
Notes
2020-06-15 12:39:24THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
 1) THERE IS NO CERTIFICATE OF FLAME RESISTANCE ATTACHED
 FOR VERIFICATION AND CONFIRMATION OF LISTED PRODUCT PER
 NFPA
  
 25.2.2 FLAME PROPAGATION PERFORMANCE.
 25.2.2.1 ALL TENT FABRIC SHALL MEET THE FLAME
 PROPAGATION
 PERFORMANCE CRITERIA CONTAINED IN TEST METHOD 2 OF NFPA
 701,
 STANDARD METHODS OF FIRE TESTS FOR FLAME PROPAGATION OF
 TEXTILES
 AND FILMS. [101: 11.11.2.1]
 25.2.2.2 ONE OF THE FOLLOWING SHALL SERVE AS EVIDENCE
 THAT THE TENT
 FABRIC MATERIALS HAVE THE REQUIRED FLAME PROPAGATION
 PERFORMANCE:
 (1) THE AHJ SHALL REQUIRE A CERTIFICATE OR OTHER
 EVIDENCE OF
 ACCEPTANCE BY AN ORGANIZATION ACCEPTABLE TO THE AHJ.
 (2) THE AHJ SHALL REQUIRE A REPORT OF TESTS MADE BY
 OTHER
 INSPECTION AUTHORITIES OR ORGANIZATIONS ACCEPTABLE TO
 THE
 AHJ. [101: 11.11.2.2]
  
 PLEASE REVIEW AND PROVIDE THE CERTIFICATION SHEET.
  
  
  
 2) THERE ARE NO CANOPY FRAME DESIGN SPECIFICATIONS
 PROVIDED.
  
 NFPA
  
 1.7.12 PLANS AND SPECIFICATIONS.
 1.7.12.1 THE AHJ SHALL HAVE THE AUTHORITY TO REQUIRE
 PLANS AND
 SPECIFICATIONS TO ENSURE COMPLIANCE WITH APPLICABLE
 CODES AND
 STANDARDS.
  
 PLEASE PROVIDE THE CANOPY FRAME SPECIFICATIONS.
  
  
  
  
 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
  
 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-03-06 Cont ID  
Sent By aoliver Date 2023-03-06 Time 08:25 Rev Time 0.00
Received By aoliver Date 2023-02-21 Time 07:38 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-12-12 Cont ID  
Sent By aoliver Date 2022-12-12 Time 10:43 Rev Time 0.00
Received By aoliver Date 2022-11-18 Time 09:34 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-06-25 Cont ID  
Sent By lmarchan Date 2020-06-25 Time 15:07 Rev Time 0.00
Received By lmarchan Date 2020-05-26 Time 15:01 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2023-02-22 Cont ID  
Sent By rmcphers Date 2023-02-22 Time 08:45 Rev Time 0.00
Received By rmcphers Date 2023-02-22 Time 08:45 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-11-28 Cont ID  
Sent By rmcphers Date 2022-11-28 Time 08:20 Rev Time 0.00
Received By rmcphers Date 2022-11-28 Time 08:20 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-06-12 Cont ID  
Sent By rmcphers Date 2020-06-12 Time 07:53 Rev Time 0.00
Received By rmcphers Date 2020-06-12 Time 07:53 Sent To  
Notes
2020-06-12 07:54:05SEE BUILDING PLAN REVIEW

Review Stop Z ZONING
Rev No 4 Status P Date 2023-03-03 Cont ID  
Sent By ckimmerl Date 2023-03-03 Time 16:12 Rev Time 0.00
Received By ckimmerl Date 2023-03-03 Time 16:11 Sent To  
Notes
2023-03-03 16:12:04PER CONVERSATIONS WITH CRA AND HISTORIC PRESERVATION
 STAFF, AWNINGS HAVE BEEN RESTORED/PROPOSED IN
 ACCORDANCE TO THE HISTORIC CHARACTER OF THE STRUCTURE.

Review Stop Z ZONING
Rev No 3 Status F Date 2022-12-08 Cont ID  
Sent By ckimmerl Date 2022-12-08 Time 10:12 Rev Time 0.00
Received By ckimmerl Date 2022-12-08 Time 10:03 Sent To  
Notes
2022-12-08 10:12:071. SHEET SD-1; CANOPY EXCEEDS PERMITTED PROJECTION
 STANDARDS, MAXIMUM HORIZONTAL PROJECTION IS 20FT.
 PROPOSAL HAS CANOPY AT 21 FT. PLEASE ADJUST. (SEC.
 94-109 TABLE IV-5 AND FIGURE IV-5)
  
 2. SHEET SD-2 AND SD-3; THE AWNINGS DO NOT MEET THE
 MINIMUM PROJECTION STANDARDS, MINIMUM HORIZONTAL
 PROJECTION IS 3FT. PROPOSAL HAS AWNINGS AT 1.5-2FT.
 PLEASE ADJUST. (SEC. 94-109 TABLE IV-5 AND FIGURE IV-5)
  
 3. SHEET SD-3, THE AWNINGS DO NOT MEET THE MINIMUM
 PROJECTION STANDARDS, MINIMUM VERTICAL CLEARANCE ABOVE
 SIDEWALK IS 8FT. PROPOSAL HAS 7.5FT. PLEASE ADJUST.
 (SEC. 94-109 TABLE IV-5 AND FIGURE IV-5)
  
 CHRIS KIMMERLY, AICP
 URBAN DESIGN PLANNER
 [email protected] 822-1426

Review Stop Z ZONING
Rev No 2 Status P Date 2020-06-03 Cont ID  
Sent By elevesqu Date 2020-06-03 Time 09:55 Rev Time 0.00
Received By elevesqu Date 2020-06-03 Time 09:55 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2020-01-02 Cont ID  
Sent By elevesqu Date 2020-01-02 Time 09:22 Rev Time 0.00
Received By elevesqu Date 2020-01-02 Time 09:22 Sent To  
Notes
2020-01-02 09:22:08PLEASE PROVIDE THE FOLLOWING:
 DIMENSION FROM SIDEWALK GRADE TO BOTTOM OF AWNINGS -
 CMIN. VERTICAL CLEARANCE FROM SIDEWALK MUST BE 8 FEET
 (LOOKS TO EXCEED MIN.)
 DIMENSION FOR HORIZTONAL PROJECTION - MAX IS 8 FEET
 (LOOKS TO BE WITHIN MIN BUT PLEASE PROVIDE DIMENSIONS)
  
  
 RUNNING CONCURRENTLY WITH MAIN PERMIT 19100519
  
  
 LIZ LEVESQUE, URBAN DESIGN PLANNER
 [email protected] (PREFERRED)
 561 822 1426
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved